Distance: |
Resume alert |
Resumes 111 - 120 of 384 |
Manama, Capital, Bahrain
... CAAD training center 2014 WORK EXPERIENCE – 7 YEARS + MADAN ABBAS CONTRACTING COMPANY W.L.L (PROJECT ENGINEER) (JANUARY 2021 – PRESENT) Duties & Responsibilities Making a program as per the project dead line Cost analysing for material and manpower. ...
- 2021 Sep 03
Manama, Capital, Bahrain
... ●Preparing and reviewing of various Engineering documents like specification sheets, Technical bid evaluation, Instrument index, Instrument I/O list, Material Procurement Register, Monthly expenses, Calibration records, work Log book, Cable and JB ...
- 2021 Aug 25
Manama, Capital, Bahrain
... Familiarized with Material safety data sheet (MSDS) of chemical handled. Trip Drill – Once in four months, trip drill was conducted to ensure the efficiency of the operator to act fast in emergency. Undergone training in Distributed Control System ...
- 2021 Aug 20
Manama, Capital, Bahrain
... • Generating bill of material as per project, maintaining record sheet of quantities, drawing revisions with engineering details. Also involved in engineering releases, change requests. 4. On-Site Deputation- BFG International, Bahrain (From June ...
- 2021 Aug 16
Bahrain
... Preparing Actual Estimation/ Variations and Material Quantities for Job Contract when I received the Site Instruction from the Main Contractor/ Client. Quantity Surveying and finding Cables size, Wires, Isolators, HV and LV Electrical panels (MDB, ...
- 2021 Aug 14
Manama, Capital, Bahrain
... Power distribution drawing, IO module wiring drawing, Functional logic diagram, Loop diagram, Control narratives, Modbus communication list, Material Requisition (MR) for ICA, handover documents (as-built drawing, O&M manual), FAT documents etc. ...
- 2021 Aug 13
Manama, Capital, Bahrain
... Also ensuring the smooth supply of material, consumables and equipment to the company. Palestinian Economic Council for Development and Reconstruction (PECDAR). Project coordinator February 2012 – March 2013 United Nations Relief and Works Agency ...
- 2021 Jul 30
Khobar, Eastern, Saudi Arabia
... • Prepare material take off lists (MTO). Project Experience in this Position: • Upgrade Security Facilities East West Pump Stations (HCIS 2017)-BI-10-00449. • Relocate Jazan-Abha Refined Products pipeline for in plant facility-BI-10-008**-**** ...
- 2021 Jul 25
Salmabad, Northern, Bahrain
... Keep records of all incoming and outgoing material, issue daily material, raise LPOs, Prepare comparison reports based on transaction, keep tracking on material stocks and their handling. Prepare Income Statements Prepare fixed cost and variable ...
- 2021 Jul 04
Khobar, Eastern, Saudi Arabia
... Dealing with consultants during inspections Preparing request for inspection of activities, material inspection delivery notes for material recieved, Architectural drawing submittals and daily reports. Checking plans, quantities and drawings to ...
- 2021 Jun 20