BOUOUDEN REDA QA/QC ENGINEER
Marital status : married, 3 children
Nationality : Algerian
Address: Arzew, Oran, Algeria.
E-mail: *************@*****.**
Phone mobile : ALGERIE +213-***-***-***
Nearest International Airport :Ahmed Ben Bella Airport Oran Algeria
Education
Mechanical Engineer Diploma,
NDE certificate LEVEL 2 RT, PT, MT BY ASNT and Level 2 UT certificate by cofrend EN 473
Job training
Authorized Pressure vessel inspector API 510 and Authorized PIPING inspector API 570
ICAPS TRAINING
Professional Experience
Diploma mechanical Engineer with 17 years of experience in construction, maintenance and inspection of gas, petroleum domain and Ammonia & Fertilizer . Ability to analyze complex engineering problems, evaluate and recommend alternatives and communicate recommendations, effectively seeking for a position of piping / static equipment inspector or engineer.
Strong experience in control quality inspection,supervision (mechanical, piping, pipeline, welding and NDT, WPS,PQR, WQT,test pack)
Stong experience in shutdown activity :Mechanical/Piping and Pipeline Supervisor
Stong experience in Pipeline Engineer
QA/Qc manager
TOTAL ALGERIE
DECEMBRE 2017 TILL NOW :PROJECT BLENDING ALGERIE LOBP BETHIOUA
QA/Qc Mechanical/Piping ENGINEER
APAVE ALGERIE
JULY 2017 NOVEMBRE 2017
SONATRACH GNL 1 ARZEW Shutdown Train 200,Mechanical (Static EQUIPEMENT ) and Integrity inspection
Witnessed the ndt inspection and reviewed qualification of NDT technicians
Management of all Mechanical Static Activities covering all valves, safety valves, heat exchangers, pressure vessels, boilers, fresh water maker, filters and External, internal inspection during the shutdown to check the condition of equipment,equipment assembling,Follow up Valves Repair and Testing ( Seat Testing, Shell Testing) and Safety Valves Calibration
Provided assessment engineers with site data, records, documentation, photos, drawings and measurements for damaged items in order to verify the integrity of the equipment/piping, to establish repair work instruction documents .
Integrity Calculation: Calculation fitness for service of equipment/piping as per API 510,570 and API579
Establishment of procedure of repair for equipment / piping. Establishment of inspection Report/ recommendation for repair according to prevailing regulatory and codes
SITE MANAGER AND QA/QC MECHANICAL /PIPING ENGENEER
ABB Italy PROCESS AUTOMATION DIVISION
JANURAY 2016 JANURAY 2017
PROJECT :EPC for Revamping and expansion of Gas Metering Systems
Supervision of mechanical, piping, welding,civil,instrumentation and electrical activities for the Custody Flowmetering system project from the construction to start up of five(05) custody metering skid and two(02) custody metering skid retrofit.
Leaded a team of pipefitters/welders/mechanical fitters and general mechanical construction workers.-
Supervised the work performed by the sub- contractor; Reviewing the detailed engineering and drawings
Material reception(Flowmetering skids,Shelter,electrial equipement and instruments equipments
Follow up of the civil engineering activities
Preparation of Pré-commissionning and commissionning procedures
Preparation for cables scheduling
Follow up the cable trenching,cable laying,glanding and electrical wire termination
Installation of the supervisory system in the control room
installation of the electrical and control cabinet (UPS and Krohn flow meter )
Instruments hookup,testing
Managed the site construction team and conducted weekly meeting
Managed and supervised all quality related inspection and reporting at site
Coordinating all piping and welding inspection as per sub-contractor plan
Conduct test package line checking,punch clearing, confirmations testing and reinstatement
Supervise fabrication, erection, fit up and installation of pipe spools and valves
Reviewed quality control procedures and inspection test plan ITP according to standards
SENIOR QA/Qc Mechanical/Piping ENGINEER
PETROFAC UK
NOVEMBRE 2014 DECEMBRE 2015
In Amenas Management Services for the Repair and Commissioning of Train 3
reviewed and implemented project specific procedures, worked instructions and forms in conjunction with project team
Reviewed and preparation test pack
Coordinate hydrotesting
Witnessed the ndt inspection and reviewed qualification of NDT technicians
Preparation and reviewing of quality related documents, such as QCP, Inspection forms and communications with the client for approval.
Reviewed the status of WPS & PQR, attended weekly site meetings
Reviewed Quality Control procedures and inspection test plan ITP according to standards and specifications; Monitored weekly welding status such as repair rate, welder performance, NDT witnessing and interpretation. Monitored PWHT process and reviewed the PWHT charts
Achieved piping, vessel repair and hydro test activities.
Controlled painting/insulation & fire proofing repair activities.
Witnessed rotating equipment maintenance (compressors, pumps).
Checked physical close-out of site queries, non-conformance report and punch items.
Supervised the pre-commissioning and commissioning of rotary and static equipment: ).
Participated in risk assessment and tool box talks with sub-contractor’s work force and assist with the development of mitigation plans
Provided assessment engineers with site data, records, documentation, photos, drawings and measurements for damaged items in order to verify the integrity of the equipment/piping, to establish repair work instruction documents.
. Tracked the progress of Work Orders issued to maintenance department and produced weekly- & monthly reports for repair activities.
Supervised the demolition activities ( piping, structural,pumps-Motors-coolers) and replacement work with new ones.
