|
Resume alert |
Resumes 11 - 16 of 16 |
Vizianagaram, Andhra Pradesh, India
... Internship in Damodara Thermal Power Plant (APGENCO), Nellore. A project work on Energy Tariff Analysis in B. Tech (2017-2018). Apprenticeship (2018-2019) in Bharat Dynamics Ltd, Visakhapatnam. Worked in Quality Control Department. Involved in ...
- 2019 Oct 21
AP, 535270, India
... ABOUT STEEL EXCHANGE INDIA LTD(POWER DIVISION): • 2 x 30 MW Steam Turbo Generators, Make: SIEMENS. • 1 x 210 TPH CFBC Boiler, Make: Thermax. • 2x36 TPH WHRB for 2x350 TPD Kilns, Make: Thermal System. • 2 x 12 m /Hr R.O Plant, Make: Ion Exchange. • ...
- 2017 Nov 12
Vizianagaram, AP, India
... Technical Experience: Industrial training: Industrial training for a period of six months in “LOCOMOTIVE AND WAGON REPAIR SHOP” and “THERMAL POWER PLANT” departments at “VISAKHAPATNAM STEEL PLANT” in Vishakhapatnam. Internships:- Internship for a ...
- 2017 Aug 31
Vizianagaram, AP, 535001, India
... NBPPL is executing BoP of 3 Gas based power plants located at NE Region and EPC of 500MW Unchahar Project of NTPC Limited. NBPPL is also setting up a power equipment manufacturing plant at Mannavaram, Andhra Pradesh and has started manufacturing CHP ...
- 2016 Sep 03
Andra, AP, India
... Professional Synopsis Dynamic professional with graduation in Mechanical Engineering and certified in operation & maintenance of power plant, automation (PLC, SCADA, HMI), instrumentation and project management. Excellent interpersonal skills and ...
- 2016 Mar 22
Vizianagaram, AP, India
... Completed SSLC from Arya Bhrathi high school, omalloor in the year 2008 with a percentage of 64% FINAL PROJECT DETAILS Title : Power saving technology observing solar power plant Team Size : 5 Description : The objective of this project is to save ...
- 2013 Oct 17