Lawrenceville, GA
... WFI (wireless facilities, Inc) April 2000 - September 2000 Senior RF Engineer Sprint PCS CDMA Technology Project, Oklahoma City and Tulsa, Oklahoma Responsible for designing capacity, and quality sites (Phase 3, and Phase 4). Performed site ...
- May 02
Ahmedabad, Gujarat, India
... Ahmedabad, Gujarat (India) Project – Package – C2 & C3 for Gandhinagar, Ahmedabad Metro Rail Project Phase- ll Working on Gentry Erection Drawing, Launching Girder Erection Drawing Preparation Pile, Pile Cap, Pier, Pier cap, Portal-Beam, Segment, I ...
- May 02
Canada
... PROJECT WORKS Title: NIOSOMES Duration: 6months Title: A topical micro-emulsion formulation of Finasteride with construction of phase diagram. Duration: 6months CURRICULLAM VITAE EXPERIENCE Worked at Sreyass Hospital, Edavanakad, Kochi since 1st ...
- May 02
Al Dafna, Qatar
... of payment certificates Major Projects involved: • Masdar City Development (Post Contract) • Future Schools Programme Phase-1 & 2 (Post Contract) • Zayed Military City (Buildings & Infrastructure Works - Pre & Post Contract) • Explosive Storage ...
- May 02
Al Dafna, Qatar
B/*** SONAM AAKASH, NEW GOLDEN NEST, PHASE *, MIRA BHAYANDAR ROAD, THANE, 401107 M: +918********* Qatar No: +974********. Email id: ad5e6t@r.postjobfree.com. LinkedIn: http://linkedin.com/in/bhooshanmaindan-426735b7 Summary Results-driven Senior ...
- May 02
Hamad Town, Northern Governorate, Bahrain
... - Can perform in all aspects of the Concept phase to build the design concept. - Keeps abreast of technological developments such as new codes, new design concepts, computer applications, drafting methods, etc. - Manage change Management, RFI ...
- May 02
Sonipat, Haryana, India
... M.Tech Project: Measurement of three- phase power supply system using MAXIM chip MAXQ3183 by SPI communication with the microcontroller P89CV51RD2. Setup working hardware for the energy metering for the measurement of power, voltage, current, and ...
- May 02
Milton, ON, Canada
... Provided design and construction management of MEP works for phases 1A of MDD project from start to finish, Phase 1A included large numbers of commercial and heritage buildings. Provide construction and commissioning management of MEP works for part ...
- May 02
Mumbai, Maharashtra, India
... ●Making MCX reports,FIMMDA Reports,OI Trends,OI analysis ●Worked in Generating MVT Installer and Setup to different version from 9.0.0.0 to 9.0.1.7 Assignments Involved in every migration, Design, Development and Testing phase of the Project. ...
- May 02
Jeddah, Mecca, Saudi Arabia
... • Supervise & monitoring to arrange all the day to day requirements during installation phase at site & arrange the NCR’s rectification in coordination with all the suppliers & site installation team. • Supervise & monitoring arrange all the day to ...
- May 02