Roger R. Langomes

Sug-obon, Tabon,Bislig city

Surigao del Sur, Philippines 8311

+639*********

+639*********

ac4h6p@r.postjobfree.com

EDUCATION

Bachelor of Science in Mechanical Engineering

University of Cebu

155A Sanciangko St, Cebu City, Philippines

TRAININGS / SEMINARS

Southern Technological Institute of the Phils.

Mangagoy, Bislig City, Philippines

Process Instrumentation and Controls

June - Decemer1999

WORK EXPERIENCE

Position: C &I Commissioning Engineer

Duration: December 2016 – April 2017

Company: MITSUBISHI CORPORATION

Project: Balingasag Thermal Power Plant (3 x 55 MW)

Location: Brgy. Mandangoa, Balingasag, Misamis Oriental, Phililppines

Duties and Responsibilities:

Facilitate loop checking, Functional testing of Boiler (DCS TOSMAP) & Turbine (GE MARK VIe )

Logic testing & interlock verification for boiler &turbine.(DCS TOSMAP – GE MARK VIe)

Troubleshooting of Instrumentation & Control related issues during cold, warm to hot start-up and turbine rolling and loading.

Functional testing and verification of modulating, inching & on/off MOV’s( Rotork, Auma) & control valves (Siemens PS2, Fisher)

Provide support for Sub-contractors of scope and the responsibilities for pre-commissioning and commissioning activities

Provide and submit DCS spare parts lists to the Lead Commissioning Engineer.

Identification of systems and sub-systems by marking up of PFD’s and PID’s system definition

Participate in constructability analysis in order to meet project schedule

Provide guidelines/rules/regulations regarding the use and/or access to the DCS and associated equipment

Conducts analysis and performs troubleshooting during commissioning on the hardware of the process control system in coordination with I&C Technicians and EPC/Commissioning team.

Coordinate with construction department by defining of priority systems according with overall construction and pre-commissioning & commissioning plan and schedule.

Facilitate efforts to identify, gather and maintain monitoring plans during start-up of each system.

Position: Instrument Supervisor ( Pre-Commissioning)

Duration: April 2016 – December 2016

Company: Guam Advance Systems Inc.

Project: Therma Visayas Energy Project (2 x 150MW)

Location: Toledo City, Cebu, Phililppines

Duties and Responsibilities:

Conducts logic and interlock test on each system to verify if system automation is properly implemented as per design and specifications

Develop and Implement specific monitoring and plans for each team assigned in each system

Supervises installation of Instruments at field.

Supervises calibration of all Instruments prior for inspection.

Supervises installation of cable trays, conduit pipes

Supervises the installation of marshaling cabinets at CCB.

Supervises loop and functional testing on all plant control systems.

Oversee calibration, configuration and troubleshooting of field instruments.

Inspection of field instrumentation with respect to instrument data sheets, verification of manufacturer’s calibration reports, on-site calibration of instruments and testing.

Monitoring of sub-contractor activities, progress and all other related documentation.

Position: Instrument Supervisor (Pre-Commissioning)

Duration: July 2015 – December 2015

Company: DAELIM

Project: SM200 Phase I Project (2 x 100MW)

Location: Maasim, Sarangani Povince, 9502 Phililppines

Duties and Responsibilities:

Supervision & assistance of sub-constructors in-charge for loop checking of Boiler,(DCS – YOKOGAWA CENTUM VP) STG, BOP

In-charge of functional testing and loop checking of STG ( Fuji Electric)

Conducts Open Loop Control functional testing and commissioning for valves/pumps/fans/blowers in coordination with EPC/Commissioning personnel.

Supervision of loop checking for STG with Vendor of FUJI ELECTRIC.

Troubleshooting with Vendor of FUJI ELECTRIC for some loops at STG.

Prepare materials, equipments and tools needed for loop checking activities

Distribute manpower and monitor daily accomplishment for daily activity report.

Facilitate functional testing and verification of valves, modulating, inching & on/off MOV’s & control valves prior for functional testing.

