|
Resume alert |
Resumes 91 - 100 of 108 |
Cuttack, OD, India
... at PPT (Paradip Port Trust) in MCHP (Mechanized Coal Handling Plant) at the field of Operation & Maintenance of Conveyor System from DEC-2015 to till now. Worked as safety supervisor in ESSAR PROECTS (I) LTD. from NOV 2014 to NOV- 2015 at Bhilai, ...
- 2018 Feb 12
Bhubaneswar, OD, India
... 66.78 % 1st 2004 Projects Undertaken [1] Title : Summer Internship Project (SIP) in “MAHANADI COAL FIELDS LTD, SAMBALPUR H.Q for tenure of 45days for the topic (FINANCIAL STATEMENT ANALYSIS)” Company : MAHANADI COAL FIELDS LTD, SAMBALPUR H.Q ...
- 2017 Dec 20
Bhubaneswar, OD, India
... EXPERIENCE:- Working at GLOBAL COAL & MINING PVT. LTD. jharsuguda, odisha. Operation and Maintenance Coal Handling Plant. Maintenance work of material handling system i.e. Belt conveyor, reciprocating feeder, double roll crusher and Vibratory screen ...
- 2017 Dec 19
Cuttack, OD, India
... PROJECT REPORT: A Technical Report On Coal Based Dri Processes Using Rotary Kiln And Its Uses. PROFESSIONAL QUALIFICATION: 2004 Completed One Year certificate course in Steel Making (NIIST) from National Institute of Secondary steel Technology, ...
- 2017 Dec 11
Bhubaneswar, OD, India
... Inplant Training at: • Nalco smelter plant angul odisha and cesu bhubaneswar dvcc Achievments : • How to pulverised the coal in plant dcvdc Curricular Activities : • Studied details about transformer • Generation,transmission and distribution of ...
- 2017 Nov 14
Bhubaneswar, OD, India
... HP 1103 COAL PULVERISER. PRIMARY AIR FAN (AXIAL TYPE: PAF 20/11.2-2). BOILER:1*800MW N.T.P.C-B.H.E.L GADARWARA. ENVOLVES IN THE EXECUTION AND QUALITY INSPECTION OF ROTATING EQUIPMENT : LUNJSTORM AIR –PRE HEATRE (BISECTOR TYPE). HP 1103 PULVERISER. ...
- 2017 Oct 25
Bhubaneswar, OD, India
... INDUSTRIAL EXPERIENCE Worked As Instrumentation Field Engineer in DM Plant & Coal Handling Plant in Sreeshara Manpower Limited, Working for A joint venture of NTPC (NATIONAL THERMAL POWER CORPORATION) & RIL(RELIANCE INDUSTRIES LIMIETD). Currently ...
- 2017 Oct 24
Bhubaneswar, OD, India
... LAPANGA, (ODISHA) – ADITYA BIRLA MATERIAL HANDLING SYSTEM (CHP) – VIZAG, (ANDHRA PRADESH) – ADANI GROUP ASH HANDLING PLANT RAJPURA(PUNJAB) (2*700 MW) – NABHA POWER LIMITED: COAL HANDLING PLANT, BLOCK-B,(MADHYA PRADESH) – NORTHEN COAL FIELD LTD. ...
- 2017 Oct 23
Bhubaneswar, OD, India
... •Installation of weight feeder (Iron, Feed Coal, Injection Coal) up to 10 Ton capacity. •Maintenance of Motor with drive Panel & Starter (DOL, RDOL, Star-Delta). •Manages the plant’s operations, maintenance, projects and departments including spare ...
- 2017 Sep 11
Bhubaneswar, OD, India
... AVH CHEMICALS PVT LTD is a coal tara company.The project is running at Sambalpur,Odisha. Designation:- Mechanical Engineer Duration: - 7th September 2014 to till date. Job Responsibilities:- Construction and Office work Erection of Structures i.e. ...
- 2017 Sep 08