B STEYN
Curriculum Vitae
Full Names: Bernard Steyn
ID Number: 751**********
Cell nr: 082-***-****
Email Address: ac46tf@r.postjobfree.com
Gender: Male
Language: Afrikaans/English
Citizenship: South African
Drivers License: Code EB (08)
Marital Status: Divorce
Dependants: 3
Criminal Record: None
Residential address: 22 Herbert st, Vanderbijlpark, Gauteng Personal summary;
My name is Bernard; I am a looking to joining a successful growth company where I will be able to utilize my current skills and experience as well as adding more to the list. I have extensive working experience in different fields, however the one field I find as my true passion would be working with people. I have 22 years working experience within the building, office, managerial work field. It gives me great pleasure to work with people and I see working with different kinds of people as a privilege. Unfortunately in to today’s tough economic field most companies only employ a person on a contract basis, which I had the privilege to work in different environments with different contractors, giving me a lot of training in different fields. I am a dedicated, reliable, passionate and hard working individual that is always looking for new and exciting ways to up skill myself and learn something new.
Salary Expectations: Negotiable on the ideal opportunity Notice Period: Available to start within 7 days negotiable Thank you for taking the time to view my CV and considering it for any existing or upcoming availabilities. I am most definitely looking forward to you your soonest response. High School attended: Goudrif High School
Level attained: St.8 (grade 10)
Year completed: 1991
College attended: DPA training
Level attained: Microsoft project 2000
Year completed: September 2007
Personal Details
Educational History
2 P a g e
Computer packages: MS Word
MS Excel
MS PowerPoint
MS Projects / Chan chart
Outlook Express
Internet Explorer
Acrobat Reader
Unipos
Employer: Camjet
Duration: 2017-05-01 – 2018-03-29
Position held Junior manager
Duties and responsibilities
Determine a Program for specific jobs
Quality control; time management and scheduling on site
Ensure customer satisfaction.
Liaison with Client on site.
Liaison with contractors and relay what is expected from Camjet, Managements duties
Managing staff on site.
OHS training
Weekly reporting.
Team performance
Manage sufficient deliveries of material and tools according the site requirements.
Vehicle/Truck reports
Payment tracking to different Depots
Overseeing 6 Civil teams with their Drivers and vehicles
Quotations for Client with Chan Chart project plan
Civil teams will repair or replace water and sewer pipe were needed, I will contact the Client to give feedback.
I will phone supplier to order material, and will give this information to the driver on site to go and collect
In cases where there is obstruction in sewer line, I will contact the client to ask for CCTV to be done. As this will speed up our progress, and will cut out unnecessary time .The obstruction can be located and be removed sooner, helping Municipalities, helping our environment and people Skills/Computer knowledge
Employment History
3 P a g e
In extreme cases we will close section of road for us to have a safe environment to work.
I will contact the client during all this phases, and in some cases were we have to close water supply to whole suburb, we have mini excavator to help up speed up the progress
Meeting on site with other service providers .( Neotel,Sasol Gas and Electrical departments )
We also have our own in-house tarring and cleaning teams, were we have to clean sewer spillage, and tarring were need be .
Managing Ditch Switch drilling machine, where we drill into existing pipe,and or for new line
To replace old or dislocated pipeline with HDPE pipe
Overseeing the welding of the HDPE pipes
Overseeing High pressure cleaning of sewer lines Reporting back to client if there is obstructions in the line, allocating the obstructions
Client will issue written confirmation for us to start excavating to remove obstructions
Overseeing the excavating, using mini excavator and team Replacing the section of pipe were the obstruction was
Overseeing the stages of replacing the broken and or dislocated sewer pipe. Excavating to backfilling to re- instating the road Reason for leaving
-
Employer: KH Civils
Duration: 2015.02.11 – 2017.04.28
Position held Project Manager
Duties and responsibilities
Managing staff and Sup contractors on site
Ordering Material for site trough office
Meetings with clients on site
Meeting with sup contractors on site
Weekly reports to MD
Quality control on sup contractors installations and products
Safety control of workers on site
4 P a g e
Register for workers on site
Planning schedule from start to finish
Planning of weekly work
Planning of daily work
Snag list to MD, and to Sup contractors
Final sigh off, key handover
Final documentation / Close off / Final payments released Reason for leaving
- Contract ended
Employer: Prestige Construction
Duration: 2014.09.29 – 2014.11.24
Position held Construction Foreman
Duties and responsibilities
Managing staff and Sup contractors on site
Ordering Material for site trough office
Meetings with clients on site
Meeting with sup contractors on site
Weekly reports to MD
Quality control on sup contractors installations and products
Safety control of workers on site
Register for workers on site
Planning schedule from start to finish
Planning of weekly work
Planning of daily work
Snag list to MD, and to Sup contractors
Final sigh off, key handover
Final documentation / Close off / Final payments released Reason for leaving
- Contract ended
5 P a g e
Employer: Pasuri Investment
Duration: 2014.08.18 –2014.08.22
Position held Sales representation
Duties and responsibilities
Receiving training of products
Motivational speaking
Peoples skills
Reason for leaving
- Training
Employer: Demelonic construction
Duration: 2014.07.28 – 2014.08.01
Position held Site foreman training
Duties and responsibilities
Training for finishing foreman on completes houses and snag list.
