Distance: |
Resume alert |
Resumes 271 - 280 of 282 |
Lahore, Punjab, Pakistan
... April 2010–March 2012 AEPL GE International,Inc Pakistan ehs engineer HSE management on construction & installation of 747 MW Guddu Power Plant HSE management on construction & installation of 60 MW Kalerkahar Power Plant April 2010 March 12 Value ...
- 2015 Mar 17
Lahore, Punjab, Pakistan
... - Main Underground Transformer Wiring for the Metallizer plant. - Commissioning Engineers for the Machine Test Running and Problem Solving. - Installed the electronic gauge sensor at different location by following the wire -map. = Maintenance of ...
- 2014 Dec 02
Lahore, Punjab, Pakistan
... Industrial Visits Millet factory : Visit assembling plant of tractors. DG Cement : Visit the control units and manufacturing Plants. Communication and leadership Worked as President of Mechatronics club society. (Sep 2013-June 2014) Delivered a ...
- 2014 Nov 16
Lahore, Punjab, Pakistan
... Ltd.(Ethanol Production Plant) Designation: Asst. Manager Description: Premier Industrial Chemical manufacturing is the largest ethanol production plant of Pakistan. It produces Superfine grade @ 135 M.Tons per day of 96.2 strength Industrial grade ...
- 2014 Sep 25
Lahore, Punjab, Pakistan
... = 88 PROJECTS: Compatibilization of HDPE & PET in the presence of Maleic Anhydride Manufacturing of Polychloroprene Rubber (Plant Design) Reactor Design Project on House Construction Business Small Business Project (Friends Palace) Project Proposal ...
- 2014 Aug 30
Lahore, Punjab, Pakistan
... Plant, assist and prepare special studies, process control and automati on. Supervise and control and recommend technical materials, electri cal and control equipments suppliers. Identify and record an y electr ical and instrumentation service ...
- 2014 Aug 20
Lahore, Punjab, Pakistan
... Study of BIOGASS plant at DARSON industries The main task was to find out the operational and design defects in the current biogass plant and improve the pressure loss so that steam presses can work properly. Our team designed some modifications in ...
- 2014 Jul 26
Lahore, Punjab, Pakistan
... especially in an industry where my areas of expertise can come handy, extremely confident of lift control-safe operating skills, can operate almost all type of Cranes using in Oil field Construction Industry and Rig, having experience in Live Plant. ...
- 2014 Jul 08
Lahore, Punjab, Pakistan
... Population of working and design data of piping & equipments from P&IDs, GA Drawings, PFDs & inspection history in VAIL-Plant template. Qualification: B.Sc Mechanical Engineering (University of Engineering and Technology Lahore) Pakistan Engineering ...
- 2014 Jun 12
Lahore, Punjab, Pakistan
... LPG Storage tank and pipes Inspection as per API 510 standard LPG plant Pre Commissioning Inspection as per NFPA 58 standard CML interpretation Witness of PT,MT Inspection reporting to client Accidental inspection at request of OGRA (Oil & Gas ...
- 2014 Apr 27