CURRICULUM VITAE
FUTURE AMBITIONS - SENIOR MANAGEMENT
• QA/QC, QHSE
• ISO Management System Audits
• Project Management, Planning & Scheduling A.PADMANABAN.B.E.
********.**********@*****.***.
Mobile: +91-997*******.
OVERALL SUMMARY
• Over Seven Years Experience in Overseas an Engineer. Abu Dhabi. U.A.E.
• Over Four Year Experience in Engineer in Manufacturing Industry. India.
ADDITIONAL
• Certified LEAD AUDITOR for OHSAS ISO 18001:2007 & EMS ISO 14001:2004 Standard.
• IRCA Certified LEAD AUDITOR for QMS ISO 9001:2008 Standards. IRCA No: 01197494.
• Course Completion done for Project Management Program PMP.
• Ministry of External Affairs Attested Engineering Degree Certificate& Valid UAE Driving License.
• Excellent Exposure in GCC Countries & Projects.
EXPERIENCE
COMPANY DESIGNATION DURATION LOCATION PROFILE
INTHERPRO LLC Engineer 24.10.2007 – 14.08.2011 Abu Dhabi. U.A.E Applicators for Cold & Hot Insulation, Refractory are in Oil & Gas Industries.
FM Approved Applicator for Fire Stopping, Fire Sealing & Fire Proofing.
MIDDLE EAST OPTRONICS Consulting Engineer 17.07.2006 – 15.07.2007 Abu Dhabi. U.A.E Aviation Products Trading in Military Defense & Govt Sectors.
Consulting Service for Various Systems of QMS, EMS, OSHAS, IMS, & etc
BIN MURAD MECHANICAL CONTRACTING. Engineer 17.06.2004 – 10.07.2006 Abu Dhabi. U.A.E Solar Projects / Products Trading & Technical Consulting.
P.K INDUSTRIES Management Representative / Quality in charge 18.01.2003 – 27.04.2004 Chennai. India. Monopoly supplier for OEM Lucas – TVS Ltd.
Machining and supplier for all types of Pinion
PHOTON ENERGY SYSTEMS LTD Asst. Engineer.
(Quality Systems) May ’00 – Dec ’02 Hyderabad. India. Equal Competitor for International Standard solar Module Manufacturers.
100KW Power per month of Renewable Energy to IREDA & customers.
MODERN FOUNDRIES Production Supervisor May ’99 – May ‘00 Hyderabad. India Manufacturing of Grey Cast Iron Products.
VARIOUS ROLE PLAYED PROJECTS IN GCC.
NAME OF PROJECT CONTRACTOR DURATION SCOPE LOCATION
DEEP PANUKE N-79 OFFSHORE PLATFORM Gulf Piping Co./ SBM OFFSHORE 1 Month Insulation & Cladding Abu Dhabi. U.A.E
RASLAFFAN OLIFEIN PROJECT Lahoud Engineering / Technip France 4 Months Refractory / Insulation & Cladding Raslaffan. Qatar.
GASCO HABSHAN SHUTDOWN Descon Engineering 5 Months Insulation & Cladding Habshan. U.A.E.
TAWEELAH POWER STATION NEW B EXTENSION FISIA ITALIAMPANTI 12 Months Insulation & Cladding Abu Dhabi. U.A.E
INDIVIDUAL HANDLING PROJECTS IN ABU DHABI
MIST (Masdar Institute of Science & Technology) Al Ahamadiyah Contracting Co. 15 Months Fire Stopping / Fire Proofing
ICAD SUB STATION Electromechanical Contracting Co 2 Months Fire Stopping
YAS ISLAND CHILLER PLANT CAT Contracting Co. 5 Months Insulation & Cladding
YAS ISLAND VALVE PITS CAT Contracting Co. 11 Months Insulation & Cladding
SADIYATH AL MANARATH ALEC 1 Month Fire Stopping
Al Bahr Towers (ICHQ) Abu Dhabi Al Futtaim Engineering / BK GULF 8 Months Fire Stopping / Fire Proofing
Responsibilities Handled & Roles Played
QHSE Management Representative / ISO Consultant
Preparation of project QA/QC & HSE requirements by use of applicable QA/QC & HSE procedures, tools and methods. (Safety case regime, risk assessment, HSE plans, QA/QC plans, Inspection and Test Plan and systems, QA/QC audits, investigations, reporting)
Evaluating inspection reports and test results as per International Standards/ Customers Standards / specs
Supervision of QA/QC Inspectors for different Inspection activities
Preparation of Bidding documents relating to QA/QC
Attend regular progress review meetings with clients
Liaise with senior management and clients regarding QA/ QC matters of projects
Prepare and implement QEOHS Manual
Maintaining of all quality, safety and environmental standards (ISO 9001.14001, OHSAS); Develop and conduct QHSE training to employees or visitors where necessary
Identify HSE improvement areas and implement necessary measures to ensure compliance with statutory and corporate requirements
Ensure incidents and or accidents are promptly notified to the authorities where necessary; investigate, document and follow up accordingly Responsible for Design of Minimum Requirements of Documents In line with International Standards.
Responsible for Quality Policy, Objectives & Process Measurement of KPI.
Responsible for Internal Quality Audit, Customer complaints of Corrective / Preventive Action.
Responsible for Continuous Improvement / Quality Planning, Supplier Quality Management / Quality Improvement.
Co-ordinate the implementation of certification assurance processes within the project for regulatory compliance
Be familiar with the requisition requirements and equipment/material specifications.