Meeting sub-contractors on site
Handing out daily work orders for crew
Liaising with plumbers and electricians
Meeting with landscapers on site to finalize plans Reason for leaving
- Training
6 P a g e
Employer: Camjet
Duration: 2013-06-10 – 2014-06-30
Position held Assistant manager
Duties and responsibilities
Determine a Program for specific jobs
Quality control; time management and scheduling on site
Ensure customer satisfaction.
Liaison with Client on site.
Liaison with contractors and relay what is expected from Camjet, Managements duties
Managing staff on site.
OHS training
Weekly reporting.
Team performance
Manage sufficient deliveries of material and tools according the site requirements.
Vehicle/Truck reports
Payment tracking to different Depots
Overseeing 6 Civil teams with their Drivers and vehicles
Quotations for Ekurhuleni with Chan Chart project plan
Civil teams will repair or replace water and sewer pipe were needed, I will contact the relevant Depot to give feedback.
I will phone supplier to order material, and will give this information to the driver on site to go and collect
In cases where there is obstruction in sewer line, I will contact the Depot to ask for CCTV to be done. As this will speed up our progress, and will cut out unnecessary time .The obstruction can be located and be removed sooner, helping Ekurhuleni, helping our environment and people
In extreme cases we will close section of road for us to have a safe environment to work.
I will contact the Depot during all this phases, and in some cases were we have to close water supply to whole suburb, we have mini excavator to help up speed up the progress
We also have our own in-house tarring and cleaning teams, were we have to clean sewer spillage, and tarring were need be .
Reason for leaving
- Contract ended
7 P a g e
Employer: B & V Mining
Duration: 2011 .11.04 – 2013.04.25
Position held Erector
Duties and responsibilities
Determine a Program for specific jobs
Installing rib and blocks according to drawings
Quality control; time management and scheduling on site
Ensure customer satisfaction.
Liaison with Client on site.
Liaison with contractors and relay what is expected from B & V Mining.
Managing staff on site.
Weekly reporting.
Occupational Health and Safety on site, team to perform to best with Occupational Health and Safety in place
Manage sufficient deliveries of material and tools according the site requirements.
Overseeing a team with 20 crew
Liaising with design team and Engineer about reinforcing being used
Ordering reinforcing steel from suppliers
Double checking reinforcing order again with Engineers drawings specifications
Steel beams, counter lever steel and reinforcing will be checked
When receiving steel on site, quantity and sizes of steel will be checked according to Engineers drawings
Lead time with steel company must be worked into project plan
Liaising with client that all electrical and or plumbing and other services to be installed
Overseeing the installation of the Rib and Blocks, according the Engineer drawings
All steel beams, counter lever steel and support beams to be in place and be assembled according Engineers specifications
Jacks, Props and scaffolding to be installed correctly and within Occupational Health and Safety act
Measuring site to place order for correct amount of concrete for the site
Order concrete pump (truck) to pump concrete onto slap
Meeting with Engineer on site to inspect slab, to his satisfaction we can poor/pump concrete
Team onsite ready for pouring/pumping of concrete
Levelling concrete
Collecting all documents, confirming the correct amount, quality of concrete ordered for this site
Cleaning of site
Waiting for 21 days, then removing of props, and arrange for transport of props and equipment back to office
Reason for leaving - Contract ended
8 P a g e
Employer: Lerumo
Duration: 2009.06.01 – 2011.10.23
Position held Project Manager
Duties and responsibilities
Determine a Program for specific jobs
Quality control; time management and scheduling on site
Emailing Photo reports to Head office, which was in Pretoria
Ensure customer satisfaction.
Working with Principal contractor hand in hand to reinforced concrete slab were bank vault was going to be positioned
Liaison with Client on site.
Liaison with contractors and relay what is expected from Lerumo and Standard Bank mangers
Managing staff on site.
Weekly reporting.
Weekly meetings with Principal -, Electrical – Aircon contractor
Occupational Health Safety meetings and plans for specific sites.
Planning the weeks progress, obstacles that we had encounter, how we did resolve the obstacle, and week ahead
Ensuring that we are on schedule for the delivery of furniture
Ordering furniture for site by sending and confirming delivery dates
Receiving furniture for the site, checking Quality and Quantity according to what was ordered
Reporting to Branch / Divisional and Security managers from Standard Bank
Manage sufficient deliveries of material and tools according the site requirements.
