|
Resume alert |
Resumes 41 - 50 of 1840 |
Washington, DC
... Material Planner / Logistics Quality at BMW Group January 2004 — December 2005 During my time as a Material Planner and Logistics Quality specialist at BMW Group, I was responsible for material steering during the start-up phase at the Leipzig plant ...
- Mar 13
Washington, DC
... • Set meetings with client to communicate the development fixes and changes and testing progress at every phase of the project. In short, aim to deliver bug free product/software to Client. Client Visits: • International On - Site Travel: Saudi ...
- Mar 10
Bethesda, MD
... Phase II Modification of the Supreme Court of the United States: worked with contractors doing daily inspections acted as liaison for the government and the court. Phase II of MWA Expansion of RED Line: inspection of underground drilling equipment, ...
- Mar 08
New Market, MD
... Converted Phase Cut Controls to DDC, changes hundreds of hot water valves, actuators, PM steam traps, pipes, and coils, and multiple control panels. This building is a critical system due to the life of the animals. 2014 Keswick Multi-Care, ...
- Mar 06
Rockville, MD
... 2005, Dreamweaver Java Framework Sprint boot 1.5.33, Struts 2.0, Spring 4.0, Hibernate 4.2 Modeling Tools UML, MS Visio 2007, ER Modeling Web Application Servers Apache Tomcat, JBOSS 4.0/4.2, IIS 7.0, IIS 6.0 Version Controls Git, TFS, VSS, TORTOISE ...
- Mar 06
Hungerford Towne, MD, 20850
... • Developed the REST Microservices using Java JDK 1.8, Scala, on IntelliJ platform by gathering the knowledge of previous phase resources and integration with Oracle. • Involved in various phases of SDLC as requirement gathering, modeling, analysis, ...
- Mar 06
Manassas, VA
... Exploring the existing application and prepared test scenarios Working of customers created tickets using MS Dynamics 360 tool on L1 and L2 related tickets and tracking them to closure Involved in implementing each phase of SDLC and Coordinated in ...
- Mar 05
Herndon, VA
... Metro began building its rail system in 1969, acquired four regional bus systems in 1973, and began operating the first phase of Metrorail in 1976. Today, Metrorail serves 91 stations and has 117 miles of track. Metrobus serves the nation's capital ...
- Mar 05
Haymarket, VA
... ●Implemented Two Phase comit using Spring, ActiveMQ, JBossTS, Atomikos. ●Replaced RMI server with Web Services using Axis-2 ●Involved in RedHat Linux administration. ●Followed MVC pattern using Struts frame work, Spring web mvc and JSF ●Designed, ...
- Mar 04
Vienna, VA
... ● Partner with Legal Counsel on ER and litigation cases; advise senior leadership on HR strategy, accountability, risk, ... direct supervision of the HR Director, while being an active change agent during the transitional phase within the HR unit. ...
- Mar 03