Kosta Nakollaris
** ********* **** *********, ** M9C 0C1
416-***-**** *.**********@*****.***
SUMMARY
Civil/Structural Engineer with 17+ years of experience in managing large scale construction projects across Europe and North America. Holder of a degree in Civil/Structural Engineering. Proven track records on directing projects wide operations, administering multimillion-dollar budget, negotiating contracts, controlling expenses, and developing efficiency and productivity. Ability to coordinate trades, build partnership and work collaboratively with designers, engineers, vendors, and local officials to ensure the timely and budget project implementation in compliance with Contract Requirements. Excellent highways and bridge experience, having worked on projects value
$15bil. With a strong technical engineering background, hands-on site experience, excellent communication skills and a strong work ethic, determined to continue my trajectory as a Senior PM/CM across major infrastructure projects. I bring forth expertise in teamwork specialized in Light Rail Transit routes, and major expansions to Toronto’s subway system and Heavy Civil Construction on Roads, Bridges, Highways etc. EDUCATION
Bachelor of Civil/Structural Engineering Oct. 2003- May. 2008 FIN-Civil Engineering University, Tirana,
Technical Skills
• Engineering Tools: HCSS-Heavy Bid Estimating Program; AutoCAD 2D, Tot Station, GPS, Auto Level
• Platforms: Windows, Microsoft Office package (word, excel, power point) MS Project, Blue BEAM.
• Training/Certification: C.E.T-OACETT; Metrolinx PTS RAIL Training, TOP (Truck Occupancy permit); Chemical Spill Response Plan. PMP ongoing certification. ENGINEERING EXPERIENCE
Project Manager EllisDon Corporation December 2022 – Present Project Lists:
TTC Castle Frank Station-Easier Access III (TTC and CoT) -$12mil
TTC Sherbourne Station -Easier Access III (TTC and CoT)-$11.5mil
Dufferin Street bridge Repair (City of Toronto and Metrolinx)-$4mil
Hurontario LRT construction (CoM,RoP,CoB,MTO)-$13Bil
• Provide overall construction management from pre-construction to completion including design, coordination, budget, and schedule in conjunction with the Superintendent.
• Prepare regular, timely and accurate billings for Owners, and ensure timely payment of subcontractor billings.
• Meet with Owners, Architects and other Stakeholders in a professional manner and have the ability to communicate effectively both the concerns and best interests of the company.
• Monitor, interpret and forecast a project’s cost reports ensuring they are in line with the estimate and maintain a positive cash flow.
• Submit project reports to Area Manager and communicate with management about project progress and areas of risk that need to be escalated.
• Budget preparation, estimating, forecasting and provide accurate breakdowns to maintain the Project execution within the project timelines and budget.
Kosta Nakollaris
27 Applewood Lane Etobicoke, ON M9C 0C1
416-***-**** *.**********@*****.***
Assistant Project Manager ACS-DRAGADOS INC. Aug 2021 – Dec 2022 Crosslinx Transit Solutions (CTS) is a design and construction consortium building the Eglinton Crosstown, comprised of four global and local leaders in transportation infrastructure: ACS-Dragados, Aecon, EllisDon and SNC-Lavalin. Project Lists:
Mt. Dennis Station
Elevated Guide- Way-West Portal
Railway Corridor
Avenue Station
• Evaluate design changes, specifications and drawing releases.
• Interface with client/subcontractors to provide project status reports and ensure project needs are met.
• Provides status and progress reports to Metrolinx, project team, and management.
• Manage project scope and change orders including negotiating, processing, and analyzing cost and schedule impacts.
• Oversees construction sites, general contractors, and workers to ensure a high level of quality and safety.
• Guarantees that all work is performed in accordance with approved manuals and procedures.
• Ensures that the project is constructed and documented in accordance with the contract documents.
• Coordinate and monitors schedule updates, invoices, and submittals.
• Assists in managing and reviewing the progress of contractors’ construction schedules.
• Manages the efficient delivery of subway corridor infrastructure elements through project activities including detailed design, preparation of contract documents, construction, contract management and commissioning activities.