Ensure all certification requirements are clearly identified, understood and included with the requisition and PO.
Ensure that all necessary quality records are identified and retained in accordance with client and regulatory requirements.
The preparation of the companies QA manual control and supervision of all amendments and revisions
Control and the distribution of all the companies quality documentation
Monitor all quality related activities on the project
Perform all internal and external audits on behalf of the company’s management
Planning / Scheduling Projects Execution / Management
Responsible for Preparation of Project Management Plan, Deliverables, Completion Document for Management Reporting & Idle Monitoring of Manpower, Equipments & Logistics.
Responsible for monitoring the progress of the work, visiting site beforehand, Checking work processes meet building regulations, writing reports to Management.
Ability to Prepare Baseline GEPCC (General/ Engineering/ Procurement/ Construction/ Commissioning) Schedule. WBS, sequence of work, manpower, equipment, all resource
Establishing standard project control documents
Cash-flow, monitor, track and update project cost against budget Update project status, resource and financial forecast
Preparation of claims/variation order both time and cost impact & to participate (as necessary) in management visits/audits to Suppliers and Sub-contractors.
Preparing estimates of project cost, Bill of Material (BOM) drawings for construction and submitting them to the Main Contractors / Tender for securing approvals.
Coordinating Inventory control for the Permanent / Consumables Materials to ensure proper utilization of project schedule.
Mobilizing resources as per project requirements, ensuring the project targets meeting as specified timelines. liaising with clients and reporting progress, professional staff (such as architects and surveyors ) and the public
supervising contracted staff meeting contractors
making safety inspections and ensuring construction and site safety checking and preparing site reports, designs and drawings maintaining quality control procedures
Motivating the workforce problem solving using specialist construction management computer applications.
The preparation and control of project quality system management documentation prior to project commencement
Facilitate the coordination of required verification information between the Client Representative, Client and project personnel.
Attend Pre-production kick-off meetings with Supplier/Subcontractor (as appropriate).
Report promptly to the Project Quality Manager all matters related to verification scheme performance and regulatory compliance.
Ensure the integrity and legal compliance of the product by engaging and working with, Client Representative, Client and project personnel.
Project personnel are suitably trained in Project Verification Plan requirements and to access and apply dependent systems, procedures and reference materials via the Project Web Site, QMS, PMS and the Knowledge Communities as applicable. Facilitate regular meetings with all interested parties to ensure alignment of understanding and direction.
Oil & Gas, Power Industry Exposure Fire Protection Exposure
Ability to quick understanding the Structural, P&I Diagram, ISO detail diagram for Projects / Plants.
Understanding the sequence of activities in Piping & Equipment s for Live Plants, Shutdown/ New Plant Construction.
Identification from P&I to Execution of Various Activities like Hydro Testing, Corrosion wall Thickness measurement, welding, brazing, sand blasting, painting, Insulation & Cladding of Static / Dynamic Equipments & Pipe lines.
Project Verification Plan and systems, procedures are developed and implemented in compliance with the requirements of the Quality Management System (QMS) and Project Management System (PMS) consistent with specific location, regulatory and contractual requirements.
UAE GASCO, TAKREER, Desalination & Power Plants.
QATAR RASGAS, QP, Olefins. Fire Proofing (2Hrs & 4 Hrs)
Steel Structures as per Clients Requirement Various Fire Proofing Painting Suppliers.
MATERIAL : JOTUN, CAFCO
Fire Stopping (Design, Execution for 2Hrs & 4 Hrs)
Movement Joints (Horizontal & Vertical)
HVAC Insulated/Non-Insulated Ducts
Electrical (Cables, Cable Tray, Cable Trunk & Busbar)
Piping (Fire, Chilled water, Drainage, Strom water, Coldwater & Supply water)
MATERIAL : HILTI, 3M
EDUCATIONAL QUALIFICATION
B.E - Production Engineering M.B.A Project Management
1995 – 1999 FIRST CLASS 2008 - 2010
Mookambigai College of Engineering, Bharathidasan University Annamalai University
Tiruchirappalli, Tamil Nadu. India Chidambaram, Tamil Nadu. India.
COMPUTER PROFICIENCY
OPERATING SYSTEM Ms-Dos, windows XP/7. ADMINISTRATION Ms-Office, Photoshop
DRAFTING Auto CAD-2007, Micro station DESIGN 3D Max, MDT, SDR Mapping.
ANIMATION Abode Photoshop, Corel Draw. PLANNING Ms-Project, Primavera – 6
PERSONAL DETAILS
DATE OF BIRTH 18.12.1977 PERMANENT COMMUNICATION 3/30, TSP Complex
Veeramma Kali Kovil Street,
Aranthangi. Pudukkottai (D.T)
Pincode: 614616.
Phone: +91-997*******.
NATIONALITY INDIAN
PASSPORT No J 4328256
MARITAL STATUS MARRIED
LANGUAGES English, Hindi, Arabic, Telugu &Tamil PRESENT POSTAL COMMUNICATION C/O Mrs. Megala Prabaharan.
Blk#132, 03-04.
Chau chou Kang Avenue 1,
Singapore – 630182.
Phone:+65-66990417.
LAST SALARY USD 4000 +Benefits
EXPECTED SALARY SGD 5000 (Negotiable)
DATE OF JOIN Immediate from Offer Letter. Professional Network Arumugam Padmanaban - LinkedIn
BEHAVIOUR
Self-Motivated, Dynamic. Team Player for Projects. Good Communication skills. Ability work under Pressure.
Place: [A.Padmanaban.]