Post Job Free

Power Plant resumes in Madhya Pradesh, India

Sign in
Search for: Jobs   Resumes


Resume alert Resumes 51 - 60 of 172

Power Plant Mechanical

Indore, MP, India
... Second year Completed Dissertation topic Energy and exergy analysis and exergy economics analysis of coal based thermal power plant Bachelor of Engineering Branch Mechanical Completed on Dec-2009 College Institute of engineering and technology Devi ... - 2017 Oct 17

Mechanical Engineer Plant

Bhopal, MP, India
... WORK EXPERIENCE: Total Work Experience : 16 years PRESENT WORKING Currently Working as a Boiler Operation Shift Incharge In Aarti Industries Ltd, Gujrat ROLLES & RESPONSIBILITY a) Working as a Shift Engineer in Captive Power Plant Looking Boiler, ... - 2017 Oct 17

Power Plant Water Treatment

Bhopal, MP, India
... M/s Vardhman Yarns (Power Division) A Unit of Vardhman Textiles Limited Satlapur Mandideep Raisen Bhopal(M.P.) 30 MW Coal Based Thermal Power Position: Assist Officer Power plant WTP & COAL lab Period : 13 Oct. 2007 to till date 2. M/s, Udaipur ... - 2017 Oct 15

Electrical Engineer Project

MP, India
... Additional Qualification Advance Diploma in Power & Automation for the period of 1 year. Areas of Interest: 3 Phase Transformer. Vocational Training: Bhilai Steel Plant, Bhilai (C.G.). Chhattisgarh State Power Distribution Company Ltd.(CSPDCL) ... - 2017 Oct 11

Power plant operation and maintenance

MP, 462022, India
... IN-PLANT TRAINING: Undergone 2 week rotation on job training for “SCHEME TRACING” at NTPC BADARPUR. Undergone 2 week rotation on job training for “OPERATION” at NTPC BADARPUR. Undergone 2 week rotation on job training at NTPC FARIDABAD GAS POWER ... - 2017 Oct 04

Project Engineer

MP, India
... from Danieli Morgardshmmar, Italy acknowledged global leader in manufacturing of rolling mill and steel plant equipment. ... surface, like, water, sand, mountains, means any surface MINOR PROJECT: Title: Savonius Wind Turbine for Power Generation. ... - 2017 Sep 01

Qa/Qc Mechanical engineer

Baroda, MP, 476339, India
... PROFICIENCY: STEEL FABRICATION & ERECTION, OIL & GAS PIPE LINE (AG & UG) & SUPPORTING STRUCTURE, POWER PLANT, CONSTRUCTION, MAINTENANCE & OPERATION, BLASTING & PAINTING, WRAPPING COATING ETC. Qualification < Bachelor’s Degree in Mechanical Engineer ... - 2017 Aug 14

Project Assistant

Indore, MP, India
... & Materials Management Division : Power Generation Location : Raigarh (C.G) Duration : 06th November’ 2014 – Till Date. ... In-House Work at NTPC Lara at Raigarh, C.G Project: Coal Handling Plant (CHP), 2 X 800 MW, TATA PROJECTS LIMITED (TPL) Scope ... - 2017 Jul 22

Product Development Engineer

MP, India
... • Designing (using Solid works, Auto – CAD) of pattern for cement plant machinery part involving new mill design, checking ... Achievements: • Design and Development various Parts of Cement Plants and Power Plants • Development of casting of range 0.5 ... - 2017 Jul 21

Sales Quality

Indore, MP, India
... •Coordinated with manager, materials coordinator, testing coordinator and plant shipping dock to ensure production order & ... Able to balance the line with minimum man power for maximum production. Maintaining assign machine in good working condition ... - 2017 Jul 13
Previous 3 4 5 6 7 8 9 Next