|
Resume alert |
Resumes 11 - 13 of 13 |
Orlando, FL, 32815
... Manufacturing Engineer __ Identified $605K in productivity projects of which $100K was achieved in less then a year __ Increased first pass yield from 60 to 90% and capacity from 3 to 6 Million filaments a day __ Overhauled the wastewater treatment ...
- 2010 Sep 03
Orlando, FL, 32828
... "Performance-based and Passive On-site Wastewater Treatment Systems Evaluation for Nutrients Removal", funded by Florida Department of Environmental Protection > Conducted water quality, soil adsorption and plant nutrient content data analyses > ...
- 2010 Aug 15
Edgewater, FL, 32141
... Obtained environmental wastewater and air discharge permits. Performed construction management and As-Built specification verification for extensive million dollar groundwater remediation system installed on the ground floor of a multi-level New ...
- 2010 Jul 26