Preparation scope of work for mechanical and piping related activitis
QA/QC SUPERVISOR piping &vessel (PVV) / welding/ NDT
TOTAL GABON
JANURARY 2014 AT October 2014
Project : Projet réduction Brulage
Supervisor and control of all piping erection, pipe support installation and hydrostatic test
Reviewed all project ITP and quality plans, coordinated all quality documentation review, managed the issuance of NCR’s
witnessed the NDT inspection and reviewed qualification of NDT technicians prior to start the NDT testing, attended weekly and monthly progress meetings.
Planned, organized and conducted internal audits and subcontractors external audits
Supervision and inspection of PVV and rotary equipment (pumps, compressor)
Ensure all check point have been completed and the unit ready for commissioning ( marked up P&ID for the unit, pre-commissioning report for the relative equipment’s
Monitored weekly welding status such as repair rate, welder performance and Films interpretation
SENIOR QA/Qc PIPING ENGINEER
HYUNDAI ENGINEERING CO, LTD
Fabray 2013 at JANURARY 2014
Field development BMS
Reviewed Quality Control procedures and inspection test plan according to standards and specifications.
Proven expertise in inspecting and maintaining wide range of Stationary and rotating machines.
Coordinating all piping and welding inspection as per sub contractor plan
Conduct test package line checking, punch clearing, confirmations testing and reinstatement
Managing and inspection shop fabrication
Coordinate hydrotesting with ARH
Supervision of the execution of tasks related to the pipeline activities,,excavation, stringing, welding,sandblasting, coating, sand bedding, laying down, backfilling, tie-in
Reviewed WPS/PQR as per ASME 9, API 1104 and specifications
INSPECTION internal cement lined pipes and fittings as per project specifications and standards including approved shop drawings and ITPs.
QA/QC MECHANICAL / PIPING INSPECTOR
MITSUBISCHI HEAVY INDUSTRIE, LTD.
July 2011 – Fabray 2013
Ammonia & Fertilizer ( 2 Train AMMONIA- UREA )
Supervision and inspection of PVV and rotary equipment ( pumps, compressor, gas turbine)
Coordinate hydrotesting with ARH
Supervise fabrication, erection, fit up and installation of pipe spools and valves
Managed and supervised all quality related inspection and reporting at site
Reviewed WPS/PQR as per ASME 9 and specifications
Reviewed quality control procedures and inspection test plan ITP according to standards
Prepare outstanding list with rectification plan and schedule for individual unit of the project IMC and mechanical compilation MC.
Preparing and maintaining various QA/QC documents and final test packages. .
Witnessing : pneumatic test, hydro-test,PMI, hardness, ferrite measurement
Conduct test package line checking, punch clearing, confirmations testing and reinstatement
Ensuring the works are performed in accordance with the specifications/Method statement and Inspection and Test Plan procedures
Proven expertise in inspecting and maintaining wide range of Stationary and rotating machines.
LEAD MECHANICAL / PIPING ENGINEER
ENGTP –SONTARCH
July 2006 – July 2011
Project : Mega train for treatment of 4.7 million ton natural gas /year
Managing the various crew qc inspector( ndt,piping, welding) and supervisor( welding, piping)
Coordinate construction and installation activities and confirm with engineering design and specification.
Coordinate hydrotesting with ARH
Managing the material and equipment’s to be used at site work
Managed the site construction team and conducted weekly meeting
PREPARE WPS and PQR according to ASME sec IX and reviewed Quality Control plan per ASME B31.3 for all subcontractors
Read and interpret technical drawing, calculations notes
Development of technical audit programs.
Supervision and inspection of PVV and rotary equipment (pumps, compressor, gas turbine),
Supervision of the execution of tasks of piping erection, welding, hydrostatic testing.
Supervising the execution of tasks related to the civil, and mechanical active
Development of technical audit programs.
Ensure the correct application and understanding of the procedures of the quality system.
Managing and inspection shop fabrication
Organizing meeting with the client
Supervision of the execution of tasks related to the pipeline activities,,excavation, stringing, welding,sandblasting, coating, sand bedding, laying down, backfilling, tie-in
QA/Qc MECHANICAL/PIPING ENGINEER
ENGTP-SONATRACH
Nov 2003 – Nov 2006
Project : Tiguentourine CPF process 29.85 million standard m3/day of feed gas (LPG and Condensate)
Supervision of static and rotary equipment (pumps, compressor, gas turbine, turbo expender)
General mechanical inspection of piping and coordination between technical office
coordinator work progresses with the main contractor and the client
Installation, inspection, erection, alignment & coupling, and testing, of horizontal/vertical pumps, Air coolers, heat exchangers, stabilizer column, and trays column erection.
preventive maintenance, misalignment & coupling, flushing the lubricating system, and bearings lubrication of the rotating equipment as pumps motors, turbo-expander, compressors turbines, and air coolers.
Installation, erection, and internal/external inspection of the static equipment as pressure vessels, filters, skids mounted, and stabilizer columns.
Structural steel (Ladders and Plate-forms) erection of the mechanical equipment.
My responsibility for the day to day supervision of mechanical contractors for the installation and construction . HS&E were a major priority and the monitoring and compliance with the relative company and client policies is an important part of the daily duties
SUPEVISOR ELEC/ INSTRUME
BONATTIE
Mars 2002 – Nov 2002
BRN HASSI MESSAOUD – Algeria
Preparation for cables scheduling
Follow up the cable trenching,cable laying,glanding and electrical wire termination
Installation of the supervisory system in the control room
installation of the electrical and control cabinet
Instruments hookup,testing