|
Resume alert |
Resumes 61 - 70 of 10454 |
Broadlands, VA, 20148
... Developed the design criteria based on requirements analysis, and selected components and devices to be used. Assembled a fully operational test system within Leidos’ Validation and Verification Laboratory. Scripted and presented classroom training ...
- May 02
Downtown, DC, 20004
... Compile and check daily record sheets, guest accounts, receipts and vouchers using computerized or manual systems. HONORS AND ORGANIZATIONS US SEWA (Central-African-Republic Non-Profit-Organization) (Bookkeeping Honor Recognition)
- May 02
Ashburn, VA
... Experience NTT DATA, Information Architectural Lead Mar - initiatives, - data - significantly - implementation Spearheaded Influenced Led Organized 2023 governance the design – ensuring project the Feb improving requirements adoption and timelines. ...
- May 02
Ashburn, VA
... QA Testtrail Exploratory testing Database, SQL QTP HP ALM (QC) Unix Selenium with java Work History QA Engineer, 01 ... to test cases,create requirements, set up releases and cycles, run reports. Strong knowledge in Black box testing Manual ...
- May 02
Washington, DC
... compiling information into documents, cleaning and maintaining lab equipment, using testing items and subjects to gather results, gathering data and information from test subjects and monitoring ongoing tests and experiments, noting any differences. ...
- May 02
Washington, DC
... Ensured the definition of done was followed, acceptance criteria were understood, and test case management and defect tracking were performed correctly on every iteration. Assisted with internal and external communication to improve transparency. ...
- May 02
Herndon, VA
... and flexibility to changing requirements and milestones. WORK EXPERIENCE: Contracting Work for Technical Writing/ Editing/QA ... preferred product information and standards for a Technical Reference Manual for publication to federal courts nationwide. ...
- May 02
Arlington, VA
... Modified products to meet customer requirements on an as-needed basis. Conducted functional testing on a variety of components, sub-assemblies, and systems. Performed preventive maintenance on equipment in accordance with manufacturer’s standards. ...
- May 01
Silver Spring, MD, 20910
... • Boosted production with automation to achieve objectives with lower material and time requirements. • • Managed numerous projects simultaneously to meet tight deadlines. • Combined illustrations, text, product data, photos, and graphics as needed. ...
- May 01
Washington, DC
... Which consists of plumbing repairs, painting and any interior and exterior of building and apartment requirements • Physical loading, unloading and/or sorting of packages by hand, including lifting, pushing, pulling, carrying and placing, in a safe ...
- May 01