|
Resume alert |
Resumes 11 - 20 of 185 |
Mumbai, Maharashtra, India
... Gas Turbine, OFF-Base Enclosure Structure Design- Ras Laffan Refinery Qatar Gas Turbine, OFF-Base Enclosure Structure Design- Bonny Island, Nigeria Client – Sistemi Industrially, Italy These steel Structures designed to support Acoustic enclosure ...
- 2023 Jun 19
Nandiwali Tarf Ambarnath, Maharashtra, India
... t/hr Babcock & Wilcox WT Boiler 22 t/hr HRSG waste Heat Recovery 30 t/hr Wal Chand WT Boiler 4.5 mw Turbo mech Gas Turbines Turbine driven Cooling Tower Turbine driven ID/FD Blowers DM Plant / Water Softener Fire Water system Ammonia vaporizer Seal ...
- 2023 Apr 27
Mumbai, Maharashtra, India
... Duration- Sep 2016 - May 2017 Roles and responsibilities - o Working of pipe line erection, Fabrication, Turbine oil flushing and maintenance on site. o Making DPR, Man power chandelling, Project chandelling, Execution of daily work analysis. o ...
- 2023 Feb 28
Mumbai, Maharashtra, India
... A wind turbine driven eddy current heater for domestic heating. Manav Rachna International Institute of Research and Studies, New Delhi. A working model of low cost self-starting helical wind turbine that generates electricity with low winds.
- 2022 Dec 15
Mumbai, Maharashtra, India
... June 2016– DEC 2016 Previous Employer Company name : Beyond Logics Company profile : Dealing in SAP Training and under taking Projects Position Held : SAP PS Implementer and Support Project Undertaken During Training : 1) Turbine Project Project ...
- 2022 Dec 13
Mumbai, Maharashtra, India
... Induction generator (6.5 MW) with gas expansion turbine prime mover. Indoor substation 11KV, 33KV (33, 11 & 6.6KV VCB, Numerical Relay co-ordination). Oil immerse distribution transformers up to 50MVA, 33KV/11.5KV and upto1.6 MVA, 6000/415 V. HT & ...
- 2022 Dec 07
Thane, Maharashtra, India
... Erection & Alignment of Rotary Equipment especially Pumps, Compressors, Turbine, and Air fin Cooler etc. Erection & Alignment of Package Unit, Like Refrigeration Unit, Vent Gas Treatment system, Boiler Package, & CCR Unit etc. Planning & Preparation ...
- 2022 Nov 28
Kandiwali West, Maharashtra, India
... -MPT Inspection if complete Turbine Set at Tata Station and Tata Electric Co., Bombay. -Ultrasonic, MPT and LPT Inspection on various typical components of various Engineering companies. Typical components: Crank Shaft, Crank Cases, Crane Brooms and ...
- 2022 Oct 16
Mumbai, Maharashtra, India
... Captive Power Plant Learned about Thermal Power Plant layout and working of different main parts of plant like water treatment plant, coal storage and handling plant, ash storage and handling plant, steam boiler, turbine and various other objects. ...
- 2022 Aug 23
Panvel, Maharashtra, India
... Rationalization of UPS for 160-160 KVA Gas turbine 5 MW tow set Also working on BMS System(L& T) controller, chiller 10ton capacity, cooling tower,AHU& all equipement. Also working on Hydraulic system, Pneumatic system, TFH system Also working on ...
- 2022 Jan 31