|
Resume alert |
Resumes 11 - 20 of 71 |
Brockton, MA
... General Electric Company, GE POWER, Houston, Texas, USA Jul 2014 - Mar 2017 Mechanical Engineer • Project lead Provided technical support, development, Construction, Inspection of gas turbine package across the world. (TM2500, LM2500, LM6000, LMS100 ...
- 2021 Jun 20
Boston, MA
... Inplant Trainee Mumbai, India Mahagenco, GTPS, Uran June2018-Jul2018 Analyzed the actual working of a gas turbine power plant. Gained a lot of knowledge about the functioning of the gas turbine and steam turbine and got to know about various ...
- 2021 Mar 06
Brighton, MA
... EXPERIENCE National Renewable Energy Laboratory Oct 2019 - Aug 2020 Data Science Intern Denver, Colorado Extracted 10+ features using wind turbine gearbox design and physics-based models that reduced false alarms by 50% and improved F1 score by 12%; ...
- 2020 Dec 17
Boston, MA
... Engineering Intern Uran Gas Turbine Power Plant, Maharashtra, India Dec 16-Feb 17 • Learned about the functioning of a gas turbine power plant as well as waste heat treatment system. • Analysed logistic process with clients and contribution of the ...
- 2020 Apr 30
Cambridge, MA
... College of Engineering Jul 2011- May 2012 “Optimization of Aerofoil for vertical axis wind turbine” Designed manufactured and tested Compact Vertical Axis Wind Turbine. Designed using SolidWorks followed by Simulation on CFD tools; ANSYS Fluent, ...
- 2020 Apr 14
Waltham, MA
... Also responsible for expediting transmission line tower steel, turbine inlet valves, switchyard components, transformers, etc. Total value $38,000,000. Staff - 1. Sam Hall/Poles-Piling, Thornton, NH (Oct 1987-May 1990) Operations Chief - Pole ...
- 2020 Mar 26
Providence, RI
... Power House of 26x50x192 meters, with 8 sets of turbine-generator, with 1500 MW total. Included the construction inspection of 6 camps of 60,000 m2, with bedrooms, offices, restaurants, hospitals, etc. Construction cost is USD $ 2000 000,000. - ...
- 2019 May 31
Boston, MA
... a 130MW wind farm with 59 Wind Turbine Generators (WTG) • Conestogo Wind Farm Project: Engineering Services for 34.5kV underground collector system, 34.5-44kV collector substation, and 44kV gen-tie line to support a 23MW wind farm with 10 WTGs. ...
- 2019 Apr 18
Framingham, MA
... Also, responsible for piping layout and support design including a pipe bridge structure for mainsteam line from HRSG to Back Pressure Steam Turbine −Evaluated pressurizer vent header piping at the Salem 1 & 2 for various transients’ loads and other ...
- 2019 Apr 03
Attleboro, MA
... Amherst, Amherst, Massachusetts Research Associate 9/3/2016-5/10/2017 • Working on independent research involving super hydrophobic surface coatings, placement and orientation, for turbine blades under the supervision of Jonathan Rothstein, Ph.D. ...
- 2018 Dec 04