mutti ullah yousaf
Education
**** ****** ****** ********** **
higher
M.Sc in Oil and Gas Engineering [Ist
educATION
Division]
**** ********** ******* ** ************ Studies UK
Post Graduate Diploma in Business Management [Ist
basic education Division]
2000–04 University of Engineering & Technology Lahore,
EHS Pakistan
B.Sc Chemical Engineering [Ist
Division]
2013 IGC UK
NEBOSH
2012 UK
OHSHAS
Level II Emergency First Aid Training at workplace UK
SKILLS & trainings
Engineering Project MAnagement
CPD
Basic EHS course
Work at height
Fire safety & Firefighting
Incident investigation
Confined Space Training Course
Safe system of Work
Permit to work system
Mechanical and Manual Handling Training
Electrical Safety
Rigging Activites
Chemical safety & Handling
Emergency Response Preparedness
languages
English, Punjabi & Urdu
IT SKILLS Excellent computer/internet skills. Confident use of Windows OS (inc. Windows
7), MS Outlook, Internet Explorer, Netscape, and most word processing and
1
database software.
Adobe, AutoCAD, MS Office (All up to v.2007), MS project, Wellcat etc.
Software/
Hardware
Well versed ISO 9001, 14001 or 18001 standards with field experience in EHS,
planning & QAQC; i have managed & supervised various Energy Sector projects
EHS
through which I developed a confident, structured, planned approach to meeting
project EHS objectives & deadlines. I have also conducted training sessions for
supervisors and technicains.
With hands on field experience in EHS policy design and implementation; i have
managed & supervised many GE projects including waste management and
disposal through which I developed a confident, structured, planned approach to
meeting compliance objectives & local regulatioins guidelines.
WASTE
Management &
Disposal
Experience
AEPL GE International,Inc Pakistan
EHS Manager
(2012 to till date)
Working as Corporate EHS Manager responsible for the design, implementation,
communication and coordination of all environmental, health, and safety
programs for the company. This position will develop and provide technical and
administrative direction on all EHS decisions, which bear critical importance to
overall company objectives, operations, and profitability. Following are detailed
responsibilities including:
Waste management and disposal to meet GE compliance and the local regulations
Responsible for the design, implementation and control of site EHS objective,
policies and guidelines.
Implementation of GE One GE Safety Outage plan especially designed for
critical activities during outage
Ensure that all applicable EHS procedures, policies and plans and implemented
and followed at all levels.
Oversee the site safety policy and ensure that all of the safety events, violations
and environmental impacts are recorded and addressed in accordance to the
respective policies.
Prepare and manage risk assesments, JSA, lift plans, permits and hazard hunts
Coordinate with client and management to achieve desired safety srandars
Planning and conducting site inspection, audits and surveys
Conduct site walkdowns, preparea & submit reports to client on daily, weekly and
2
monthly basis.
Implement ISO 14001, 18001, 9001.
Investigation of accident, incidence, near miss and LTA and suggest remedial
measures to avoid its reoccurrence.
Conduct and supervise EHS trainings.
Lead emergency response team.
And;
Prepare, manage and supervise all documentations related to Project pre
mobilization phase and Project mobilization phase activities such as initial site
inspection, emergency contacts, equipment specific LOTO (lockout tagout)
procedures, EHS orientation for employees and contractors, job safety analysis &
risk assessments, safety meetings, hours tracking, LOTO clearance forms, weekly
inspections, daily toolbox talks, reporting of accident/incident, injury, spill or
other EHS event; safety correction action, Equipment inspections (annual crane
inspection, daily crane inspection, overhead crane daily inspection, overhead
crane monthly inspection, aerial platform inspection, come along and chain fall
monthly inspection, fall protection equipment monthly inspection, daily forklift
inspections, monthly rigging inspection); lift permits, hot work permits, confined
space permits, audits and regulatory inspections.
Project de mobilization phase activities such as final site & TNP (tools & plants)
inspections, housekeeping, commissioning, start up, performance testing and site
handing over to customer. Daily, weekly and monthly walkdowns, reporting &
monitoring.
EHS Projects Completed
Following are some important projects where I performed duties as EHS
lead & peoject lead as well with GE. Apart from office working on all
company related multi projects locally & internationally following are some
completed projects list;
Uch power major Inspection 2012
1.
Sapphire Major inspection 2013
2.
Saif power major inspection 2013
3.
Bhikki Major Inspection Package 5 Up gradation 2013
4.
Halmore forced major inspection 2013
5.
Uch power Combustion inspection 2013
6.
HGPI + Package 4 upgradation Balloki 2013
7.
3
HGPI + Package 4 upgradation SAIF Dec 2013
8.
HGPI + Package 5 upgradation Sapphire feb 2014
9.
Guddu power major Inspection March 2014
10.
Dakhni gas field major inspection Aug 2014
11.
Uch power Combustion Inspection+Forced Outage Oct 2014..
12.
April 2010–March 2012 AEPL GE International,Inc Pakistan
ehs
engineer
HSE management on construction & installation of 747 MW Guddu Power
Plant
HSE management on construction & installation of 60 MW Kalerkahar
Power Plant
April 2010 March 12 Value of project US $ 590 million.
Project consist of 2 9FA GE gas turbine+ 1 steam turbine + 2 HRSG
Piping works, civil construction
Pre cast beam production and erection at site
Three station building with structural steel framing
Electrical/Power/Traction system works Electro mechanical works
HSE Management role, rigging study of heavy equipments..
Preparation of HSE Plan in compliance with EHS regulations
Carry out audit/inspection of all sub contractors regularly
Training of personnel, Carry out accident investigations
Preparation/Review of Risk Assessments and Method Statements
March 2004 – Sep 2006 SPEC USA Pakistan
technical
Prepare technical proposal and planning of all operations related to fabrication &
engineer
purchase,
references
AVAILABLE ON REQUEST
4
08 east scheme no 2 sahiwal
Phone +92-300-****-*** • e mail *********@*****.*** •