NICHOLAS S. GAUDINO, P.E.

**** *********** ******

Bronx, New York 10461 – 1848

(718) 409 – 4174 ( Residence )

(917) 502 – 5123 ( Cell Phone )

******@***.*** ( e-mail )

CIVIL ENGINEER / PROJECT MANAGEMENT & ADMINISTRATION

Profile:

New York State Professional Civil Engineer with expertise in heavy and marine construction.

Design engineering coordination with reference to value engineering proposals, field change condition alternative engineering, proposed design work constructability and economy reviews. I have worked closely with both Engineer of Record and Facility Owner to prepare engineer’s estimates and bid proposal documents and drawings.

My skills consist of project management and supervision; cost estimating; CPM scheduling; contract administration and document control; quality control and assurance; and health and safety; management and logistical co-ordination of subcontractors and material suppliers; construction engineering of temporary structures and concrete form designs. A full appreciation and work ethic to deliver a project on time and within budget while working safely!

Professional Experience:

CES Consultants, Inc, Long Island City, Queens, New York 2016 to 2017

Resident Engineer – NYC DDC, Church Ave Reconstruction, Contract # HWKP 2027

Sewer, Water Main, Curb, Sidewalk and Pavement Improvements

GPI – Greenman Pedersen, Inc. Babylon, New York 2012 to 2016

Arora Engineers, Inc. Chadds Ford, Pennsylvania

Project Engineer working for the Port Authority of New York and New Jersey.

My function was construction inspection oversight and contract administration of schedule, monthly invoicing, extra work, and project completion closeout for final acceptance with reference to: Berth #6 Reconstruction, Berth #14 Demolition, Berth # 34 Bollard Replacement and Berth # 14 Reconstruction. I have a very strong working relationship with Port Authority Geotechnical and Structural Engineers to facilitate field change condition engineering solutions to save time for the contractor and save money in additional extra work charges to the Port Authority.

Michael Baker Engineering, Inc. White Plains, New York 2009 to 2012

Resident Engineer with SBG - JV, a CM tri-venture of Shaw, Baker & Gannett - Fleming; on a New York City, Department of Environmental Protection, Waste Water Treatment Plant project, at Newtown Creek, in Greenpoint, Brooklyn. I oversaw civil aspect of new construction of the Central Residuals Building. This is a Wick's Law contract with a total value of over $355 million, covering four prime contractors. The structure contains secondary screens, degritting and skimming equipment which segregates and channels this primary treatment residual to dumpsters for disposal. This treatment process has a Consent Order Decree Milestone of $20 million from the state and federal authorities that will be achieved more than one year ahead of schedule for the City of New York. This time frame was maintained using a hands on approach to resolve a multitude of Request for Information submissions with a commitment of partnering with the owner, engineer of record, contractor and inspection staff. This required engineering directives, alternatives and implementations to be instituted in a timely fashion with the cooperation of all parties to have an attitude of “Do It Once and Do It Right” frame of mind.

Halcrow (formerly Hans Padron Associates), New York, New York 2007 to 2009

Specialists in the provision of planning, design and management services for infrastructure development worldwide.

Principal Engineer

Design Engineering Coordination to maintain delivery schedules that contained a finish product that met owner function specifications and maintained the economy of constructability

Engineering and Construction management, project administration and cost estimating

Concept estimating and design value estimating, project scheduling

Project administration of projects under resident engineering contract

Due Diligence Project Auditing of inspection service quality, structural soundness and value feasibility

Shell Oil LNG offshore terminal in Dubai, U.S. Naval Facility in Guam

Valero Refinery, Paulsboro, New Jersey, U.S. Coast Guard Facility, Cape May, New Jersey

Norfolk – Portsmouth Midtown Tunnel addition; utilizing submerged segmented tunnel methodology on the Elizabeth River in Virginia

Goldman Sachs Building, Site # 26, Battery Park City, N.Y.

Trevcon Construction Company, Liberty Corner, New Jersey 2005 to 2007

Framing successful solutions to the most challenging construction projects both on land and in marine environments.

Project Engineer

Brooklyn Passenger Ship Terminal, Pier # 12, Brooklyn, New York, Port Authority of New York and New Jersey

Administrating heavy marine projects, cost estimating, temporary structure design and engineering, concrete formwork design and implementation. The coordination of form rental companies to expedite cast-in-place concrete progression to meet accelerated job completion deadlines.

AECOM (formerly DMJM+HARRIS), New York, New York 2001 to 2005

A global provider of professional technical and management support services.

