... Installation & Inspection for Rotary Equipment include Padding, Elevation, Position, Orientation, Levelness, Pre Shaft alignment, Run-out, Void, Surveillance inspection during erection and welding of Piping, Pipe Strain, Motor / Turbine solo run, ...
- 2020 Jun 07
Patna, Bihar, India
... DF POWER SYSTEMS dealt with BTG project (Boiler, Turbine and Generator ) . At DFPS, I was looking after plant's Cable laying, earthing,lighting work, Installation -testing & Commissioning of LT, HT Panel & Power Transformers,Commissioning of MOVs ( ...
- 2019 May 24
Patna, Bihar, India
... Currently working as Shift IN-charge/ Shift Engg at M/S Shree Laxmi Cottsyn Fatehpur (UP) of 8MW turbine and AFBC Boiler of 50 TPH from April 2017 to present. Adept at handling various operations pertaining to operate and maintenance of various ...
- 2019 Apr 18
Patna, Bihar, India
... Exposure Mark-VI Control System for Gas Turbine (PGT-10 of GE NOUVO PIGNONE). GE FANUC CIMPLICITY SCADA (Plant Edition) System with GE FANUC PLC (Series 90-70) for ESD PLC in GE Gas Turbine Compressor. Bently Nevada Series-3500 for Vibration ...
- 2018 Sep 02
Patna, BR, India
... Training: Training 1: Company : BHARAT HEAVY ELCTRICALS LTD, HARIDWAR (UTTRAKHAND) Duration : 30 Days Specification : Telecommunication, Turbine (LP, HP, IP). Training 2: Institute : Zee-Net Institute of Computer Duration : 2 Months. Specification : ...
- 2018 May 10
Patna, BR, India
... (60*2) mw China make turbine Maintenance & operation. 3. Maintenance (130*3) TPH boiler& (60*2) mw Turbine. 4 .Maintenance of (18.5*3) MW Turbo Blower 5. To carry out Day-To-Day Corrective Maintenance and Ensure Preventive Maintenance for All ...
- 2017 Nov 04
Patna, BR, India
... e) Installation, testing, commissioning activities of “ 60 MW” Boilers and Turbine. 3. Employer : Kinetic Modern Construction Services Project : National Fertilizer Ltd. Guna Client : Halder Topsoc Denmark, Davy Ashmore Period : 01-12-1985 to 30-11 ...
- 2017 Oct 23
Patna, BR, India
... EDUCATIONAL QUALIFICATION:- Exam Board/University Percentage 10th B.S.E.B (Patna) 77.28 % 12th B.I.E.C (Patna) 59 % B.Sc Engg (Mechanical) Magadh University 76.33 % ACADEMIC PROJECT:- Design of Pelton Wheel Turbine and Simulation through “CATIA”. ...
- 2015 May 21
Patna, BR, India
... • Implementing the quality process for entire Gas-turbine system (SIEMENS V94.3) • Implementing the quality process for entire Steam-turbine System (ALSTOM) • 9 271 MW Power Plant Unit including 6 Gas Turbine & 3 Steam Turbine units. • Implementing ...
- 2013 Nov 10
PATNA, BR, India
... to Dec.2004 in Heavy Engineering Industries & Ship building Company Kuwait, as a Safety Supervisor of various Petrochemical Refinery Projects and Mechanical Maintenance Services (MMD) like oil field maintenance services, Gas turbine maintenance etc. ...
- 2011 Oct 09