Having 18 years of Experience in a wide spectrum of Mechanical Construction related to the Project execution of Petrochemicals, Refineries, Gas plant, Power Plant And Steel Plants Etc.
Worked in various Projects in green and brown field for Supervision of fabrication Erection & commissioning of Piping. Erection & Alignment of Static and Rotating Equipment.
Fabrication and Erection of structural work.
Currently working as a Construction Supervisor Mechanical with Adyard Abu Dhabi LLC
Date of Birth : 15th March 1978
Nationality : Indian
Marital Status : Married
Passport Details
Passport No. : S 4676840
Date of issue : 07/05/2018
Place of issue : Abu Dhabi
Date of Expiry : 06/05/2028
Educational Qualification
D.M.E ( Dip. Mech. Eng.) 1998 Attested by HRD Govt. of India, UAE and Saudi
Additional Qualification
Stcw95 (Safety Course)
T Boseit / Basic H2S Training for Offshore / AGT (Authorised Gas Tester )
WMS Adnoc
Auto cad
MS office
Employment profile
Employer : M/S Adyard Abu Dhabi LLC
Designation : Mechanical Construction Supervisor
Client : ADOC Japan Mubarraz Island Abu Dhabi
Period : 24/01/2022 to Till date
Working as a Mechanical Construction Supervisor for EPC project Execution Stage for MUB Black Start Department Diesel Engine Generators for ADOC JAPAN Mubarraz Island
Employment profile
Employer : M/S Target Engineering and Construction Co.
Designation : Mechanical Construction Supervisor
Client : ADNOC LNG Das Island
Period : 15/05/2019 to 23/01/2022
Nature of duties
Worked as a Construction Supervisor Mechanical .Handling Fabrication & Erection of CS,LTCS, SS, AS,GI piping with various schedules up to 50 mm thick for AG and UG Plant piping. Equipment piping, Rack piping and Utility as per drawing and specification.
Preparing and monitoring of fabrication Sequence as per codes and standards during fabrication work is performed in accordance with approved construction procedure, specification. Attending daily meeting (production / safety)
Prepare the one week look ahead schedule that needs to be submitted to the planning.
Participating and preparing Task Risk Assessment for the given job to categorize and measure the precaution for the Task carry out job safely and without LTI.
Supervise and coordinate with foreman, Lead men to achieve maximum Productivity. Preparing Technical quarries & As built Drawing as required. Preparing the punch list of test pack and coordinating with client in clearing The test pack & mechanical completion by attending the punch point’s priority. Conducting Hydro test as per test pack, Supervise day by day activities & monitoring the Employees are working with safety and quality.
Employment profile
Employer : M/S Euro Mechanical and Electrical Cont. CO.LLC
Designation : Mechanical Foreman
Client : ADNOC LNG Das Island
Period : 12/11/2013 to 15/05/2019 ( Rotational Job )
Nature of duties
Preparation and arrangement of Tools tackles,Materials for site.
Making of Isometric Drawing on the bases of actual field measurement.
Assistance for preparation of Method statement, TRA (task Risk Assessment)
Supervision for fabrication of piping spools and Piping supports.
Supervision for cold work, hot work and naked flame work in brown field Piping & dismantling of old piping, supports structures etc.
Erection of Piping and Supports, Supervise & coordinate with Supervisor / Engineer, to achieve maximum Productivity. Preparing Technical quarries & as built
Drawing as required. Attending weekly meeting with client.
Responsible for Safety and quality jobs.
Employment profile
Employer : M/S STS (Specialized Technical Services LLC)
Designation : Mech. Supervisor.
Project handle : Wet Gas Scrubber
Client : Alstom
Owner : ORPIC (Oman Refineries & Petrochemical Industries Co.
Period : 15/02/2013 to 14/06/2013. (Shutdown)
Nature of duties
Supervision for the dismantling of old WGS (wet Gas Scrubber) height up to 85 meter.
Installation of new WGS Including shell, stack, duct & Platforms.
Installation of internal works including Demister, Trays, packing, & Distribution header.
Installation of stack, platform & new modifying duct.
Installation of associated Piping and Supports.
Erection of 30” GRP sea water supply & 52” drain line to the scrubber.
Commissioning of WGS.
Employment profile
Employer : M/S NESMA & Partner Contracting Co. Ltd.
Designation : Piping Supervisor.
Project handled : SATROP (Saudi Aramco total Refinery) project, DAP project
Client : CPSA (Chiyoda Petrostar & Samsung Engg Const.Co.) Period : 03/10/2009 to 18/05/2012.