Project Manager

$175 MILLION project, the Staten Island Ferry Whitehall Terminal, at the foot of Manhattan, required multi phase, sequenced construction, while maintaining an operational terminal for the Staten Island commuter. Trade responsibilities were Demolition; to remove the existing ferry slips and terminal structure; Foundation, with rock socket caissons and pipe piles on land and water; cast-in-place concrete caps and grade beams with composite precast, cast-in-place slabs, Structural Steel erection and site work which permits continuous pedestrian and vehicle access to the operating ferry terminal. Assisting with other trades, namely: mechanical, electrical, plumbing, concrete work, masonry and curtain wall contractors. The foundation work was adjacent to the Battery Park Underpass and the subway tunnels of the #1/9 and #4/5 subway trains, requiring constant coordination with N.Y.C.D.O.T. and M.T.A. to insure no service disruptions for the riding public. Underground utilities of water, sewerage, gas, electric and communications were identified and relocated as necessary, and carried into the new facility.

Weeks Marine, Inc., Cranford, New Jersey 1998 to 2001

One of the leading marine construction and dredging organizations in the United States.

Assistant Project Manager and Project Engineer

Extensive use of NYSDOT MURK (extra work record keeping) to document major scope changes

The Rehabilitation of the Robert Moses Causeway, Southbound Bridge, over the Great South Bay

New York State Department of Transportation, West Islip, Suffolk, N.Y.

An $85 MILLION project, with a major value engineered component of precast roadway and girder monolith sections; prepared with the aid of AECOM design and Bayshore Precast fabrication shared with NYSDOT. This job required extensive concrete cap and pier rehabilitation, upon which was placed 6,710 LF of value engineered precast roadway sections; 2,640 LF of deep girder supported cast-in-place roadway; and, 1,100 LF of bow truss supported cast in place roadway. Structural steel rehabilitation was extensive in the deep girder and bow truss sections, with a special need to insure balanced construction loading at all times

Yonkers Contracting Company, Inc., Yonkers, New York 1995 to 1998

A well-established construction organization with technical, financial and managerial strengths that enable us to consistently deliver to our clients safe projects of the highest quality.

Assistant Project Manager and Project Engineer

Implemented and maintained Primavera P3 project schedule

Organized and maintained product delivery logistics,

The Edgemere Landfill Closure and Final Remediation

N.Y.C. Department of Sanitation, Far Rockaway, N.Y.

$40 Million project requiring 650,000 CY of fill covering over 106 acres of geomembrane, encapsulating a closed landfill, with a gas collection system of 100 wells, including piping and flare stack were installed to incinerate methane gas within the landfill.

Spearin, Preston and Burrows, Inc., (subsidiary) Insituform Metropolitan, New York, New York

Formulated, administered and maintained a computerized, organization wide cost control and financial forecasting system.

Computerized and assisted estimating department.

Implemented and administered quality control and safety programs for Insituform

Project Superintendent and Engineer to various projects:

Red Hook Container Terminal, Pier #10,

Port Authority of New York, Brooklyn, New York

Specialty Tanker Project at Piers # 1 AND 6

Exxon Company USA, Bayonne, New Jersey

Tanker Pier, Breasting and Mooring Dolphins

International Matex Tanker Terminal, Bayonne, New Jersey

Barge and Tanker Pier Modernization at the Bayway Refinery

Exxon Company USA, Linden, New Jersey

Nicholas Di Menna & Sons, Inc., Bronx, New York

Project Superintendent / Engineer

6,000 LF Cast-in-place Reinforced Concrete Double Barrel Monolithic Sewer

N.Y.C., Department of Environmental Protection, Greeley Avenue, Staten Island, N.Y.

Spencer, White and Prentis, Inc., Hackensack, New Jersey

Project Superintendent

5,600 LF of 48” Diameter HDPE Pipe

Peekskill Treatment Plant Outfall, Annsville Creek, Peekskill, N.Y.

Spearin, Preston and Burrows, Inc., New York, New York

Project Engineer and Superintendent

Renew and rehabilitate pier facilities for various oil companies; Hess, Shell and Chevron

Trans Atlantic Cable Burial, ATT Longlines, Green Hill Beach, Rhode Island

Siphon Marine Pipelines across the Norwalk River, Norwalk, Connecticut

Edward Fitzpatrick Associates, Inc., Williston Park, New York

Project Engineering and Contract Administration for Highway and Marine projects

Professional Status and Education:

Professional Engineer, New York State

10 Hour OSHA Construction Safety & Health Certified

NYC DDC Water Main Inspection Certification

MTA NYC Transit Track Safety Certification

Diploma in Building Construction Management, New York University, New York, N.Y.

Bachelor of Civil Engineering, Manhattan College, Bronx, N.Y.

Security Clearance:

TWIC – Transportation Worker Identification Credential

SWAC – Secure Worker Access Consortium

Memberships:

American Society of Civil Engineers and National Society of Professional Engineers



Contact this candidate