• Delivers projects from initial conception through commissioning and transfer to Operations within scope, on budget and on schedule; oversees project activities to ensure compliance with good project management and construction practices as well as corporate design standards and applicable municipal, provincial and federal codes.
• Monitors objectives related to engineering, design standards / design review, technical specifications, document control, budget and work breakdown structures, project schedules, resource prioritization, and staffing requirements.
• Manages consultants’ tasks and performances with respect to conceptual design, reviews, and technical management. Project Coordinator Toronto Zenith Constructing Limited-ON March 2018 – Aug 2021 Heavy civil contractor specializes in Construction and rehabilitation of Hwy`s Roads and Bridges in North America, Project Lists:
MTO 2017-2020 -Hwy 403/ “Longwood Channel and Lower Princes Fall Outfall-Hamilton” Project: MTO 2018-2003 - Hwy 400 & 6th line”
MTO 2018-2008 -Hwy 427 and Rexdale Blvd”
MTO 2019-2010 -Hwy 427 and Bloor/ Burnhamthorpe / Rathburn Bridge Structures”
MTO 2019-2010 Hwy 401-Liverpool Rd Underpass and 3 Culverts Rehabilitation” Project: MTO 2019-2010 -Hwy 427/QEW/Dixie-Bridges and Hwy Rehab”
• Coordinating the demolition of an existing bridge Structure over the Etobicoke Creek, and the construction of a new Bridge Structure of 80m (L) by 56m (W), cast in place by 3 stages. This project is part of the Rehabilitation of the QEW and Hwy 427. The overall project was a Design, Build, Operate and Maintain contract with our scope being a lump sum contract with the construction joint venture.
• Developed an CP-Temporary Flow passage system while executing the new Build Bridges Construction, that was not foreseen in the contract document which gave us efficiency, safe and productively during execution and a gave a profit of
$3M of the system.
• Worked with the designers and our piling subcontractor to optimize the pile installation method (H-pile) and then sourced a more efficient drilling rig, and with a more streamlined installation sequence, productivity increased from the expected 1 pile/day to 2 piles/day. Overall, saving 3 weeks on the critical path. Kosta Nakollaris
27 Applewood Lane Etobicoke, ON M9C 0C1
416-***-**** *.**********@*****.***
• Along with Project Coordinator and Construction Projects Leader, manage and maintain official project records to include budgets, schedules, submittals, specifications, operations, and maintenance manuals and drawings.
• Implements change management routines to assess change requests, make recommendations, secure client approvals, and issue CO`s; NCR; CP; RFC, correspondences, claims assistance etc. Assesses change requests to determine impacts to scope, budget, schedule, quality, and risk.
• Prepare and submit client monthly progress billing, Invoices. Main activities
- Earthwork activities such as excavation, grading, and backfilling (approx. 70,000 m3)
- Asphalt and bituminous paving works (30,000 m2) and Fiber Reinforced Superpave 19(15,000 m2)
- Fast Truck Concrete repair (400 m2)
- Relocation of existing storm/sewer pipeline and build new storm/sewer line (Varies from 300mm to 1200 mm).
- Environmental protection (riprap, silt fence, geotextile, fiber roll, seeding, landscaping, control blanket, shrubs, and planting trees)
- Concrete work such as Concrete Barrier, Tall Wall Barrier, Asymmetric Tall wall Barrier, TCB`s etc.
- Noise Barrier System(5m)-800m-Protection System, Demolishing the existing Bridge at QEW-Etobicoke Creek ( 70m X 48m)
- Build the New Concrete Bridge over EC at QEW (24m X 350m), fabricate and erect the prestressed concrete Girders NU 1200.
- Jacking the existing Bridge Structure and replacing the bearings
- ATMS electrical construction ($6 mil)
- Augering Piles for the new Bridge construction (450 m of fi-800 mm); Abutment H-Pile installation (HP 310X132), Project Manager Copri Construction Enterprise WLL Jan 2015 – Sep 2017 Abu Dhabi Contracting company specialized in construction of “Roads, Highways, Airport Runways, Bridges and Concrete Structural Works.”
