|
Resume alert |
Resumes 11 - 20 of 26 |
Sahibzada Ajit Singh Nagar, CH, India
... HYDROGEN & CO2 Gas filling in Turbine Generator. Monitoring operation of PT-RO-DM Operation. WORKED WITH FOLLOWING INSTRUMENTS - Well experienced and knowledge in using various instruments such as Bomb Spectrometer, pH meter, Conductivity meter, ORP ...
- 2018 May 30
Chandigarh, CH, India
... 3 years I.T.I.in Turbine Operator trade from I.T.I. Kaithal. EXPERIENCE . I have worked as apprentice Turbine Operator in Co. Operative Sugar Mills Kaithal from 15/4/2006 to 14/04/2009 . 2.5 mw power plant. . I have worked with M/S RUCHIRA PAPER ...
- 2017 Oct 11
Sahibzada Ajit Singh Nagar, PB, India
... Engineering & Technology, Jaipur, RJ HVAC Systems February 2016 Green India Technos, Barbarshah, Srinagar, J&K Study of Turbine & Gates April-May 2014 USHP-II, Kangan, Gandarbal, J&K Service and Maintenance of Automobiles May 2012 Hyundai Workshop ...
- 2017 Jun 22
Chandigarh, CH, India
... LEAP 1A/1C Turbine Centre Frame Design Turbine Centre Frame design of an Aero Engine to meet Stiffness, Buckling & life requirements. Optimization of design to meet Six Sigma requirements. Design of Seals at the Forward & Aft of the Turbine Centre ...
- 2016 Jan 27
Sahibzada Ajit Singh Nagar, PB, India
... Passed X class from CBSE in 2008, Internship and training: BHEL, Haridwar ( Jan 15,2014 – July 15,2014) oSummer training at Bharat Heavy Electrical Ltd, Haridwar in Steam Turbine Manufacturing Shop. oStudy the manufacturing processes used in making ...
- 2015 Aug 03
Chandigarh, CH, India
... Project topic:Steam turbine Member of SAEINDIA and currently working on one of its project. STRENGTHS In possession of a pleasant personality complemented with a caring and responsible attitude Self-motivated,focused and dedicated. Good managerial ...
- 2014 Oct 17
Chandigarh, CH, India
... Erection and commissioning of Boiler and Turbine in Balco CPP - 2 (4 X 135 MW). . Commissioning & maintenance of CVL Waste Heat Recovery Boiler 3 X 10.5 TPH Boiler,1 x 35 TPH AFBC Boiler and 1x 12 MW Siemens Turbine at Anjani steels ltd . . ...
- 2014 Apr 11
Chandigarh, CH, India
... 6 weeks training at panipat thermal power station Under turbine & generator unit (HPGCL) during B Tech studies. . 6 months training at panipat thermal power station. . 3 months training at shubham flexible packaging machines, Ballabgard,fridabad. ...
- 2014 Feb 20
Chandigarh, CH, India
... • Summer Training (6th Sem) from Bajaj Motors Limited, Rudrapur in 2012 • Seminar on Vertical axis wind turbine, • Visited Loco railway lko in 2011. • Visited cold storage at Kanpur highway road in 2011. Academic project • Title: -Autonomous Flight ...
- 2014 Jan 14
Chandigarh, CH, India
... Convent H.S.School (MP Board) 63 PCM 2008 10th National Convent H.S.School (MP Board) 64 All compulsory 2006 Industrial Training: • Organization: Bharat Heavy Electricals Limited, Haridwar (U.K) Duration: 1 Month Title: Turbine Fabrication Sector. ...
- 2013 Aug 14