Born : *TH May **** Amsterdam, the Netherlands
Nationality : Dutch
Status : Married
Languages : Excellent Dutch & English and basic Vietnamese
Address: 15E Lac Long Quan
Vung Tau – ward 8
S.R. of Viet Nam
Contact Details : ***.*****@*****.***
Mobile : +84-918****** (Roaming)
___________________________________________________________________________________________
Experience Summary:
Please note for ease of reference only experience relative to the position has been included.
Successfully managed numerous projects in the offshore/onshore engineering industry over the last 28 years and gained valuable insight in the different facets of fabrication, planning, estimating, organizing and commissioning.
Comprehensive knowledge of production and maintenance practices and procedures within the industry. Comprehensive knowledge of PTW procedures & offshore safety systems.
Working knowledge of Process Plant, Wellheads, Wireline & Drilling.
Experience in interfacing with Operations, Maintenance, Engineering & HES departments to ensure company’s requirements and standards are maintained.
Excellent working knowledge of conditions in both on and Off Shore environments.
Am considered a flexible person with good leadership skills and getting results often under difficult circumstances.
Computer literacy: Microsoft office including Project and Primavera P3
Offshore Experience
Position: PTT/Bechtel Client Site Representative
Installation and Commissioning of 42” Sub-Sea pipeline - 160klm
Installation of Risers
Position: PTT/Bechtel Client Representative
Fabrication and Load out of 5 Topside Modules.
Fabrication of Jacket and Bridges + Load out.
Installation of PRP Jacket, Topsides, Tripods and Bridges – Gulf of Thailand
Hook-Up and Commissioning CSR – PRP Topsides
Position: Petrovietnam Project Manager/Client Site Representative
Installation of WHP Ruby “B” Production Facility and installation of an 8” Sub- Sea Pipeline Offshore Viet Nam
Position: Project Engineer
Leak detection program of subsea 94 Km 14” pipeline Balal to Lavan Island - Iran for NOCI
Position: Hook-Up Manager
Installations of Jacket, Float over Topsides 7000 ton, riser - Hook Up, Commissioning i.e. Stag Central Production Facility, located off Dampier, Western Australia for Apache Pty Ltd
Position: CGS Superintendent
Preparation for tow out, set down, ballasting and riser hook – up of concrete gravity structures, Bream “B” and Tuna West. Location Bass Strait for ESSO Australia
Position: Barge/Construction Superintendent (CSR)
Installation of WHP Mono Pod
Installation of Riser
Widuri”H”
Location Java Sea – Indonesia for CNOOC
Other major projects include management of shutdowns on the North Rankin “Alpha”, including total flare lines change out, re-tubing of all well heads-flow lines, installation of flow lines, Hook-up of Wanea-Cossack and Goodwin “A” risers, Caisson installations, repair to fire pump caissons Gas re-injection package and general maintenance work for Woodside Petroleum Australia
Onshore Experience including fabrication for offshore projects
Position: Project Manager
• Transport and Installation of Jacket, WHP Topsides and Sub-Sea pipeline for Nu-Coastal (Thailand) Ltd
• Location - Singapore
Position: Site Manager
• Hydro-Electric Power Plant
Location Dhi Ninh – Viet Nam for EVN
Position: Subcontract Administrator.
• Nam Con Son Project LPG plant and onshore methane, condensate, butane and Propane pipelines.
Long Hai – Viet Nam for BP
Position: Lead Pipeline Commissioning Engineer
• Commissioning of 1200 km LPG Gas Pipeline – Jamnagar to Loni for GAIL
Location: India.
Position: QA- Engineering Manager
• Setting up of ISO 9002 for Petrovietnam subsidiary (PTSC) module fabricator.
• Location: Viet Nam
Position: Project Manager
• Installation of Compressor Pumping stations Dampier to Bunbury main gas pipeline for Woodside Petroleum Australia
• Location: Western Australia
Position: Superintendent.
• Construction of Train 3 for Woodside Petroleum.
• Construction of Liquefying plant including Jetty Head, Loading Arms, underground fire mains, etc.
• Location: Karratha, Western Australia
My experiences within the Oil and Gas industry encompass all aspects and I am familiar with the Budgets, Planning and Time factors that are required.
A full Employment History is available and references can be provided on request.