Project: “The Construction of Tirana Northern Boulevard and its relevant civil works” $ 48,000,000.00
• Issue a CP-Revised Design Drawing of the 3 flour Underground Parking to decrease negative impact to the Community
(such as expropriation, noise etc.), safe and productively during execution and a gave a profit of
• $1.8m by the new system., change the egress/Ingress and increase the Parking area by 34 spots.
• Helped introduce chemical grouting techniques/material to the client and designer for ensuring the best Project implementation. Established a strong relationship with a market-leading supplier to ensure the highest quality and service was delivered to the client.
• Successfully executed two projects using a combination of polyurethane and acrylate grouts to provide leak sealing and groundwater cut-off where conventional methods had been unsuccessful.
• Oversaw the installation of a double corrosion protection foundation system in challenging ground conditions.
• Encountered unforeseen issues with groundwater ingress but maintained a tight schedule and completed the project on time and in budget.
• Construction of a secant pile wall and bearing piles to facilitate the construction of a sub-basement excavation and UP of the New Boulevard facility. 398no continues shoring piles constructed. Main activities
- Expropriation (procedures and safety condition during demolishing process)
- Finishing works (screed, bituminous membrane layers, flour dust concrete layer, epoxy resin layers for flouring-marking and signaling for the traffic management circulation) at the Underground Parking 2-flors
- Construction of two Substation Cabin 2*500 kVA (procedures from the authorized entity to the Connection Energy power source point)
New Urban Roadway (Main Boulevard carriageway) with asphalt paving (2 carriage way by 3 lane, 2 lanes to be used for traffic cars circulation and 1(one) dedicated lane-for Bus and Taxi circulation). Kosta Nakollaris
27 Applewood Lane Etobicoke, ON M9C 0C1
416-***-**** *.**********@*****.***
- Pavements works (134,000 m )-paved with granite tiles (sidewalk for pedestrian, Squares @ 350 m, lateral roads, bicycle lane etc.
- Transversal underground utilities pipes (Irrigation, electrical, sewage, water supply etc.)
- Sewage and water main system, asphalt and bituminous paving works Road marking and road ancillaries Construction Manager Green Line Trading and Contracting W.L. L Jan 2014 – Jan 2015 Kuwait-Saudi Arabia-Heavy Civil Engineering, Roads & Bridges, Trade, Urban Development etc. Revenues of approx. US$360m
Project: “Construction of Durres By-Pass”
• The project consisted of a Building of a new FLYOVER Interchange that interconnects Durres City, Port Authority, New Ring Road bypassing the city under a Design, Build, Operate, Maintain contract.
• Developed a Revised Design-Build that instead of building an Overpass Structure with 5 spans by 20 m long, the proposal we presented was 3 spans of 40m, 40m and 20 m, this facilitated easiness and fast circulation in the traffic flow... With my technical office we represented a completely set new Design Structure with a new girder lengths production. Overall savings were 2 months on the critical path and a revenue of $800K.
• We propose to implement a new RSS system for the Ramps of the Flyover, by decreasing the backfilling material, giving a saving to the Client of $300K, by adding an extra lane to the Project, using less Expansion Jnt, Bearings. Durres City is known for the tourism attraction and this Project was in the heart of the city and it is well known as a successful implementation.
Activities
- Construction, Design Revision and Project implementation of the FLYOVER (Concrete Bridge structure and a city Interchange implementation (2x carriage way by (100*11.5m).
