Post Job Free
Sign in

Project Manager Construction

Location:
Lincoln, CA, 95648
Salary:
90,000
Posted:
May 09, 2011

Contact this candidate

Resume:

Professional Profile

Career Objective

Seeking employment as a Construction Superintendent specializing in Public Works/Infrastructure/Water / Wastewater Treatment projects

Personal Profile

I am a dedicated team player who believes that safety is paramount to job productivity. I have been the superintendent of water / wastewater treatment plant construction ranging in value of $2 Million to $55 Million. I believe the key to project success is open communication between the Client, Construction Manager, and the Contractor.

Skills Summary

• Safety Program Implementation

• Material Coordination and receiving

• Job Scheduling

• Proficient in Viewpoint 6.0

• Experienced in using Suretrack 3.0 • Monthly Billing

• Daily Work Reports

• Change Order Documentation

• Proficient in Microsoft Office

Professional Experience

Superintendent GSE Construction Co., 6950 Preston Ave., Livermore, CA 94551, 925-***-****.

• West Sacramento Main Drain Pump Station, $8.3 Million, January 2010 – April 2011.

o 2000 cubic yard cast in place concrete pump station.

o Installation of two 80,000 gpm vertical turbine pumps.

o Installation of two 650 hp diesel motor drives.

o MCC control systems.

o Concrete mortar lined welded steel discharge piping and associated yard piping.

• Eldorado Hills WWTP Phase IIIb Expansion, NCPWA Project of the Year – Large Facilities, $55 Million, January 2008 – January 2010.

o New Facilities include 4M gallon Equalization System, Headworks Facility, Biofilter, Sludge Digester, Gas Flare, UV System, DAF System, MCC and SCADA Controls, all associated Yard Piping, and Administration Building. Refurbished two sedimentation basins, added two additional tertiary filters, excavated and concrete lined the retention basins.

• Vacaville Irrigation District Monte Vista Pump Station, $2.2 Million, June 2007 – January 2008.

o Demolition and replace existing MCC Controls and Pump Station Piping. Added new Standby Generator and upgraded transformer.

• EBMUD Sedimentation Basin Rehabilitation, $3.8 Million, April 2006 – July 2006.

o Demolition and replacement of Chain and Flight System.

o Installation of new Control Gates and concrete resurfacing of Sedimentation Basins.

• Vallejo Sanitation District Odor Control Project, $6.2 Million, April 2005 – April 2006.

o Demolition and conversion of existing Sludge Tank to Biofilter. New equipment installation included FRP and HDPE Ductwork, Blowers, and Biotower Domes, Plant Site Waste Pump Station and associated Yard Piping, new Liquefied Natural Gas Backup Generator Conversion. Retrofit of Aeration Basin to include new Aerators and Fabric Odor Control Cover.

Foreman, SJ Amoroso Construction Co., Redwood Shores, CA October 1998 – September 2004.

• Lincoln WWTP, Value $53 Million, November 2002 – September 2004.

• Brentwood WWTP, Value $35 Million, October 2000 – November 2001.

• San Mateo Train Station, Value $20 Million, April 1999 – October 2000.

• San Jose Museum of Technology, Value $20 Million, October 1998 – April 1999.

United States Navy Seabees, Reserve, Chief Builder

• Assistant Training Chief, First Naval Construction Regiment, October 2009 – Present.

o Responsible for implementing the Command Seabee Combat Warfare Training Program.

• Platoon Chief, Naval Mobile Construction Battalion 18, October 2008 – October 2009.

o Responsible for the oversight of a 45 Man Platoon in weekend and annual training; including Construction Work Assignments, Procurement of Materials, Personnel Evaluations, and required Operational Training.

• Operations Chief, Naval Mobile Construction Battalion 18, Detachment 1018, May 2007 – September 2008.

o Responsible for planning and estimating Military Base Support Construction Projects, scheduling work crews and materials, preparing Situation Reports for Command Headquarters.

• Charlie Company Chief, Task Force Sierra, Balad, Iraq, September 2006 – April 2007.

o Responsible for the planning and implementation of Construction Support Projects for United States Special Operations Command. Project Scopes included concrete Airfields, Office Spaces, and Troop Housing.

Education

HUMBOLDT STATE UNIVERSITY – Arcata, CA

Bachelors of Science, Wildlife Biology, 1993

References

Mike Thalhammer, Senior Engineer, PSOMAS Engineering 916-***-****

Scott Loewen, Senior Inspector, HDR, Inc. 916-***-****

Richard Radoycis, Project Manager, PSOMAS Engineering 916-***-****

Tom Solari, Project Manager, San Joaquin Electric E-mail: *****@******************.***



Contact this candidate