Post Job Free

Vessel resumes in Algeria

Sign in
Search for: Jobs   Resumes


Resume alert Resumes 11 - 18 of 18

Supply Chain & Logistics

Algeria
... Fixing vessel with owners and finalizing C/P fixture. Finalizing competitive slot with feeder operators, Handle NVOCC, MLO’S Operations, Cross Trade Shipments and Re-export Shipments. Experience in BL/AWB Processing and other trade documents ... - 2019 Nov 04

Engineer Civil Engineering

Tizi Ouzou, Tizi Ouzou Province, Algeria
... 2020 API 653 tank inspection, repair Alteration, and reconstruction API 510 training (Algeria November 2014) API 510 Pressure Vessel Inspection, Rating, Repair and Alteration (certified 2015 and updated 2018) Lifting (Training) Training Institute: ... - 2019 Oct 12

Engineer Mechanical

Oran, Algeria
... NDE certificate LEVEL 2 RT, PT, MT BY ASNT and Level 2 UT certificate by cofrend EN 473 Job training Authorized Pressure vessel inspector API 510 and Authorized PIPING inspector API 570 ICAPS TRAINING Professional Experience Diploma mechanical ... - 2018 Jul 26

Control Plant

Staoueli - Alger, 16000, Algeria
... • Gas Compression (Electric Motor, Turbine (Gas) Driven Compressor) –Centrifugal, Reciprocating types, Cooling & Scrubbing, Slug Catcher Vessel • Acid Gas Enrichment, Sulphur Recovery unit (SRU). • Water Treatment, Gas Injection. •Start-up and ... - 2017 Feb 02

Manager Safety

Batna, Algeria
... Work carried out by Babcock and Al-Jabber Joint Venture Civil and Mechanical Work, Fabrication, Insulation Painting, Vessel erecting, Piping, etc. Responsibility Advised the management on implementing HSSE best practices aligned to local & ... - 2016 May 29

Maintenance/ Mechanical Specialist

Algeria
... Static Equipment as:, Vessel, cologne Heat Exchanger, Manual &Automatic Valves, PSV Safety Valves, Safety Vibration switches control etc… October 2007 – August 2009: Mechanical & Shutdown Preparation. - Working for BHP Billiton Ltd / Sonatrach ... - 2016 Apr 14

Plant Supervisor

Algeria
... - Progress &Witness all the cleaning, hydro testing, pipe erection, Test package, Lube Oil &Water Flushing, Air blowing of the system, Preservation of the equipments: Main Heat Cold Exchanger, Cold box vessel, loading arms, etc… -To do Commissioning ... - 2016 Feb 13

Engineer Management

Algiers, Algeria
... Risk Assessments in accordance with work packs for different SHUTDOWN activities and vessel entry - Review designs of new projects and plant modifications, to ensure that all safety requirements are included and provide recommendations accordingly. ... - 2013 Dec 15
Previous 1 2