Nature of duties
Worked as a Piping Supervisor for the construction Coker (Satorp) project .Handling Fabrication & Erection of CS,LTCS, SS, AS,GI piping with various schedules up to 50 mm thick for AG and UG Plant piping. Equipment piping, Rack piping and Utility as per drawing and specification. Supervise & coordinate with foreman, Lead men to achieve maximum Productivity. Preparing Technical quarries & As built Drawing as required. Preparing the punch list of test pack and coordinating with client in clearing The test pack & mechanical completion by attending the punch point’s priority. Supervise day by day activities & monitoring the Employees are working with safety and quality.
Employment profile
Employer : M/S Kharafi National Kuwait.
Designation : Piping Supervisor.
Project handled : KPPC Aromatic Complex Project Kuwait.
Client : Technimont Italy.
Owner : KPPC.
Period : 27/04/2008 to 17/11/ 2008. (Short term project)
Nature of duties
Worked as a Piping Supervisor for the construction of Aromatic Complex project.
Handled Fabrication & Erection of CS, SS, AS, GI piping with various schedules for AG, Plant piping, Rack piping and utility piping as per drawing and specification. Erection & Alignment of various type of piping supports.
Preparing the punch list of test pack and coordinating with client in clearing the test pack & mechanical completion by attending the punch point’s priority.
Employment profile
Employer : M/S Lahoud Engg. Co.Ltd.
Designation : Mechanical Supervisor
Project handled : Ras laffan Olefins project RLIC Qatar.
Client : Technip France
Owner : RLOC. ( Ras laffan Olefin Co.)
Period : 03/06/2007 to 07/ 02/2008
Nature of duties
Worked as a Mechanical Supervisor for the construction of furnaces (9 nos.)
Execute Assembly & Erection of structural works, Panels, convection boxes, Radiant coils, Transfer line exchangers & Platforms & Pipe rack Structure
Erection & Alignment FD fan, Stack & steam drum.
Employment profile
Employer : M/s Nasser s Al Hajri corporation.
Designation : Equipment Supervisor (Static & Rotating).
Project handled : Propane Dehydrogenation Unit, Yanbu, KSA.
Client : M/S Lurgy Germany
Owner : National Petrochemical Industrial Co.
Period : From 16.04.2006 to 20.01.07.
Nature of duties
Worked as a Equipment Erection Supervisor for the construction of Propane Dehydrogenation project. Execute Erection & Alignment of Static Equipment especially Vessels, Column, Reactors, Heat Exchangers, & Tanks etc. Erection & Alignment of Rotary Equipment especially Pumps, Compressors, Turbine, and Air fin Cooler etc.
Erection & Alignment of Package Unit, Like Refrigeration Unit, Vent Gas Treatment system, Boiler Package, & CCR Unit etc. Planning & Preparation of lifting Scheme for Heavy lifting Equipment weight up to 520 tons.
Preparation for Rigging Plan, Method Statement and TRA for Heavy lift.
Employment profile
Employer : M/s Nasser s Al Hajri corporation.
Project handled. : M/s Gulf Farabi n-Paraffin & LAB project, Jubail, KSA.
: Butane Di-ol Facility Project, Jubail KSA
Owner : Gulf Farabi Petrochemical Co.
: Saudi International Petrochemical Co.
Client : M/s. SNC lavalin Europe BV.
: M/s Aker Kavaerner Natherland
Designation : Piping Supervisor.
Period : From 20.01.2005 to 12.04.06.
Nature of duties
Worked as a Piping Supervisor for the construction of Normal Paraffin & Linear alkyl Benzene project and construction of Butane Di-ol facility project. Handled Fabrication & Erection of CS, SS, AS, GI piping with various schedules for UG and AG, Plant piping, Rack piping and utility piping as per drawing and specification. Handled steam tracing work for piping / Equipment, Installation of steam manifold, Lead/ Tail line for circuits, Hydro/Pneumatic test for each circuits etc. Preparation of technical quarries, as built drawing as required .
Employment profile
Employer : Pacific Consultant & Engineers
Owner : Garg Distilleries Pvt. Ltd., Asian Paints, United Phosphorus etc.
Designation : Site Engineer
Period : 01.04.2003 to 15.01.2005.
Nature of duties
Engaged in Turnkey base project for the construction Ethanol Dehydration Plant.
Executed Site visit / Survey, drafting, estimation and costing and inspection activities.
Executed Fabrication & Erection of Piping of various schedules & Std.
Erection & alignment of all type of static Equipment.
Erection & alignment of Rotating Equipment.
Employment profile
Employer : M/s Srikesh Engg.
Owner : BPCL, Golden Chemicals, Zenith Group etc.
Designation : Junior Engineer.
Period : 01.07.1998 to 05.03.2001.
Nature of duties
Worked for Manufacturing of Conveyor system, Specially Chain Drive, Belt Drive, Screw Conveyor & Bucket Elevator. Engaged in site visit, drafting,materials purchasing and quality control activities related to the above job.
Engaged in Supervision of Fabrication, erection & commissioning of Conveyor system.
Declaration