SHRIKANT SINGH
Chief Executive Officer- Power Plant
: adwq4r@r.postjobfree.com : +91-860*******
Key Impact Areas
Operations & Maintenance
Preventive, Predictive, Breakdown Maintenance
New System Implementation
CAPEX / OPEX
Strategy Planning & Execution
Liaison & Coordination
Installation, Erection & Commissioning
Contract Administration
Project Management
Cost Reduction Initiatives
Resource Optimization
Procurement Functions
Quality Management System
Techno-commercial Operations
People Management & Leadership
Soft Skills
Education
Certifications
Strategic Maintenance, JMA Management, New Delhi
Total Productive Maintenance, JMA Management, New Delhi
TPM at Work Place, JMA Management, New Delhi
Training 0n Wartsila DG & its Auxiliaries, Wartsila Training Centre
Profile Summary
Career spanning 38 years of experience, delivered end-to-end expertise in operations & maintenance across Power Sector with focus on top & bottom-line profitability through utilization of resources, minimized downtime, improving operational effectiveness and ensuring smooth uninterrupted operations
Contributed in formulating budgets, planning OPEX / CAPEX, bringing continuous efficiencies in expenditure through operational controls and technology initiatives along with P&L management
Set the power projects with key focus on top & bottom-line profitability through optimal utilization of resources including feasibility study, budgeting, as well as installation of equipment, etc., built project teams completed the projects within time & cost parameters
Implemented preventive & predictive maintenance schedules of equipment to ensure minimum breakdown with an increased machine uptime and equipment reliability
Evolved strategies for implementing world class manufacturing processes; managed labor requirements / manpower planning, implemented SOPs, equipment modifications and developed innovative processes by utilizing available technologies
Executed cost saving techniques / measures and modifications to achieve substantial reduction in expenditures and work within the budget
Steered improvement initiatives with focus on streamlining & managing Plant Operations with proactive planning through introduction of innovative processes
Managed troubleshooting & commissioning activities while developing baselines; controlling operations with respect to cost, time overruns and quality compliance
Built strong working relationships with stakeholders across functions and levels, engaged with cross-functional departments
Implemented HSE / Environmental Safety Standards; maintained EHS Standards and taking preventive corrective action to minimize risk/accidents
Classified & developed potential vendors / suppliers for achieving cost-effective purchases of materials & attaining reduction in final procurement cost
Comprehensive exposure to rules of electricity rules, IRDA, MNRE, CERC and all relevant of Govt. procedures
A Perfect People Manager with expertise in directing workforce using interactive and motivational leadership that spurs people to willingly give 100% effort
Career Timeline (Recent 5)
Professional Experience
Jul’16 – Jan’23
Sukhbir Agro Energy Ltd., Punjab as Chief Executive Officer- Power Plant
Key Result Areas
Functioned as Unit Head in biomass energy plant of 15 MW capacity near Muktsar in Punjab; delivered transformational solutions encompassing a wide spectrum of functions including plant operation, fuel procurement and overall administration
Administered project operatons for 02 Nos biomass power projects in Punjab each of 20 MW, erection and commissioning including DPR approval, PPA and various NOCs form govt. agency and thereafter engineering procurement and erection-commissioning the plants
Coordinated with Maintenance and Engineering Personnel for overall benefit of the Plant; executed day-to-day activities and requirement regarding plant maintenance and shutdown listing
Dealt with emergencies and unplanned problems; identified and reported any fault or compliance concerns and took urgent corrective actions
Ensured all the startup check lists and required documents are filled and signed as per the procedure before any planned startup and shutdown
Ensured complete compliance to sustainable & safety and environment policy & procedures; provided necessary inputs to upgrade already existing standards
Conceptualized and implemented impressive cost saving techniques and headed significant modifications for accomplishing reduction in expenditures thereby, ensuring adherence to the budgetary norms
Liaison & Coordination: Worked closely with stakeholders while keeping them informed of progress and issues to manage expectations on all requirements and deliverables
May’10 – Jun’16
Gammon Infrastructure Projects Ltd., Nasik as General Manager- Projects (Energy & Urban Infra)
Key Result Areas:
Spearheaded activities entailing conception of the project and selection of equipments for capacity of 30 MW Thermal Power Plant (biomass cum coal based ) having high pressure boiler of 160 TPH ( 110 Kg /cm2,540 centigrade), commissioned the plant in Jul’15 and there after Plant operation .
Oct’02 – May’10
Kalpa- Taru Power Transmission Ltd., Sriganganagar, Rajasthan as Deputy General Manager-Plant Head
Key Result Areas:
Executed tendering, procurement, erection, commissioning of 7.8 MW thermal power plants (fully automatic DCS controlled) at Sriganganagar (Raj.)
