RESUME
Post applied for Sr. Supervisor/ Engineer
Personal Profile:
Name: Abdul Mannan Ansari, S/O Mr. Md.Hanif Ansari an Indian. My mother's name is” Fatima bibi” and spouse's name is Rafiya khatoon.
I am a Male-Muslim. Date of birth is 02 January 1957 (58 Years old).
My qualification is 10+2 then Bachelor of diploma in mechanical.
I have 16 years Gulf experience and 12 years of Indian industries.
My Passport details: Passport no- K-5285397, Valid upto-12-06-2022
Issued from Abu Dhabi.
Communication Address: .Abdul Mannan Ansari
Professor colony, Road-18
At & post – Azad nagar, Mango
City- Jamshedpur, Jharkhand, INDIA Mob: +919*********, +91-930*******, India
Email: **********@*****.***
1. Recently I employed with Adyard Abu Dhabi LLC as a “work shop supervisor” w/e 20/10/2015 to 10/04/2016 for piping Fabrication work.
2. Employer : Descon Engineering (SGD Project)
Client : Al-Hossan Gas, Abudhabi
Period : 30-Apr-2012 to 25/04/2014.
Designation : “Supervisor / Ass. Engineer”
Activities: I have been actively involved to Fabrication, Erection, and Installation of heavy structure, pipe supports, piping spools, vessel platform, column structure, and static equipment platform. I also responsible for a safe work procedure as a permit applicant.
3. Employer : Maritime Industrial Services co.ltd.Inc.
Client : Dugas, Margum, Tecknip, Petro face,QP/Woqood Period : 15-Sep-2004 to12-Mar-2012 Project : Fabrication Yard at Sarjah and outside project
Designation : “General Foreman”
Activities: I have been actively involved to Fabrication, Erection, Installation of Export,Import pipeline, Skids, Module, Structural Road crossing bridge, valve operating platform, Storage tank, Static Equipments, Hydro test, Pneumatic test, flushing and Commissioning activities and Shut down activities, followed by various safety procedure and productivity.
4. Employer : National Petroleum Construction Co. U.A.E
Client : Shell, Total, Adnoc, Technip, Aramco
Period : 10-09-2003 to 01-09-2004
Project : "Mosafah" Yard and work shop.
Designation : "Foreman”
Nature of job a) Fabrication and Testing of pressure vessels.
b) Fabrication and installation of heavy structure
of Deck and Platform accessories.
c) Deck's process piping and hydro testing. d) Fabrication of Boat-landing platform & jackets.
e) Barge maintenance activity.
5. Employer : Naft Sazeh Qeshm, (IRAN)
Project : Soroosh & Nowrooz Project
Period : 03-12-2002 to 09-09-2003
Designation : "Foreman”
Nature of work : same as NPCC
6. Employer : M.S. Al Suwaidi Est. (K.S.A)
Client : Flour Daniel, ABB, Cheyoda, Dalim
Designation : "Piping Foreman"
Period : 17-11-1996 to 03-10-2000.
Project 1)SCECO Power plant, Rabigh, K.S.A Nature of job a) Extension of crude oil pump house, installation of related piping on pedestal and pipe rack along
With Live lines in operation area. b) Tie-in connection for all types of utility lines in existing plant area as steam line, compress
Project 2)PTA/Aromatics Project (IBN Rushd) K.S.A
Nature of job a) Installation of static equipments with platforms. b) Utility, fire fighting and process piping. c) Pneumatic, hydro testing and flushing activities. Project 3)Yanpet Petrochem Existing & new plant, K.S.A
Nature of job a) Ins. of Boiler, Flair line and Utility pipe lines b) Water flushing, Air blowing, Steam blowing,
Arrangement of chemical cleaning.
C) Punch listing and reinstatement activities.
Project 4)Petrochemya (Jubail Industrial city), K.S.A
Nature of job a) Shutdown work preparation, dismantling,
Maintenance, reinstallation of connecting piping at
Olphin, Ethylene, Butane, V.C.M Furnace and
Propylene site.
b) Additional operating platform
c) Overhauling of Heat Exchangers, Dismantling and reinstallation the same
Professional Experience in Indian Industries
1. Employer : M/S Baba Construction,
Project : N.T.P.C Supper Thermal Power Plant, Kahalgaon.
Period : 06-07-1993 to 17-08-1995
Designation : "M/W Foreman"
Nature of job : a) Installation and Alignment of Ball mill, FD fans,
I D fans, Coal crusher and rotating equipment.
b) Installation and testing/commissioning of Dust-
Catcher system.
c) Alignment of conveyor belts tell- pulleys and drive
Pulleys with drive gear box.
2. Employer : M/S Vishwakarma Fabricator
Project : Tata Iron and Steel Co. Jamshedpur
Client : TRF, BHEL, Rex Roth, Siemens, Mannesmann.
Period : 21-01-1988 to 20-10-1992
Designation : "Supervisor"
Nature of job a) Installation of Static equipments, connecting all the
Facilities to LD Shop reheating Furnace.
b) Assembly/installation of Gas holders, connecting
all nozzles along with 60" valves to 'G' Blast furnace.
c) Hydraulic piping and related equipment installation
of Stamp charging machine at Coke oven.
d) Installation, Alignment, Testing, commissioning
of Roller table and housing stand of Strip mill. e) Installation, testing, commissioning activities of
“ 60 MW” Boilers and Turbine.
3. Employer : Kinetic Modern Construction Services
Project : National Fertilizer Ltd. Guna
Client : Halder Topsoc Denmark, Davy Ashmore
Period : 01-12-1985 to 30-11-1987
Designation : "Supervisor"
Nature of job a) Fabrication and erection of low/medium and high
Pressure steam lines.
b) Ammonia process pipe line connected to vessels.
c) Fabrication and Installation of pipe rack structure,
Landing platform of ammonia tower.
d) Statics equipment, column supporting and
e) NDT activities as recorder of X-RAY, UT, PT,
Preheating, Stress relieving, Hardness test.
4. Employer : Kinetic Modern Construction Services
Project : Ropar thermal power plant, Punjab
Period : 01-09-1984 to 15-10-1985
Designation : "Foreman"
Nature of job : same as above
5. Employer : M/S Davy Ashmore Co India Ltd.
Project : Bhilai Steel (Oxygen plant, Oil Sheller, plate mill)
Period : 12-07-1982 to 15-06-1984
Designation : "Trainee Supervisor"
Nature of job a) Static equipment installation, Testing, commission.
b) Fabrication and Assembly activities of Oil shellers,
Hydraulic piping connections cross through tunnels.
c) Roller table assembly, Alignment, testing and
Commissioning activities of plate rolling mill.
I T Command
** Having excellent command in MS Office.
Date Abdul Mannan Ansari