|
Resume alert |
Resumes 1 - 10 of 277 |
Weatherford, TX, 76087
... Analyzed in-house and vendor manufacturing/data collection, then created a monitoring system: MES (UNIX) computerized ERP (MRP/Six-Sigma) with KPIs, dashboards and SQLs; saving $7M/month LEAD MANUFACTURING ENGINEER Consultant – LORAL 2/92 – 09/93 ...
- May 03
Burleson, TX
... Knowledgeable on all aspects of Supply Chain Management, as well as SAP ERP and WM implementations, and the business functions associated with relevant technologies including MRP, MPS and demand planning and forecasting. Proficient in ISO and AMA ...
- Apr 24
Fort Worth, TX
... Monitored MRP for material availability for a timely build. Interfaced with Development Engineering, Program Management, Purchasing and Manufacturing to ensure a quality build. Monitor Sales Orders and forecast to align with material availability. ...
- Apr 23
Irving, TX
... Added MRP controller, destination in /SAPAPO/RRP3 using BADI /SAPAPO/RRP_IO_CO Implemented BADI in CIF SAPAPO/CIF_TPSRC_MAINTAIN to sync the contract in APO and SAP. Worked on enhancements in vistex modules like chargeback, Contract, Customer Rebate ...
- Apr 19
Dallas, TX, 75230
... Fiber Optics, Electro-Optical, Opto-Electronics, Optoelectronics, OptoMechanical, Photonics, Microscope, ECN, ECO, MRP, Catia V5, ProCabling, Pro-Cabling, Pro/E Wildfire, Pro-E, ProE, Pro E, Pro-Engineer, Pro/Engineer PTC Creo 2.0, Creo, UG ...
- Apr 10
Arlington, TX
... H-Lookups, Warehouse & Labor Management, Kanban, 5S, SPC, Time Study, Procurement, FMEA, Kaizen, Statistical Analysis, ERP, MRP, Value Stream Mapping, 3PL Certifications: Lean Six Sigma Green Belt, Supply Chain Management, Program Management, SAP S4 ...
- Mar 19
Arlington, TX
... Drove a strategic operation initiave to restructure the ERP/MRP system and Manufacturing Model to reduce waste and increse profitabiliy. o Managed the On-Time delivery crisis, OTD from 25% to 96%. o Reduced manufacturing overtime by 80%. o Led the ...
- Feb 24
Fort Worth, TX
... Utilized SAP to convert MRP generated req’s to purchase orders. ME5A runs a shortages report for each buyer. Utilized SharePoint in MS Teams to sort thru reports and complete the daily task in SAP; ME5A Utilized SharePoint “Shortage Tracker” created ...
- Feb 06
Roanoke, TX
... raw materials, logistics, maintain storage controls, distribute finished goods, housekeeping, established a preventative maintenance program for heavy equipment, repairs, employee development, MRP, change management, training and coaching sessions. ...
- Jan 24
Fort Worth, TX, 76114
... • Experience with welding gases and welding components • Maintained Metrics logs in direct correlation of information from MRP system • Maintained physical hand written logs for government inventory • Followed and taught co-workers on government ...
- Jan 24