Education and Training
1964/1965 : Werkspoor NV Amsterdam
• theoretical and practical schooling in machine tool use, fitting and welding
1966/1968 : Apprenticeship- Fitter
1968-1970 : Bemetal Certificate of Proficiency in
• Structural Steel Fitting
• Apparatus Building and Sheet metal Welding
1985 : National Safety Council of Australia
• Occupational Health and Safety
1990 : VOHSC approved workplace First Aid Course
• First Aid course Level 2
1990 : High Pressure Gas and Oil Fire Training
• Fire Training
1990 : Ferntree Computer Corporation
• Profs Course
1992 : Job Safety Analysis Training
1993 : Solas Training
HUET with EBS
SMTC Global – Exp. 14/11/2012
Education and Training Continued:
1995 : Ameron Fiberglas Pipe System
• Fibre class Piping Assembly and Installation
1996 : Selantic
• Selantic Evacuation System SES-2A
1998 : Work Safe
• Dogman’s Ticket: DG
• Scaffolding Tickets: SA
• Ticket No: W 0963098
2008 : HUET with EBS
SMTC Global – Exp. 14/11/2012
Employment History
April 2012 to Present
Position : Offshore Construction Manager
Employer : Momentum Engineering.
Client : Dragon Oil
Location : Dubai - Turkmenistan
Responsibilities : install and commission: 6”, 10”, 12”, 14”, 18” and 20” infield subsea pipelines, spools and risers, subsea valves, topside piping, platform structural modifications, and electrical and instrumentation equipment.
March 2012 to April 2012
Position : Installation Engineer
Employer : Vietnam Glo-coating Engineering Sdn., Bhd.
Location : Phnom Penh, Cambodia
Responsibilities : Floating out and installation of DN1600mm x 58mt Glo-coated river inlet pipe.
Aug 2010 to March 2011
Position : Test/Pre-Com Engineer
Employer : Leighton Asia
Location : Bluewater Jurong – Singapore
Responsibilities : Functional and Hydro Testing and Pre-Commissioning of PLEM and CALM Buoy
May2010 to July 2010
Position : Lead Pipeline Engineer
Employer : PetroVietnam Engineering
Location : Saigon - Vietnam
Responsibilities : Design of Nam Con Son 2 Pipeline
: Design of Block B&52 – O Mon Gas Pipeline
Position : Barge Superintendent (N/S) (“Beau Geste”)
Employer : Leighton Contractors
Client : Brunei Economic Development Board
Location : Brunei
Responsibilities : Installation of 6x Anchor, Chain (Load test 180 ton each) SPM and Pipeline crossings.
March 2009 to Sep 2009
Position : Site Manager
Employer : LAC Construction Company
Location : Song Vang – Viet Nam
Responsibilities : Site Co-ordination and Management
: Song Vang Hydro Electric Project
August 2008 to Feb 2009
Position : Project Manager/Installation Manager/Sub Sea Testing Engineer
Employer : EMAS Offshore Production and Construction
Location : Singapore
Responsibilities : Installation of 2 Jackets and WHP Topsides
: Installation of Guide Frame and Hook-Up of Auruothai FPSO
: Installation of 6x Anchor
: PLEM installation
: CALM Buoy Installation
: 6” interconnecting subsea pipeline
May 2008 to July 2008
Position : Offshore Construction Superintendent
Employer : Roc Oil (Bohai) Company
Location : Zhao Dong Field – Bohai - China
Responsibilities : Piling Template
Piling
Load out
Production Platform Installation 1200 tonne Drilling Platform Installation
Sept 2007 to May 2008
Position : Client Site Representative
Employer : Bechtel International (PMC)
Client : PTT & TTM (Thailand)
Location : Gulf of Thailand – Erawan Field
Responsibilities : PRP Platform (Second Campaign)
Completion of Carry Over Works
Commissioning
Bring First Gas onto Platform
March 2007 to May 2007
Position : Barge Supervisor (Leighton “Stealth”)
Employer : Leighton India
Client : Bharat Petroleum
Location : Cochin - India
Responsibilities : Installation 48” Sub-Sea Pipeline - 19klm – Shore approach.