PC – Principal contractor (team with team leader),AC – Aircon Contractor (team with team leader) EC Electrical contractor ( team with team leader )
Preparing documents for handover
Cleaning of site
Doing snag list f or contractors to complete
Final handover / closing documents to Branch Manager
Site including: Lephalele, Kroonstad, Welkom, Empangeni rail, Melmoth, Northam, Angola, to mention a few
Reason for leaving
- Contract ended
9 P a g e
Employer: Dot Able (Demountable walls & Screens)
Duration: 2007.03.01 -2009.04.03
Position held Project manager
Duties and responsibilities
Determine a Program for specific jobs
Collecting drawings from Head office
Meeting with Manager about delivery schedule
Installing demountable walls and screens according to drawings
Quality control; time management and scheduling on site
Ensure customer satisfaction.
Liaison with Client on site.
Liaison with contractors and relay what is expected from Dot Able
Managing staff on site.
Weekly reporting.
Manage sufficient deliveries of material and tools according the site requirements.
Managed installation team with 12 crew and team leader / can also be more than 1 team on site, depends on site requirements
Preparing documents for handover
Checking all quantity’s and variation orders with client
Cleaning of sites
Final handover and sigh off
Sites including: Liberty Life, Johannesburg CBD; Braamfontein, Softline
(Woodmead, JHB), Standard bank branches, just to mention a few. Reason for leaving
- Contract ended
Employer: B Steyn Building Projects
Duration: 2006.01.15 – 2007.12.15
Position held Owner
Duties and responsibilities
Owner of small private business
Managing business
Budgeting to pay salaries, to make sure clients has paid deposit as agreed
Ordering material for sites
Paying suppliers on time for deliveries on time
Setting out
Scheduling sub-contractors for site
Managing staff on site
Building according to plans
Meeting with clients, architects, too pre plan action on building progress / phases.
10 P a g e
Meetings with sub-contractors, (electricians, plumbers), clients on a weekly basis
Determine salaries and determine costing for projects
Quotations for alterations or on extensions for houses
Managing crew of 30 plus
Reason for leaving
- Ending own business
Employer: De Abreu construction
Duration: 2005.01.15 – 2006.12.15
Position held Project Manager
Duties and responsibilities
Running of daily operations
Scheduling sub-contractors for sites
Working out achievable project plan for sites
Working with off shatter concrete
Re enforced concrete beams and foundations
Managing sub-contractors and staff on sites
Weekly meetings with sub-contractors
Weekly reporting
See to that targets are met, (project plan)
Inventory management for sites
Setting out
Building according to plans
Ordering material for site as needed, before its completed, with enough lead time for delivery
Reason for leaving
- Starting own business
Employer: De Abreu construction
Duration: 2003.01.15 -2004.12.15
Position held Site manager
Duties and Responsibilities
Running of daily operations
Scheduling sub-contractors for sites
Managing sub-contractors and staff on sites
11 P a g e
Managing own crew of 30 people
Weekly meetings with sub-contractors
Weekly reporting
See to that targets are met
Inventory management for sites
Setting out
Building according to plans
Ordering material for site as needed, before its completed, with enough lead time for delivery
Reason for leaving
- Upgrade to Project Manager
Employer: Nelly’s Homemade Products
Duration: 1998.11.01 – 2002.12.15
Position held Store room Manager
Duties and responsibilities
Manage daily operations
Ordering of products
Goods receiving vouchers of products received
Daily stock take and updating of products
Invoicing
Manage and stock control
Monthly stock take
Working on an Unipos system
Received training and training of other staff.
Creditors & debtors off reps
Meeting clients on regular basis, receiving orders from clients, delivery goods, with invoicing of goods
Ordering stock from our suppliers
Checking stock when suppliers do deliver and quality of stock. Reason for leaving
- Joining family construction business
12 P a g e
Employer: South African Post office
Duration: 1994.01.15 – 1998.10.25
Position held: Mail Processor
Responsibilities:
Working on high speed sorting machines
Dispatch mail to destinations
Driver of forklifts
Checking that the correct containers is loaded into correct trucks
Scanning of all containers into truck
Uploading of information onto system for records
Ensuring that truck keep to schedules
Supervising of staff
Reporting to manager
Liaison with staff for what is expected from them
Time table for staff
Determine work schedule for staff
Reason for leaving
- Joining family business
Employer: South Africa National service
Duration: Jan 1993.01.10 – 1993.12.15
Position held: Trooper infantry
Responsibilities:
Military training
Hand weapon training
Mortar training
Helicopter approach / embarking / disembarking
Radio communication with other platoons
Guarding / entrance control
Controlling vehicle access / entrance control
Reason for leaving:
Ending Military training
13 P a g e
Employer: South African Post Office
Duration: 1991.04.01 - Dec 1992.12.15
Position held: Mail processor
Responsibilities:
Receive training on high speed sorting machines
Working on high speed sorting machines
Dispatch mail to destinations
Reporting faults on high speed sorting machine to supervisor
Team building / liaison with staff
Reason for leaving:
Military engagement
*For interview availability, references, certificates or any Further queries regarding my CV, please do not hesitate to contact me.*