AGYEKUM FRANKLIN BEDIAKO
P.O.Box SE ***, Suame-Kumasi, Ghana 233 | (0-244-***-*** | *******.********@*****.***
Profile and Objective
A person who displays positive attitude, enthusiasm, integrity and commitment to produce results
A person who is very flexible and very adaptable to other cultures
A very creative, innovative and a technical problem solver with good writing and presentation skills
Work Experience
2008 to Date: MTN (Ghana)
Current Position RAN Support Engineer
Area of Expertise AXE 810(Ericsson BSC)
V900R011ENGC00SPC750 (Huawei BSC)
CPP (RNC 3810/3820)
AXE 810/ Huawei BSC Job Profile
• Implementation of BSC rehoming from a monolithic MSC to a softswitch with MGW as an STP
• Implementation of BSC rehoming from one softwitch to another softswitch through multiple MGW
• Implementation of BSC rehoming from softwitch to an MSS in pool with multiple MGW as an STP or as a virtual MSC
• Implementation of BSC rehoming from MSS in pool to a Blade Cluster in pool with multiple MGW as an STP or as a virtual MSC
• Implementation of GB over IP.
• Implementation of GB over Frame Relay and its device expansion
• Gb over Frame Relay migration to IP
• Data switching node (PCU) installation(as main or extensions),integration and it’s expansion
• PCU boards (RPP) expansion and integration
• Preparing data transcript for the integration of sites using Abis over TDM.
• Preparing data transcript for the integration of sites using Abis over IP.
• Implementation of Abis Optimization for Ericsson BSCs
• Ericsson and Huawei RBS Cabinets swap data scripting and implementation
• Installation and integration of PGW for Abis optimization
• Assisting Field engineers remotely in solving site issues in improving network(cell) availability
• Assisting field engineers remotely in defining and testing alarms for sites integration
• Resolving all APZ/APT alarms using OPI in ALEX.
• Migration of Sites from one BSC to another BSC using the BSM and CNA in the OSS.
• Solving all MOs faults on sites
• BSC GEM,eGEM and GDM integration and expansion
• ET155,CSPD1.0,CSPD2.0,GARPE,SCB,XDB integration
• ATM/TDM signaling implementation towards MGW as an STP or a virtual MGW
• A-interface expansion implementation with in-depth knowledge in CICs alignment
• Effecting recommended changes on the BSC raised by various departments
• Integration of new Transcoder/CSPB Boards with its corresponding RP in BSCs.
• Configuration/testing of new Transcoder Pools in BSCs
• Integration of new GARPE-2 Boards with its corresponding RP in BSCs.
• Integration of new ET155 Boards with its corresponding RP in BSCs.
• Integration of new TRH Boards with its corresponding RP in BSCs.
• Loading/activation of licenses.
• Raw data transfer set-ups to remote server from the BSC
• Troubleshooting and resolving all data/counters transfer issues on the BSC
• General network problems troubleshooting and resolution
• CP and IPA/AGM/IAM software upgrades for BSCs and RBS
• Excellent knowledge of the network topology, its traffic handling capabilities and traffic characteristics
Key Projects and Accomplishment – AXE 810 BSC/ Huawei BSC
Client - MTN, Ghana - The biggest mobile operator in Ghana.
• Project Details – Implemented EDGE on all cells in the MTN network. A total of 4000 cells.
• Project Details – During PH19.6 of MTN Ghana ,I prepare scripts and implemented the migration of four (4 ) Ericsson BSCs (in Cape Coast and Accra) to a different stand-alone MSS and two (2) Huawei BSCs (in Kumasi)as pre-requisite to PH22
• Project Details – During Ph22 of the MTN Ghana Project I migrated Over 200 Sites from some the BSCs in Independence Avenue to All the in the new Switch Centre at Tetteh Quarshie.
• Project Details – PH22 of MTN Ghana, I re-homed eight (8) Ericsson and ten (10) Huawei respectively BSCs from one MSS in POOL to blade cluster in POOL(2 clusters)
• Successful installation, integration and expansion of GEMs for five (5) BSCs
• Successful installation, integration and expansion for ten(10) GDM-PCUs as extensions for (8 )Ericsson BSCs
• I have implemented STS configuration for counters transfer for eleven (11) Ericsson BSCs during PH22.
• I have implemented the migration of Gb over frame relay to IP for ten(10) Ericsson BSCs during Phase 22 preparations
RNC (3810/3820)
KEY PROJECT AND ACCOMPLISHMENT RNC
RNC integration project (3810)
Client: MTN Ghana –
• Integrated 2 RNCs with total 400 Sites
• Implemented IUB ,IUR and IU Ps over IP.
• Upgraded the RNC from P6 to P7 and NodeBs from P6 to P7
• Project Details –Hardware expansion on the RNC. January 2011
Job Role:
• Integrating RNC with MGW with ETMF4 Configuration
• Integrating IP based control plane with MSS Via MPBN
• Integrating IP based control and user plane with SGSN via MPBN Network using ETMFG Board.
• RNC start up and integration on all interfaces (northbound and southbound)
• Integrating NODE B with IUB over IP Using ETMFX via MPBN.