Nov 2006 to March 2007
Position : Client Site Representative (Seamac 1)
Employer : Bechtel International (PMC)
Client : PTT & TTM (Thailand)
Location : Gulf of Thailand – Erawan Field
Responsibilities : PRP Platform Plem to CKR Platform
Installation 42” Sub-Sea Pipeline - 160klm
Riser Installation
Commissioning
Feb 2006 to Nov 2006
Position : Client Site Representative (“Castoro Otto” & “Support Station 3”)
Employer : Bechtel International (PMC)
Client : PTT (Thailand)
Location : Gulf of Thailand – Erawan Field
Responsibilities : PRP Platform
Installation of 8 leg Jacket (launch and piling)
Topsides 5x Modules total 12.000 tonnes
Tripods – Flare and Pedestrian – 300 ton each
Bridges – 200 ton each
Hook-Up
Commissioning
Fabrication of 5 Topside modules + Load out (SMOE – Singapore)
Fabrication of Jacket + Load out (Batam – Indonesia) McDermott Yard
Jan 2005 to Feb 2006
Position : Project Manager /Client Site Representative (Viet Nam)
Employer : PTSC Production Services (PMC)
Client : Petronas Carigali
Location : Vung Tau City – Viet Nam
Responsibilities : WHP Ruby”B” platform
Installation of 4 leg Jacket (1800 ton – lift)
Pre-Drilling Template (800 ton)
Topside – Single Module 2000 ton
HUC
Oct 2003 to Dec 2004
Position : Manager (Viet Nam)
Employer : OIS-MOC Joint Venture
Location : Vung Tau City – Viet Nam
August 2003 to Oct 2003
Position : Site Manager
Employer : LAC Ltd
Location : Phu My Power stations - Vietnam
Responsibilities : Site Co-Ordination for Civils and Mechanical
April 2003 to May 2003
Position : Barge/Construction Superintendent (CSR - SS3)
Employer : CNOOC SES Ltd, Jakarta
Location : Java Sea, Widuri Field
Responsibilities : Complement of Barge
Installation and Hook-Up of WHP Mono-Pod Widuri – “H”
Hook-Up of 18” Riser
Sept 2001 to Nov 2002
Position : Subcontract Administrator
Location : BP - Dinh Co Gas Terminal (Nam Con Son)
Responsibilities : Administrating subcontracts
March 2001 to Aug 2001
Position : Project Engineer
Employer : Contract Work
Location : Iran
Responsibilities : Leak Detection project Ball to Lavin Island
Load out Barge and DSV with Heavy Equipment
Operating HP pumps
Leak detection of pipeline
Pigging of complete pipeline
Sept 2000 to Dec 2000
Position : Lead Pipeline Commissioning Engineer
Employer : KOPP Pipeline Services
Client : GAIL - India
Location : Jamnagar – Loin (Indiça)
Responsibilities : Commissioning of 1200km LPG Pipeline
Pre-Commissioning Checks
Pigging of complete pipeline
Line-Up of pumping stations
Scheduling and Planning
Aug 1998 to May 1999
Position : QA – Engineering Manager
Employer : Tramatsuco-Franklin
Location : Vung Tau – Viet Nam
Responsibilities : ISO 9002
Setting up of ISO 9002
Writing/submitting procedures
Training of Staff
Scheduling and Planning
Aug 1997 to May 1998
Position : Hook-Up manager
Employer : Bouygues OffShore Group
Client : Apache
Location : Perth – Dampier
Responsibilities : Installation Jacket, Floatover Topsides (7000 ton) Hook-Up & Commissioning Stag
Platform
Installed 60nm of Dampier coast, Western Australia
Setting up and acceptance of tenders
Liaise with sub contractors
Welding procedures
Employment hire
Setting up equipment
Scheduling and Planning
Off shore coordination of all Installation and Hook-up phases
April 1997 to Aug 1997
Position : Subsea Wireline Supervisor
Employer : Rockwater Div Halliburton
Location : Vung Tau Viet Nam
Responsibilities : Trip one (six weeks)
Maintenance of all sub-sea wire line equipment
Re-certification of all rigging equipment
Re-certification of all pressure equipment such as Bops wire line gate valves, lubricators hydraulic hoses, etc...
Trip Two (Five weeks)
Stack up trial with full crew complement
Feb 1997 – April 1997
Position : Project Manager
Employer : HVAC Process Engineering PTY Ltd
Location : Perth-Gin Gin – Kalbarri Compressor Stations on
Dampier to Bunbury pipe line
Responsibilities : Installation of new compressors stations
Technical support from Perth office
On site liaison with client.
Purchasing
Budgets & Planning
Sept 1996 –Dec 1996
Position : Concrete Gravity Structure Superintendent
Employer : Dawson Rockwater Div Brown & Root
Client : ESSO Australia
Location : Port Kembla-Bass Strait, Bream”B” and West Tuna
Responsibilities : Reporting to Marine Superintendent
CGS Ballasting
Level control and Air Cushion operations.
After disconnection of tow vessels, execution of final CGS Ballasting, grouting, sub-sea and topside completion.