Position: I & C Commissioning Engineer/ Function Test Engineer

Duration: May 2014 – May 2015

Company: SK E& C

Project: TUFANBEYLI THERMAL POWER PLANT (3 x 150MW)

Location: Tufanbelyi, Adana, Turkey

Duties and Responsibilities:

In-charge of DCS SPPA T3000 & Sıemens S7 PLC Commissioning phase,

Functıonal testıng for Sıemens Steam Turbıne (SST-700) systems

Supervision & assistance of sub-constructors in-charge for loop checking of Boiler (DCS - Siemens SPPA-T300) Water Treatment Plant, Auxiliary Boiler, Dry coolıng system (Siemens S7 PLC)

Functional testing and verification of steam by-pass valve (Bopp & Reuther), modulating, inching & on/off MOV’s( Rotork, Bernard Controls, Auma) & control valves (Siemens PS2, Fisher)

Functıonal testıng for start-up burners.

Executıon of DCO (Devıce Change Over) of CCW pumps for Close Coolıng Water System.

Calıbratıon of CID pıtch control blade for CID Aır & Flue Gas System

Involvement ın Boıler Refractory & Steam blowıng.

Lead In-charge of MATERIAL HANDLING SYSTEMS (limestone handling system, ash handling system, coal handling systems )

Functıonal testıng for Sıemens Steam Turbıne (SST-700) systems.

Superb Knowledge & Understandıng SPPA T3000, Sıemens S7 PLC.

Functional Testing for sub-group & function group commands as per system

Strict compliance of commissionıng approved procedures for each systems

Development of planning and scheduling of pre-commissioning and commissioning plan for entire projects and integration with Client planning for commissioning and start-up.

Assist construction departments by defining of priority systems according with overall construction and pre-commissioning & commissioning plan and schedule.

Preparation of scope and the responsibilities for pre-commissioning and commissioning activities

Define the organization chart and necessary resources for pre-commissioning and commissioning activities

Identification of systems and sub-systems by marking up of PFD’s and PID’s system definition

Participate in constructability analysis in order to meet project schedule.

Preparation of pre-commissioning, commissioning and start-up execution plan.

Supervision of 5 man troubleshooting team in-charge of Boiler & STG & BOP

Position: Instrument Engineer / QC Inspector

Duration: November 2012 – July 2013

Company: Daewoo E & C

Project: GNL – 3Z PROJECT (Oıl & Gas)

Location: Arzew Industrial Area, Oran, Algeria

Duties and Responsibilities:

Review the construction details and specification and ensure the sub-contractor meets the requirement of the job.

Carry out field engineering work.

Planning and executing the support fabrication & installation activities at site and implementation of Quality & HSE plans during construction.

As-built drawings as per site condition.

Implement project construction Quality Control requirements including in-process surveillance, and inspection and testing of completed installations to ensure that project quality requirements are being met

Prepare deviation reports to document non-conforming conditions as required

Provide technical direction to construction supervision and craft

Witnesses and documents calibration activities

Coordinating with vendor representatives

Provides responses to Technical queries

Position: Instrument Engineer / QC Inspector

Duration: November 2011 – November, 2012

Company: Daewoo E & C

Project: Algeria Oman Fertilizer Project (Petrochemical)

Location: Arzew Industrial Area, Oran, Algeria

Duties and Responsibilities:

Planning and executing the support fabrication & installation activities at site and implementation of Quality & HSE plans during construction.

Preparation DOISSER under ICAPS Management.

Facilitate Punch list clearance system sign off,

Conducts close out report hand over as built documents/drawings, survey changes, field changes / spares etc.

Prepare deviation reports to document non-conforming conditions as required

Ensures loop packaging is progressed and loop checks are carried out in accordance with project procedure

Review the construction details and specification and ensure the sub-contractor meets the requirement of the job.

Carry out field engineering work.

As-built drawings as per site condition.

In-charge of main cable & tray, secondary cable/tray & conduit, cable pulling, impulse tubing & airline, hydro test, leak testing, and assist pre commissioning team.

Rectify AFI’s as per comment of QC inspector (DEC) and owner (AOA),

Supervision and Monitoring of Inst. Installation, Instrument cable laying, conduit installation, JB installation, Hookup installation, inspection, calibration, Loop checking, site acceptance test

Inspection and supervision that work is done as per drawings and documentation.

Supervision and witness at pressure testing of air supply tubing, pneumatic impulse and hydraulic instrument tubing with the client and QA/QC team.

Supervision and witness at instrument calibration in calibration shop or in field to ensure that all instrument checked are as per data sheet and in conformity with project standard with QA/QC team.

