|
Resume alert |
Resumes 51 - 58 of 58 |
TN, India
... Cable laying of HV Swbd, LV Swbd, Gas turbine battery isolation panel, metering control panel, UPS system main distribution board, Nav aid battery panel, normal & emergency lighting panel, fire & gas, fire damper & HVAC system 3. Megger test, ...
- 2013 Oct 31
TN, India
... HVAC (Heating, Ventilation and Air Conditioning):- Experienced in Package Unit, Kitchen Hood, Central Plant, District Cooling and split Air conditioning like Heat Load Estimation (HAP- CARRIER), Equipment selection (TOPSS), Duct Design & Sizing ...
- 2013 Oct 20
Trichy, TN, 621111, India
... Sound Exposure to HVAC control & Fire Alarm system Good Knowledge on Access control, CCTV system and Knowledge on Intrusion system Academic Credentials B.E in Electrical and Electronics Engg. from Karunya Institute of Technology, Coimbatore passed ...
- 2013 Jun 09
Tiruchchirappalli, TN, 620012, India
... SWS & HVAC Package of TAPP 3&4 Nuclear Power Project - NPCIL, India . Songo Songo Pipeline Project - Songas Power Limited, Tanzania . Sidhpur Sanganer Pipeline Project - Indian Oil Corporation Limited, India . Independent Power Tanzania Limited ...
- 2013 Feb 08
chennai, TN, 600063, India
... MEP Material quantity Cross checked before issue the purchase order Preparation of Material Analysis Report , Cost Analysis Report Analyzing Electrical, Telephone, HVAC, Plumbing, Drainage, Fire Alarm, Fire Fighting, CCTV and PA system Technical ...
- 2012 Apr 25
Paramakudi, TN, 623707, India
... 0.415KV Switch gear, 17MVA-33/11KV, and 8MVA/11/6.6KV Transformers, Battery Bank, Cable Trays, Cable laying (33KV, 11KV, Instrument, F & G, Fiber Optic, Modbus Cable), Terminations, Lighting, HVAC, Lightning Arrestors and Cathodic Protection system. ...
- 2012 Apr 02
TN, India
... o Proven abilities in managing technically advanced, state of the art operations and processes in Electrical/Mechanical works, HVAC, Plumbing, Fire Fighting Systems. o Strong relationship management, communication skills with the ability to network ...
- 2012 Mar 27
Aranthangi, TN, 612614, India
... MATERIAL : JOTUN, CAFCO Fire Stopping (Design, Execution for 2Hrs & 4 Hrs) Movement Joints (Horizontal & Vertical) HVAC Insulated/Non-Insulated Ducts Electrical (Cables, Cable Tray, Cable Trunk & Busbar) Piping (Fire, Chilled water, Drainage, Strom ...
- 2012 Mar 20