|
Resume alert |
Resumes 21 - 30 of 44 |
Lansing, MI
... • Proficient using Gages: micrometers, calipers and hand tools + Gage R&R • ISO/TS basic understanding + some internal auditing • Basic understanding of APQP / PPAP ACCOMPLISHMENTS • Use clear, concise communication skills in conjunction with ...
- 2015 Jun 12
St. Johns, MI, 48879
... Quality Tools: 8D, PPAP, PFMEA, DOE, Hypothesis Testing, MSA, Gage R&R, APQP, SPC, DMAIC, DFSS . Lean Production Skills: Kaizen events, Total Productive Maintenance (TPM), Toyota Production System (TPS), Standard Work, 5S, One piece flow, ...
- 2014 Dec 05
East Lansing, MI
... AS9100 Heat Treat Testing & Inspection Diploma ISO 17025 APQP, PPAP Solid Works Director Level Positions Professional Laboratory Development Accomplishments Developed into showpiece Created a competitive Applications Engineering Function Received ...
- 2014 May 27
Lansing, MI, 48911
... Fulfill all engineering duties from the SOR to PPAP, including but not limited to; Simultaneous engineering, build and delivery in time, scheduling verification and approval, Layout reviews and all other activities related to required documentation ...
- 2014 Apr 24
Lansing, MI
... Implemented APQP, PPAP, run-at-rates at suppliers. . Conducted Supplier Development improvement process at suppliers. World Wide Purchasing Group Leader Supplier Quality 1990-1994 Oldsmobile/BOC/Small Car Group Materials Management 1983-1994 ...
- 2013 Oct 23
St Johns, MI, 48879
... I am currently learning Quality Systems, including Advanced Product Quality Planning (APQP), Production Part Approval Process (PPAP), as well as fielding any defective parts to their correct places. I have worked closely with Caterpillar as well as ...
- 2012 Nov 10
Lansing, MI, 48911
... Fulfill all engineering duties from the SOR to PPAP, including but not limited to; Simultaneous engineering, build and delivery in time, scheduling verification and approval, Layout reviews and all other activities related to required documentation ...
- 2012 Oct 27
Morrice, MI, 48857
... Taguchi DOE’s, SPC, GD&T, FMEA,PPAP’S • Performed all design and product validation builds and testing • Analyzed process FMEA’s to determine critical process parameters and devise validation method to eliminate or reduce effects of these failures
- 2012 Sep 08
Linden, MI, 48451
... Developed and implemented position strategies for: Raw Material and Plating Cost Increases, Volume Fluctuations, and Prototype/PPAP samples. Championed the following weekly reports: Quote Status and Follow Up, Engineering Project Log, APQP/PPAP ...
- 2012 Aug 21
East Lansing, MI, 48823
... Responsible for PPAP & APQP Activities; all phases. . Responsible for supplier development & mentoring within assigned commodities/programs. JOHNSON CONTROLS, INC., Holland, MI 2000 - 2003 Quality Engineer/Supervisor . Managed/mentored team of four ...
- 2011 Jul 24