|
Resume alert |
Resumes 11 - 19 of 19 |
Columbia, SC
... Equipment Responsible For: Coal Fired Boilers, Turbine Generators, Vaporizers, and Air Compressors. 2001 – 2007 CMC-STEEL; SC; Cayce, S.C. Maintenance Planner/Scheduler – Rolling Mill Creates job plans for approved work orders from start to finish ...
- 2014 Jan 05
Lexington, SC
... I also repaired and rebuilt cylinoids, valves, compressors, air dryers, pumps, crusher mills, coal mills, hydraulic systems and accumulators. I would weld and replace piping and structural platforms, as needed. I replaced and adjusted elevators, ...
- 2013 May 20
Columbia, SC
... Marshall European Center for Security Studies, Germany, 2006) Field Research, Human Rights, Local Communities & International Coal Mining, Witness for Peace Delegation, Colombia, August 1-11, 2006 Project Consultant, Academic Co-Director and Field ...
- 2013 Jan 19
Columbia, SC
... Developed Outage schedules for two 700 MW and an 1100 MW Coal Fired Power Plant ? Developed schedules for cleaning repairs and damper replacement in the plant scrubber system using Primavera P3.1. ? Supported the General Manager of Fossil Plant ...
- 2012 Oct 14
Irmo, SC, 29063
... • Conducted safety training for Material Handlers: Fossil-Hydro-Plant Coal & Rock Quarry. • Conducted safety audits and inspections to comply with DHEC, EPA, OSHA, DOT, NFPA, ANSI, NEC, RCRA, MUTCMB, LLR, and Non-hazardous and Hazardous Regulatory ...
- 2012 Jul 25
Clemson, SC, 29631
... Designed water treatment plant Evaluated alternative sources of energy like wind power, nuclear power, hydroelectric power using decision matrix for elimination of coal from the U.S Evaluated of Process Modification at Clemson Waste Water Treatment ...
- 2012 Feb 11
Gaston, SC, 29053
... Job details: Remanufacturing coal dozers and other heavy equipment. I worked in the welding shop rebuilding various parts to the equipment. This was a summer job temp. 05/04/2002- 08/05/2002 Sun Machinery Lexington, South Carolina Welder-Fabricator ...
- 2010 Oct 01
Lexington, SC
... • Increased coke/coal inventory turns 50%, generating $8M million in additional funds flow. • Led Corporate negotiations for $40M in energy expenses (Coke, Coal, Nat. Gas, Electricity), reducing delivered cost 15%, and avoiding 30% ($12M) over 1 ...
- 2010 Sep 21
Lexington, SC, 29072
... • Increased coke/coal inventory tu rns 50%, generating $8M million in additional funds f low. • Led Corporate negotiations for $40M in energy expenses (Coke, Coal, Nat. Gas, E lectricity), reducing delivered cost 15%, and avoiding 30% ($12M) over 1 ...
- 2010 Jun 28