Boiler resumes in Lucknow, Uttar Pradesh, India

Sign in
Search for: Jobs   Resumes


distance:
Get new resumes like this by email Resumes 1 - 10 of 32

Engineer Maintenance

Lucknow, Uttar Pradesh, India
... 2- Organization: SIMAR INFRASTRUCTURES LIMITED (July - 2016 to January - 2019) (Under Talwandi sabo power Ltd, panjab) (Distt:-mansa) Designation: ENGINEER Area: Maintenance and Overhauling of Boiler Pressure Parts. Total Scope of Steam Turbine: - ... - 2019 Dec 22

Operator Safety

Lucknow, Uttar Pradesh, India
... - power management system controlled by two redundant controllers, instrument and valve calibration, - fire systems and their maintenance (safety), - electrical and electronic safety system for boiler, fuel engine and turbine engine, air compressor, ... - 2019 Dec 16

Electrical Engineering Training

Lucknow, Uttar Pradesh, India
... TRAINING Title: Description: Four week summer training in Panki Thermal Power Powers Station, Panki Kanpur The training complete in turbine and boiler. Title: Description: Four week summer training in Hindustan Aeronautics limited, TAD Kanpur Learn ... - 2019 Oct 31

Power Plant Civil Engineering

Lucknow, Uttar Pradesh, India
... backfilling, leveling, area grading, pipe rack foundations, TG Building, AC & DG Building, Boiler area, All types of finishing works like brickwork, plaster, painting works, floor finishes, joineries, roof water proofing, plinth protection etc. ... - 2019 Sep 24

Power Plant Engineer

Lucknow, Uttar Pradesh, India
... Operation of CFBC boiler (250 TPH) & coal handling plant. Handling Emergency turbine operations such as black out, trippings. Prepared Emergency plant situation effectively PERSONAL PROFILE Name : Vaishali Mishra Date of Birth : 18thMarch, 1996 ... - 2019 Apr 11

Electrical Engineer Engineering

Lucknow, Uttar Pradesh, India
... NAME OF THE PROJECT : (DDUJY- DEEN DHAYAL UPADHYAYA GRAM JYOTI YOJANA Name of the Company : EDAC ENGINEERING LTD Work project : ELECTRICAL SUPPLY CUM ERECTION OF ESP RENOVATION & RELOCATION OF BOILER-UNIT-01&03. Post Held : Jr. ELECTRICAL ENGINEER ... - 2019 Mar 11

Power Plant Engineer

Lucknow, Uttar Pradesh, India
... Manager (C&I) Key Result Areas: Spearheading overall project responsibilities of Instrumentation Department for equipments of 2 x 45 MW siemens turbine and 2X190 TPh Thermax boiler running project Handling activities like UPS installation and ... - 2018 Dec 21

Power Plant Operator

Uttar Pradesh, India
... Training - Pf boiler, Afbc boiler, Co- Generation plant, Bowl & Ball mill, Exjhast mill, Pressried mill, Dm plant, Rotri fdr, Bolimatric cool fdr, Cool bonker area etc. Working Experience plant :- 1- Date 20.10.2010 to 30 3 MW China Vadanta Aluminum ... - 2018 Nov 30

Power Plant Engineer

Lucknow, UP, India
... Job Role:- Execution of Boiler commissioning activities & start-up of Boiler with full load. Strong team builder with proven ability to motivate team members towards achieving targets. Responsible for Smooth & Continuous operation of Boiler DCS. ... - 2018 May 14

B.E.Electrical Power Plant professional with vast experience of O&M Pr

UP, India
... AVRs, Protective Relays, VCB, SF6 CB, ACB, CFBC Boiler of 100 TPH with DCS control system, DC Thyristors drives, Inverter drives, Eddy current drives, High Voltage (3.3KV) Synchronous motor( upto 2000HP) & its starters, maintenance of HV/LV ... - 2018 Mar 04
1 2 3 4 Next