- Fabricating/ posttensioning concrete girders H*L*B=2*40*0.5m (Jacking, injection and installing the girders)
- Box-culvert and pipe culvert structures. Construction of a railway path of 7.0 km,
- Construction of an Overpass concrete structure with 3 spans @ 15mx8m
- Constructing of a Keystone RSS wall with geo-gridding support (global stability)
- Construction of 7.00km ring city new road with 2(two) carriage way and double lane, width of 2*10.0m
- Shoring & Piling works (Drilling, steel reinforcement, casting) 104 pcs with L=32 m
- Landscaping works
Construction Manager J.V ``Alb building & Copri Construction`` LTD Jan 2011 – Jan 2014 Abu Dhabi Contracting company specialized in construction of “Roads, Highways, Airport Runways, Bridges and Concrete Structural Works”.. Revenues on the project $3.4mln Project: “Reconstruction of the road Kukes- Shishtavec Lot #2”
• I followed step by step the execution of the Project daily on-site activities, by negotiating, revising, building the field team on each step, and creating and maintaining the relationship with the Client, vendors, giving hiring opportunities to the cities and areas around.
• Assisting the GC on Building a Hydropower HEC 28.3 mega with a H=92m and a pipeline length of 5400 lm,5 branches of central points, Installation of a pipeline is from ø800-100mm (steel cover by bitumen element, connection and fixing of pipes is by wielding); and ø 1200 ø2600mm (fiber glass, connecting and fixing of pipes id done by neoprene epoxy component against the moisture)-was a success.
• As a Civil/Structural Engineer we Design-Build 2 Bridges as a part of the project of 40m and 30m.
• Constructing a New Urban Road of total length 6km, fabrication and installation of posttensioned concrete beams (Jacked and injected on site accordingly),
• Bituminous asphalt paving works. Landscaping and grass cultivation works. Kosta Nakollaris
27 Applewood Lane Etobicoke, ON M9C 0C1
416-***-**** *.**********@*****.***
PC/Ass CM J.V ``Alb building & Copri Construction`` LTD Nov 2008 – Jan 2011 Abu Dhabi Contracting company specialized in construction of “Roads, Highways, Airport Runways, Bridges and Concrete Structural Works”.. Revenues on the project $16.0mln Project: “Kukes – Kalimash– Rexhepaj Lot #8”
• Constructing a new National Hwy with two carriage way and double lane 2*2*11 m
• Constructing of 4 New Viaduct Bridges Structures (L tot = 880 m * W=2*12 m * H max 78.5 m)
• Fabricating and installing of 236 pieces(40*2*0.6m) of posttensioned Girders (Jacked and injected on site accordingly)
• Box and Pipe Culverts structure, Key-stone RSS wall (175 000 m ) with geo-grids material support, and protection walls
• Landscaping, Road marking and protection works (steel fence, -wire mesh and mac-mat
• Specialized for reinforcements concrete structures (Bridgeworks), Constructing, and executing of 2(two) Bridge structures L=51 m, and L=17 m with prefabricated Girders.
• Preparation of the measurements sheets and work-shop drawing (IPC) and all the necessary documents, --As built drawing, and final measurements sheets for the Taking Over of the project, preparation of the measurements sheets drawings,
• Managing and supporting the Technical Office staff with contract documents which is obligation, contract requirement and Contractor duty as per the TS condition of the GCC of Fidic Contract (Green book)
• Daily inspection sheets, daily Site diary, weekly work programs, Monthly Report. Quantity Surveyor/Str Engineer Euroteorema Group LTD Oct 2007 – Oct 2008 Italian General Contractor specialized in construction of “Roads and Bridges and prefabricated structures”. Project: “Reconstruction of the road Pogradec-Korce”3rd Lot
• Developed execution plans for estimating work, including formwork selection and optimization, girder erection, piling selection for multiple types of structure. False-work development for constructing cast in place spans over live traffic.
• Responsible for Project Engineering work for the Structures group on Segment 3, with special focus on Girder erection, EPS, Approach Slabs and Expansion joints. As Project Engineer, I had responsibility for cost reporting and forecasting all work for the structures group, as well as managing the Field and Lead Engineers.
• Coordination with the owner on Quality matters as well as being involved in training of our foreman and craft workers are other main duties.
• Daily coordination with other operations for safe and productive operations. coordinating crews do various types of structure work, including substructure, superstructure, and girder erection. Responsible for onsite quality inspections and ensuring our policies are followed in the field.
• Improved installation and removal of pier cap false work by modifying the design to be less labor intensive, saving approximately 50 man-hours per pier cap.