Post Job Free

Asme resumes in Iran

Sign in
Search for: Jobs   Resumes


Resume alert Resumes 21 - 27 of 27

Mechanical Engineer Engineering

Iran
... Other Activity: Design and calculation of storage tank and pressure vessel as per ASME Sec. VIII and pressure vessel hand book (MOSS) and PV Elite soft ware (calculate thickness). Calculation of the pipe thickness related to corrosion allowance and ... - 2015 May 05

Power Plant Mechanical Engineer

Iran
... • In depth experience, in Preparing and Designing of all technical documents and detail drawings for construction and installation of 20,000 m3 fix or floating roof storage tanks according to API and pressure vessel according to ASME Sec. VIII. (Fix ... - 2014 Aug 23

Manager Mechanical

Iran
... ASME, JASO, …) Ability to work with steel keys Familiar with Tensile Testing Machines, VMS, CMM, Hardness Measurment Machine Design Mechanical Mechanism Skill in designing and drawing parts (2d and 3d) with software (Catia, Solidworks and Autocad) ... - 2014 Aug 15

Engineer Mechanical

Iran
... Registered to: World Pump, HI, ASME & ….. • Work Experience HAADI (my private company) Tech. Consultant & Contractor in Oil & Gas Industries 1 Position: Managing Director, Tehran, Iran October 2007 up to Now Accomplishments Due to my technical ... - 2014 Jan 16

Engineering Project

Iran
... Araabi, Concurrent learning of Task and attention in the decision space,IEEE/ASME Conference on Advanced Intelligent Mechatronics, pp. 1353-1358, Singapore, 14-17 July 2009. [8] Narges Noori, Majid Nili, Maryam S. Mirian, Babak Araabi, Speeding up ... - 2013 Nov 20

Engineer Project

Tehrān, Tehran, Iran
... In-depth knowledge of ASME SEC IX & II, API 5L and 1104 . Fluent in MS Office, Internet Explorer, and Steel Key software . Strong desire to learn new skills and contribute as an active member of professional team SPECIAL WORK PROJECT (2005) ... - 2013 Oct 19

Engineer Project

Iran
... Such as change in design code(ASME Sec VIII -Div 01 to Div. 02) in some data sheets which leads to decreasing weight and thickness in equipment, consequently, diminishes cost and time schedule on equipment delivery. Strategic Management . ... - 2013 Sep 17
Previous 1 2 3