Liaised and coordinated with govt. bodies, arranged all statutory clearances
Acted as in-charge of plant overseeing power generation, distribution and overall operation & maintenance activities (electrical, mechanical & instrumentation) of power plant and its utilities equipment along with biomass fuel procurement & its logistics
Exported full power to Rajasthan electricity board under power purchase agreement through 33 KV transmission line
Apr’02 – Oct’02
Bhushan Steel & Strips Ltd., Ghaziabad, U.P. as Senior Manager-Electrical
Key Result Areas:
Executed operation and maintenance of electrical power generation and distribution network of all electrical equipment having connected load of 20 MW for all over the plants
Maintained 2x12 MW MAN, B&W DG sets and its utilities equipment, 220/11 KV switch yard, 40 MVA power transformer, distribution transformers & HT /LT motors, etc.
Apr’1995 – Mar’02
Jubilant Organosys Chemicals Ltd., Moradabad, UP as Manager -Electrical
Key Result Areas:
Carried out equipment procurement, erection testing and commissioning of 3X4 MW DG Captive Power Plant, 12 MW thermal power plant (Coal Based) and 132/33 KV substation
Acted as In-charge of power generation and distribution in all electrical sections having connected load of 25 MW and power generation unit of 35 MW
Jan’90 – Apr’95
Modi Alkalies & Chemicals Ltd., Alwar, Rajasthan Plant Superintendent / Deputy Chief Engineer – Electrical
Key results area :
Overll maintenance of electrical equipmenst of the entire plant including 90 KA rectifier Transfomer and 132 KV switchyard .
May’84 – Jan’90
Hindustan Paper Corporation Ltd., (A Govt. Enterprise), Nowgang, Assam
Graduate Engineer–Trainee/ Assistant Engineer/Plant Engineer
Associated withelectrical activities of project erection and commissioning of 2x15 MW power plant and pulp and paper mill.
Functional Expertise
Erection, testing, commisioning, operation and maintenance of:
o132kv/33 kv, 33kv/11 kv switch yard and its sub-station including 33 kv transmission line
o40 mva power transformer, 90 ka transformer and various distribution transformers upto 4.5 mva
oMotor control centre, power control system, lt / ht panels, i.e., 415 volts, 3.3 kv, 6.60kv,11kv, 33 kv consisting of acb, mocb, vcb & sf-6 breakers of abb, siemens, crompton, voltas & jyoti ma
oCaptive power plants consisting of 1000 kva kirloskar, 1450 KVA skoda, 3x 4 mw wartsila & 12 mw man b& w dg sets and its prtotection, excitation and control system
o2. 5 mw back pressure turbine,5.6 mw extraction cum condensing tg sets (make- triveni ), 7.8 mw tg set (extraction cum condensing, make- (shin-nippon ) . 12 mw TG set siemens make,30 MW Green Field biomass Power Project .
oUpto 35 ton high pressure ( 66 kg/cm2 ) multi-fuel boiler (thermax make) & its esp system ( abb make) ), 90tph, 87 kg/cm2 fbc boiler etc.
oGreen field projects of biomassed based Power Plant having capacity 80 TPH. 90 Kg/cm2 boiler & 20 MW Siemens TG sets.
Key Highlights:
Erection & commissioning of:
o33 Kv lines, 132/33 kv switch-yard, substation having 25 h panels
o3x 4 MW DG power plant
o12.0 MW thermal power plant (coal based )
oGreen field power projects of bio mass based 7. 8.0 MW, 8.0 MW, 12 MW, 20MW & 30 MW thermal power plants and there after overall operation & maintenance of the plants alongwith fuel procurement & its logistic
Concept to commissioning of biomass based /coal based thermal power plants with strong techo - commercial knowledge
Personal Details
Date of Birth: 23rd May, 1961
Languages Known: English, Hindi
Address: Lucknow,U.P.
Strategist, planner & implementer with extensive experience in managing entire Project excecution and plant operations with specialization in Strategy Planning, Project Management; targeting strategic assignments in Plant Operations, Strategy Planning, Project Management in Power Sector preferably in NCR, North Inda
Collaborator
Problem Solving
Analytical & Logical Thinking
Customer Oriented
B.E. (Electrical), M.M.M. Engineering College, Gorakhpur (UP)
1983
2005
Post Graduate Diploma in Business Management, All India Institute of Management Studies, Chennai
2009
Certified Energy Manager, Bureau of Energy Efficiency, Govt. of India
Jul’16 – Jan’23
Sukhbir Agro Energy Ltd., Punjab as Chief Executive Officer
May’10 – Jun’16
Gammon Infrastructure Projects Ltd., Ahmednagar,Maharastra as General Manager – Projects
as Geas General Manager
Oct’02 – May’10
Kalpa- Taru Power Transmission Ltd., Sriganganagar, (Rajasthan) as Deputy General Manager-Plant Head
Apr’02 – Oct’02
Bhushan Steel &Strips Ltd., Ghaziabad, U.P. as Senior Manager-Electrical
Apr’1995 – Mar’02