| Distance: |
Resume alert |
Resumes 331 - 340 of 16247 |
Eastlake, OH, 44095
... Hewitt 440-***-**** / **************@*****.*** /Eastlake OH www.linkedin.com/in/karen-hewitt-06623a32 WORK EXPERIENCE (cont’d) Cell Technician Staffworks Group, Willoughby OH October 2023-February 2024 •worked at Parker Gas Turbine Fuel Systems ...
- 2025 Jul 18
Kathmandu, Bagmati Province, Nepal
... Analyzing pressure waves caused by sudden changes in flow due to turbine startup, shutdown, or load changes. Calculate pressure fluctuations using tools like the Method of Characteristics (MOC) or finite element analysis. Study how the shared surge ...
- 2025 Jul 16
Queens, NY, 11355
... wind turbine towers, large solar panel structural support system, light gage storages, American Department of Defense and army facilities, numerous structural investigations, seismic upgrade, and retrofits of existing buildings, so on and so forth. ...
- 2025 Jul 16
Honolulu, HI, 96813
... Venoco – Offshore platform gas turbine, SCR, fuel gas revamp, PSA, well tie-ins, water treatment and injection. Irwin Industries – Pemex, offshore chemical injection skids. Vessel internals. TIC estimates for bidding. Matrix Oil – Relocation of ...
- 2025 Jul 16
B. F. Homes, 1717, Philippines
... Paranaque City : +63-915******* : *************@*****.***.** COMPETENCY Construction and Pre-commissioning Start-up Installation of any equipment like centrifugal pump, gas compressor, gas turbine and establish the centerline as per approve drawing. ...
- 2025 Jul 15
Cobleskill, NY
... General Electric Wind Power Systems Schenectady NY Position: SCADA IM Support Duration: April 2006 - September 2019 Responsibilities: oSupported GE wind turbine farms nationwide. oProvided deskside support for 3000 users at the Schenectady, NY ...
- 2025 Jul 15
Al Khor, Al Khor and Al Thakhira Municipality, Qatar
... oOverall Mechanical Maintenance in charge of GE Alstom Steam Turbine DKY2-1N34 including spare parts monitoring and procurement. oOverall Mechanical Maintenance in charge of Boiler Refractory Repair and Scaffolding Works. Achievement/s: oSuccessful ...
- 2025 Jul 15
Longview, WA
... semi hauler, front end loaders, Bobcats, forklifts) to facilitate and manage fuel piles and site maintenance • Worked on turbine deck and water systems to maintain safety compliance and facility function • Daily tests for water (steam, condenser, ...
- 2025 Jul 14
Warren, RI
... Documentation of Aerodynamic Geometry for analysis of Reynolds Numbers for NASA LS-1 30-meter turbine blade.3-D modeling for Finite Elemental Analysis and Wind Tunnel testing at NASA Jet Propulsion Laboratory of Langley Series -1 (LS-1) Turbine ...
- 2025 Jul 14
Banda Aceh City, Aceh, Indonesia
... Mooran/Kelien Equator Mining Location : Irian / Kalimantan Designation : Service Analyst Trainee From 01 September 1992 to 1 October 1992 Company : Exxon Mobile, Lhok Seumawe-North Aceh Project : On Job Training Designation : Gas Turbine Reference: ...
- 2025 Jul 14