Suri, WB, India
... Operating DCS(DELTA V EMERSON),Yokogawa Routine & Emergency shutdown procedure of Boiler and Turbine Ensuring optimum utilization of machines and manpower. Taking corrective action on critical issues. Providing informative & technical support. ...
- 2018 Jan 14
Kolkata, WB, India
... and industrious Welder with over 10 years of experience in Welding work related to Heavy Earth Moving Machine and General Boiler Machines • Experienced in welding, fabrication, steel erecting and sheeting work • Knowledge of MAG, MIG, TIG Welding ...
- 2017 Dec 17
Durgapur, WB, India
... Plant Details:- Plant Capacity – 1*10 MW Boiler Make – Thermax Ltd. Boiler Type – Waste Heat Recovery Type Boiler (Coke Oven) Capacity – 2*22.5 TPH Pre & Temp – 78kg/cm2,500 oC Turbine Make – Triveni Ltd. Turbine Type- Bleed steam, Condensing, ...
- 2017 Dec 07
Kharagpur, WB, India
... PROJECTS HANDLED: Commissioning And Errectioning Of 1 X 48MW SIEMENS MAKE TG & 175 TPH ISGEC MAKE CFBC BOILER. Features of R.M.L.: 1 X 48MW TG SIEMENS. 1 X 32MW TG SIEMENS. 1 X 12MW TG SIEMENS. 1 X 175 TPH CFBC BOILER ISGEC LTD. 1 X 100 TPH CFBC ...
- 2017 Dec 06
Kolkata, WB, India
... Overhauling of Boiler Coal Mill & Coal Feeder, 2. Preventive Maintenance of Gas Air Pre Heater, 3. Overhauling of Gas air Dampers (Hot & Cold), 4. Daily Maintenance job in Demineralization (DM) plant, Date: Place: Signature
- 2017 Oct 26
Kolkata, WB, India
... PROFILE SUMMARY •Expertise in O&M department to look for various maintenance activities in 1*25MW CFBC Boiler from 04/05/2007 to 22/06/2010 as a Maintenance Supervisor in Jindal Steel & Power Plant, Raigarh. •Expertise in O&M department to look for ...
- 2017 Oct 24
Kolkata, WB, India
... from 01/08/2007 to 10/07/2010 as an Engineer for operation & commissioning 175 TPH CFBC Boiler (Chinese Make) & 30 MW TG set (Chinese Make). JOB PROFILE: Take charge of the Operation of CFBC Boiler (4x210 TPH & 1x390 TPH) and turbine (3x130MW) from ...
- 2017 Oct 21
Kolkata, WB, India
... Project: Project Title: Nabinagar Power Generation Company (NPGC), Nabinagar Client: NTPC EPC: BHEL & Alston, Siemens Role: ENGINEER RESPONSIBILITIES:- Controlling over all QA activities in Boiler, ESP and TG. Making of WPS for all materials. ...
- 2017 Oct 11
Kolkata, WB, India
... pneumatic annual highest of departmental engineering safety systems, standards electro-requests budget static in of smelter and US$ precipitator, processes 4m to by achieve effective boiler, for modifications ‘Zero crushers, planning Harm’. ...
- 2017 Sep 14
Suri, WB, India
... Regular maintenance of critical & non critical motors of power plants (FD fan,ID fan,PA fan) Maintenance of crane (DMEG) & cutters (Miltex,Jaganberg,Taiwan) Annual Boiler Shut Down & break down. Lighting maintenance,Air Conditioner Maintenance & it ...
- 2017 Jul 28