Chandigarh, CH, India
... • Assessing the needs of equipment replacements, spare parts • Assessment of the required tools for the maintenance of the equipment • Responsible for the plant and equipment maintenance and replacement of worn-out parts. • Supervises and ...
- 2015 May 23
Chandigarh, CH, India
... • Taking care for Visa Processing for Visitors and Plant Employee for their Business Trip. Correspondence and Communication • Played a vital role in assisting globally all corporate secretaries to make a smooth transition of data and other important ...
- 2015 May 13
Chandigarh, CH, India
... Process Engineer Plant: 500 KTA Purified Terephthalic Acid (PTA) Technology: Imperial Chemical Industries (ICI) [now owned by Du Pont]. Description: This plant comprises conversion of Paraxylene to Terephthalic Acid in which Paraxylene react with ...
- 2015 Apr 17
Chandigarh, CH, India
... e) Attending any faults that occur during operation of plant. f) Maintaining necessary spares in store for attending failures of equipment’s. g) Preparing maintenance schedule documents and submitting it to client for claiming of bills. h) o ...
- 2015 Mar 29
Chandigarh, CH, India
... WORK EXPERIENCE Experience in Production, Power Plant operation and maintenance . Presently working in Mechanical Maintenance Team (Boiler Maintenance 660 MW Super Critical Units & 330 MW Sub Critical) in ADANI POWER LIMITED, 4620 MW MUNDRA THERMAL ...
- 2015 Mar 06
Chandigarh, CH, India
... AREAS OF EXPERITES : PRODUCTON IN CONTINUOUS PROCESSING PLANT (a) Proper analysis and review of machine wise production, production losses,product details. (b) Process loss & reprocess,c.s, quality wise packing, variable cost and profitability. (c) ...
- 2015 Feb 24
Chandigarh, CH, India
... To ensure plant up time as per agreed norm. To achieve Maintenance KPM of Safety, Quality, Line Efficiency, OEE, and Cost. Implementation of Quality systems e.g. ISO 9001, HACCP, 5S, etc. Capex execution and to under take development projects. To ...
- 2015 Feb 24
Chandigarh, CH, India
... Ltd.,Vadodara, Gujarat • Project Title : Installation and commissioning of 1.5MW solar Power Plant. • Duration : Six Months (JAN 2013- JULY 2013) • PROJECTS REPORT Ball sorting on the basis of color sensor. Water level indicator with alarm. IT ...
- 2015 Feb 14
Chandigarh, CH, India
... Training 45Days Industrial training in GHTP thermal plant Lehra Mhobbat I want to build a caree in Electrical field Education Three Years Diploma in Electrical Engineering. Course Board/University School/College Summary of Year of passing ...
- 2015 Feb 03
Chandigarh, CH, India
... at CBL, Plant kurali JOB RESPONSIBILITES To Qualify and re-qualify to new and existing welders To make new WPS, PQR & qualification and re-qualification Overall shop monitoring & incharge of coil section. On job Training to welders ACADMIC TRAININGS ...
- 2015 Jan 31