|
Resume alert |
Resumes 41 - 50 of 80 |
Vienna, VA, 22180
... Engineer of telecommunications 6/03 to 12/09 ●Designing, Installing, Configuration and Integration BTS CDMA800 & WCDMA 2100 Huawei Equipment, MW Mini-Link Equipments ●Work with the equipment protocols 802.11, 802.16. Project of network of WiMAX ...
- 2016 Nov 16
Ashburn, VA
... Samsung to ALU (LTE eNodeB), Ericsson and ZTE to Huawei (2G BTS and 3G nodeB), Ericsson and Nokia to Huawei ( 2G BTS and 3G nodeB), ALU to ZTE (2G BTS and 3G nodeB), Nokia to Ericsson (2G sites), Siemens to Nokia (2G Sites) and Alcatel to Motorola ...
- 2016 Sep 28
Herndon, VA
... Telecomm Engineer May 2008- April 2010 BSNL/ZTE, India Involved in installation and maintenance & performance monitoring of BSC and BTS of Nortel, Nokia, Ericsson and ZTE. Created reports of all cell sites, including alarms, network performance ...
- 2016 Feb 22
Herndon, VA
... $7.3 billion revenue) WIMAX BTS Network Engineer Supporting CLEARWIRE with the rollout and testing of WIMAX in the NEW York METRO market Conducting firmware and software upgrades on Wimax RAS Base stations Troubleshoot alarms on the Base stations as ...
- 2015 Nov 04
Capitol Heights, MD
... • Developed and updated the CXSS annual spend plan and incorporated the information into the automated Budget Tracking System (BTS) for reconciliation with CAFRMS. • Provided support to the Counterforce Systems (CXS), DTRA, Planning, Programming, ...
- 2014 Apr 28
Alexandria, VA
... CGMP, IGRP, EIGRP, OSPF, ESCON, FICON, VCSEL, MEMS • Network Topology: MSC, GMSC, ATM, EMS/OSS, SONET, SMLC, GMLC, BSS, BSC/BTS, STP, HLR, VLR, SCP, MSC, SGSN, GGSN • Nodes: Alcatel-Lucent 5060 WCS, Alcatel-Lucent 7570 WMG, Alcatel-Lucent 7670 RSP, ...
- 2014 Feb 06
Glenn Dale, MD
... Knowledge of Radio Frequency Scanning with Z750i (MS) Experience in Base Station Controller (BSC) and Base Transceiver Station (BTS) Dimensioning Performed Drive Test, Quality Test and Network Optimization tasks Collected data using Ericsson TEMS ...
- 2014 Feb 01
Arlington, VA, 22201
... -Doing Integration of 4S-2C BTS at field, working with BSS/NOC People. -Testing of Alpha, Beta, Gamma and Delta sector LTE green colour fiber and termination on DUL optical SFP. -Testing of Optical SFP. -Doing the installation of GPS antenna Cone, ...
- 2014 Jan 29
Ashburn, VA
... a) Network Activities Monitoring and Control on BTS (Base Transceiver Station) b) GPRS and EDGE Activation and Deactivation c) Network Fault Finding for Particular Sites d) Survey for Network Availability at Particular Site e) Benchmarking ...
- 2013 Dec 21
Upper Marlboro, MD, 20772
... in racks, cabinets, plumbing all RF, wi ring all power, punch down of a Cat 5, 5E, 6 cables • Support installation of BBU, BTS, switch equipment, MW equipment • Provide field support for equipment installation RBA72/9412, cell tu rn up and cell ...
- 2013 Sep 09