Sept 1990-March 1996
Position : Offshore Fields Contracts Supervisor
Employer : Woodside Offshore Petroleum
Location : Karratha North Rankin ‘Alpha’
Responsibilities : Setting up & acceptance of tenders up to $3 mil
Supervision of onshore fabrication and offshore installation
Aug 1989-1990
Position : Offshore Construction Supervisor
Employer : Euro Pacific Technologies Pty Ltd
Location : Bass Strait Oil Platforms
Responsibilities : Supervision of 25 Employees
General project installation
Requisition of equipment and material
Installation of gas turbine ‘Tuna’ platform
Administration
Sept 1988-Aug 1989
Position : Site Manager / Area Supervisor
Employer : Contract Work
Location : Altona Petro-Chemical Complex
Responsibilities : Controlling 8 supervisors and 160 employees
Refurbishment of burnt out crude heater
Workshop fabrication, onsite installation of APC refinery
Major shutdown /revamp
July 1987-Aug 1989
Position : Superintendent
Employer : Contract Work
Location : Karratha-North West Shelf Project
Responsibilities : Control of 6 supervisors and 60 employees
Pipe-rack and pipe-work from operational domgas unit to Power generation units
Installation of structural steel, pipe-work and column internals
Feb 1986-Dec 1986
Position : Area Manager
Employer : Contract Work
Location : Botany-Sydney
Responsibilities : Control of 4 supervisors and 80 employees
Installation of food processing equipment and A/C
Installation of air conditioning duct work
June 1984-Feb1986
Position : Senior Offshore Supervisor
Employer : Contract Work
Location : Bass Strait Oil Platforms
Responsibilities : Control of 4 supervisors and 50 employees
General project work
Installation of open drains caisson, pipe work and mechanical equipment
Administration
Union negotiation with authority to act on specific matters
June 1983-June 1984
Position : Superintendent
Employer : Contract Work
Location : Port Bynthon – Whyalla
Santas Liquefaction Project – Value $250mil
Responsibilities : Control of 12 supervisors and 240 employees
Installation of underground fire mains
Pipe-works to tanks
Pipe-work and load-out facilities as an integral part of the jetty
June 1982-June 1983
Position : Supervisor
Employer : Contract Work
Location : Geraldton WA
North Rankin Alpha Project – Value $33mil
Responsibilities : Control of Thirty employees
Installation of pipe-work in wellhead modules
Install mechanical equipment
Administration
Assuring full trace ability
June 1981-June 1982
Position : Supervisor
Employer : Contract Work
Location : Altona Petro-Chemical Complex
Responsibilities : Control and supervision of thirty five employees
Construction and maintenance
P.R.A
A.P.C
D.O.W Chemicals
Union Carbide Refinery
Rebuilding of fire damaged Shell Refinery at Geelong
June 1980-July 1980
Position : Senior Supervisor
Employer : Wescon Pty Ltd
Location : Singapore
Shell Refinery-Hydro Cracker value $400mil
Responsibilities : Supervision of sub-contractors with 200 employees
Installation of pipe-work and mechanical equipment
Full trace-ability
Aug 1978-May 1980
Position : Supervisor
Location : I.C.I. Laverton Vic, Corvic No 2 Plant
Responsibilities : Control of 50 employees
Installation of pipe-work and equipment
New construction – Reaction plant
Nov 1977-Aug 1978
Position : Junior Supervisor
Employer : John Holland Construction Pty Ltd
Location : Snuggery S.A. Sub Power Station Installation
Responsible for : In conjunction with manager
Twenty employees
Installation of turbines, alternators and auxiliary equipment
Administration
Aug 1976-Nov 1977
Position : Maintenance Fitter
Employer : Inter-Continental Hotels NV Okura Hotel
Location : Amsterdam Holland
Responsible for : General maintenance of all hotel equipment
Air conditioners, boilers, plumbing and kitchen equipment
Dec 1973-Aug 1976
Position : Maintenance Fitter
Employer : Apcel Paper Mills Pty Ltd
Location : Millicent S.A.
Responsible for : General maintenance
Wood yard, chemical plant and Paper convertor areas
Oct 1971-Dec 1973
Position : Argon Arc Welder
Employer : Thomas Walker Pty Ltd
Location : Millicent S.A. Apcel Paper Mill Extension
Responsible for : Installation and welding of stainless steel pipework
May 1988-Aug 1971
Position : Boilermaker
Employer : Werkspoor N.V
Location : Amsterdam – Holland
Responsible for : Fabrication
Turbines, Heat Exchangers, Ships Motors, Sugar Mills and Atomic Reactors