|
Resume alert |
Resumes 31 - 40 of 115 |
Marlborough, MA
Matthew Sargent LT US Navy Reserve First Assistant Engineer Diesel/Steam Second Assistant Engineer Gas Turbine Home Address: ** ********** ****** ac7mpt@r.postjobfree.com Marlborough, MA 01752 Cell Phone: 757-***-**** Education Graduated 2009 from ...
- 2018 Nov 07
Somerville, MA
... Gitlab, Amazon EC2, Kafka, Locus, Jetty, Tomcat, RabbitMQ, Spring boot, Spring cloud, Eureka, Heroku, Zuul, Ribbon, Hystrix, Turbine, Sleuth, Zipkin, Logstash, Elasticsearch, Kibana Database: MySQL, PostgreSQL, Redis, MongoDB, Cassandra PROFESSIONAL ...
- 2018 Oct 21
Everett, MA
... attended project design examination meeting In 85-meter self-unloading sand boat turbine design project: fulfilled designing and drawing of shaft arrangement, tail shaft tube, jack shaft and rudder Jinling Ship Manufacturing Shipyard 05/2017-08/2017 ...
- 2018 Oct 15
Walpole, MA
... Comprehensive understanding of micromechanics of composites, wind turbine mechanical properties enhancement, and carbon fiber dynamic properties needed to successfully provide thermal and mechanical characterizations of materials. Possess excellent ...
- 2018 Sep 13
Newton, MA
... Heavy Lift Systems, Inc., Boston and Amherst, Massachusetts Led cutting-edge company focused on the installation and maintenance of green-energy wind turbine systems. FOUNDER AND CHIEF EXECUTIVE OFFICER (05/2009 to 08/2011) Designed and implemented ...
- 2018 Aug 24
Allston, MA
... Work Experience: Propulsion Division Intern National Aerospace Laboratories, India Nov 2015 - Jan 2016 Film and impingement cooling studies on turbine blades carried out in a modified subsonic cascade tunnel. Understood the effusion and impingement ...
- 2018 Jul 09
Milford, MA
... Network Systems Engineer, Turbine Inc, Warner Brothers Entertainment Industry Recovered and updated all network documentation, built and maintained a strong knowledge database of existing network toolsets, processes and technologies. Analyzed market ...
- 2018 May 29
Boxborough, MA
... Reliable Turbine ($400,000); HF Rubber ($1.4M); Demmer Affiliates ($2.5M); Owen Industries ($1.2M); Vi-Jon Laboratories ($1.2M). Proposals in final negotiations: Ehrhardt Tool ($1.2M); Mark Andy ($650,000); Standard Machine ($1.2M) VWR INTERNATIONAL ...
- 2018 May 24
Woburn, MA
... Mechanical Gujarat Technical University July 2011-May 2015 PROJECTS DESIGN & FABRICATION OF VERTICAL AXIS WIND TURBINE • Designed the 3D model of the parts involved on Pro-E/Creo, machined & welded the individual parts to form the entire assembly. • ...
- 2018 May 18
Boston, MA
... I, Transport Laboratory II, and Process Design and Development courses +Mentored over 70 students on final design projects such as hydrophilic piping and wind turbine wakes +Trained fellow teachers on experimental modules and operational methods
- 2018 Apr 16