Position: I & C Commissioning Technician / Function Test Technician

Duration: November 2010 – March 2011

Company: Kentz

Project: Ambatovy Nickel Cobalt Mining Project

Location: Toamasina II, Madagascar

Duties and Responsibilities:

Conducts loop inspection and checking, instrument devices calibration, modifications, vendors assistance,

Power-up each loop and test if it has a healthy sıgnal, simulate the parameters, check if the signal arrived to control room, test if alarms are triggered..

Troubleshooting, associated with documents (ITR -Inspection Test Records) and following CTP (Commissioning Test Procedure) and safety rules.

Checking and adjustment of range limits according with data sheet, verifying calibration and recalibration whenever it is necessary,

Verification and calibration of pneumatic, hydraulic and electrical, including modulating control valves and on/off shutdown valves.

Conducts functional test for sub-group systems to functional group systems

Identification of systems and sub-systems by marking up of PFD’s and PID’s system definition

Participate in constructability analysis in order to meet project schedule.

Preparation of pre-commissioning, commissioning and start-up execution plan.

Position: Instrument Technician

Duration: July 2008 – December 2009

Company: Consolidated Contractors Company (CCC)

Project: Ras Gas Onshore Expansion Project (RGX II)

Location: Ras Laffan Industrial City, State of Qatar

Duties and Responsibilities:

Handles MARK VI console with GE Technical Advisers Supervision for loop checking of GE MS6001B 40 MW Gas turbine and DCS console for loop checking and function test in the utility area and process.

Handles 3500 Management Monitoring System of Bently Nevada with Vendors Supervision for loop checking of vibration monitoring of MS6001B GT.

Inspect and test system to verify system compliance with plans and specifications and to detect malfunctions.

Conducts calibration of level sensor for Lube oil tank as per vendors modification, Gas Control Valves and Stop/Speed Ratio Valve as per vendor modifications .

Lay out and connect electrical wiring between controls and equipment according to wiring diagram, using electrician's hand tools.

Assist mechanics in diagnosing and repairing equipment for operating efficiency and safety factors.

Conducts simulation of level transmitters, level switches of Water Wash Skid.

Calibration and loop checking of level troll from field we put water to the sitting well and check if indication is correct on the MARK VI console.

Simulation of flame detectors in the combustion chamber using UV light torch.

Simulation of radial vibration sensors using TK III applying 5 points calibration, applying High alarm and High High alarm

Simulation of axial vibration sensors using TK III applying Low alarm. Low Low alarm and High high alarm

Loop checking of thermocouples such as type T, type K and RTD’s 3 wire and 4 wires using decade box.

Modification & verification of MOV for water wash system as per vendor request.

Modification & verificationof Damper Switch as per mechanical engineers request.

Function test of control valves, ESD valves from field to DCS as per vendor request for testing emergency shutdown link from mark VI to DCS .

Position: Instrument Technician (O&M)

Duration: May 2002 – March 2007

Company: PRI (Picop Resources Incorporated)

Project: Electrical Service Department (Power Plant AFBC Boiler)

Location: Tabon, Bislig City, Surigao del sur Philippines

Duties and Responsibilities:

Assist in planning, assigning and supervising the installation, servicing and repairing of instruments.

Inspect work in progress and upon completion for conformance with prescribed standards and safety regulations.

Assist mechanics in diagnosing and repairing equipment for operating efficiency and safety factors.

Prepare time and materials estimates for maintenance and repair projects.

Review incoming and completed work orders and maintains related records.

Manage stock and prepare requisitions for parts and supplies.

Perform other duties as assigned.

Wrap pipes in insulation and secures it in place with cement or wire bands.

Layout and connect electrical wiring between controls and equipment according to wiring diagram, using electrician's hand tools.

Cable Glanding and termination of analog wires input output modules.

Installing conduit pipes for instrument wires from field to control room building.

Fabrication of supports and tubing raceways.

Reassemble equipment and start unit to test operation.

Measure, cut, thread, and bend pipe or tubing, using instrument fitter's tools.

Cut and drill holes in floors, walls, and roof to install equipment, using power saws and drills.

Adjust system controls to setting recommended by manufacturer to balance system, using hand tools.

Inspect and test system to verify system compliance with plans and specifications and to detect malfunctions.

Inspect inoperative equipment to locate source of trouble.



Contact this candidate