• Implementing MSCPOOL for the RNC’s using M3UA Association(MSS/Blade Cluster)
• Preparing CCR-tool Scripts for RNC and Node B
• Preparing Mo Script for RNC and Node B
• Loading XML scripts using common Explorer.
• Preparing the Utrancell relation’s according to the Excel sheet using XML tool or Excel macro tool.
• Commissioning and integrating new RNC with latest software P6, P7 and W10.
• Implementing IUB over IP for the NodeB using MPBN.
• Implementing IP network for the MSC and SGSN.
• Implemented the 14.4 Mbps Download Speed with 10E1 Capacity (iub over Ip).
• Implemented the 25 Mbps Download Speed with HSPA Solution (iub over Ip).
• Adding New Sites in the RNC using OSS RAN explorer-ARW, BCT.
• Configuring E1 Path, O&M Access, Site equipment and External Alarm configuration in Ericsson
• 3G Cabinets (3206, 3216, 3202, 3401, and 3303).
• Analyzing the Missing relations and Adding the GSM Relation for IRAT.
• Delete and reconfiguring the sites Using Moshell Commands releasing from site hang.
• Restarting the ETM Board to release the IMA Hang.
• Enabling UETR, CTR and Scanner for Call traces.
• Adding IUB Links, ATM Ports.
• Adding UTRAN, GSM Relation for NodeB Sites using RAN Explorer and Common Explorer.
• Changing Scrambling codes for the NodeB Sites from the RNC.
• Loading XML Script Files in RNC, NodeB.
• Preparing XML Script files for Ericsson 3G Cabinets (3206, 3202, 3401, and 3303).
• Formatting GPB (Hard Disk), loading P3, P4, P5 and P6 Software’s.
• Replacing GPB (MP) Card in RNC&RBS Cabinet.
• Upgrading software’s P3 to P4 to P5 to P6 to P7 (HSPA) Technology.
• Making Backup CV’s and Creating New CV’s using moshell and Element Manager(GUI)
• Communicate with various departments e.g. ERICSSON RAN Manager, Optimization Team, in resolution of Technical problem during Migration or any Upgrading activity in RAN NODES.
• Being innovative in suggesting new ideas on installation procedure matters, which benefit the customer more.
• Excellent knowledge of the network topology, its traffic handling capabilities and traffic characteristics.
• Expanding the RNC with additional Subracks.
• Adding two carriers on the RBS 3206.
• Implementing 64qam overall the networks
• RNC Migration moving RNC from one Switch to Other Switch.
Software Experience
Element Manager
WINFIOL REMEDY
Citrix (OSS) FACTS
MOSHELL ALEX
AMOS M2000/CME
WIRESHARK Huawei LMT
CYGWIN
Hardware Experience
CPP platform [RNC3810/3820]
AXE 810 platform with APG40 (C2/C4)/APG43 and APZ 212 33/33C/55 BSC]
V900R011ENGC00SPC750 (Huawei BSC)
Personal Data
Sex: Male
Occupation: RAN Support Engineer, 2009-till present, MTN GHANA
Core Network Planning Engineer (BSS biased), 2008-2009, MTN GHANA
Network Planning Engineer, 2007-2008, Kasapa Telecom, now Espresso
Marital Status: Married
Language: English
License and Travel Experience: Holder of a valid Ghanaian Driver’s license
Holder of a valid Ghanaian Passport with travel experiences to United States of America and Nigeria
Education
Kwame Nkrumah University of Science and Technology, Kumasi-Ghana
Bsc. Electrical/Electronic Engineering, Second Class (Hons) Division, June 2007
Prempeh College, Kumasi-Ghana
Senior Secondary School Certification Examination, SSSCE 2000
Adventist Junior Secondary School,Kumasi-Ghana
Basic Education Certification Examination,1997
Professional Trainings Attended
GSM SYSTEM SURVEY (6TH OCT, 2008 – 9TH OCT, 2008) BY ERICSSON
GSM BSC OPERATION (17TH NOV, 2008 – 21ST NOV, 2008) BY ERICSSON
APG40 OPERATION AND MAINTENANCE (9th MAR, 2010-12thMAR, 2010) BY ERICSSON
APG40 INSTALLATION AND CONFIGURATION (15th MAR, 2010-16th MAR, 2010) BY ERICSSON
APG40 RECOVERY PROCEDURES (17th MAR, 2010-19th MAR, 2010) BY ERICSSON
GSM BSS 07 STATISTICS INTRODUCTION (15th Sept-17th Sept 2010) BY ERICSSON
APG43 DELTA (20th Sept, 2010) BY ERICSSON
APG43 DELTA O&M (21st Sept-24th Sept, 2010) BY ERICSSON
APZ 212 55 OPERATION AND MAINTENANCE (18TH Oct, 2010 – 20TH Oct, 2010) BY ERICSSON
GSM RBS 6102/6201 MAINTENANCE (13TH Dec, 2010 – 14th dec, 2010)
WCDMA OPERATION AND MAINTENANCE BY ERICSSON
WCDMA CONFIGURATION BY ERICSSON
References
Samuel Orji
Core Network Support Team Lead
Tel:024*******
Email: *****@***.***.**
Francis Ocran
Radio Access Support Team Lead
Tel:024*******
Email: *******@***.***.**