Post Job Free
Sign in

Manager, CSR, Superintendet

Location:
United States
Posted:
June 11, 2012

Contact this candidate

Resume:

Born : *TH May **** Amsterdam, the Netherlands

Nationality : Dutch

Status : Married

Languages : Excellent Dutch & English and basic Vietnamese

Address: 15E Lac Long Quan

Vung Tau – ward 8

S.R. of Viet Nam

Contact Details : ***.*****@*****.***

Mobile : +84-918****** (Roaming)

___________________________________________________________________________________________

Experience Summary:

Please note for ease of reference only experience relative to the position has been included.

Successfully managed numerous projects in the offshore/onshore engineering industry over the last 28 years and gained valuable insight in the different facets of fabrication, planning, estimating, organizing and commissioning.

Comprehensive knowledge of production and maintenance practices and procedures within the industry. Comprehensive knowledge of PTW procedures & offshore safety systems.

Working knowledge of Process Plant, Wellheads, Wireline & Drilling.

Experience in interfacing with Operations, Maintenance, Engineering & HES departments to ensure company’s requirements and standards are maintained.

Excellent working knowledge of conditions in both on and Off Shore environments.

Am considered a flexible person with good leadership skills and getting results often under difficult circumstances.

Computer literacy: Microsoft office including Project and Primavera P3

Offshore Experience

Position: PTT/Bechtel Client Site Representative

Installation and Commissioning of 42” Sub-Sea pipeline - 160klm

Installation of Risers

Position: PTT/Bechtel Client Representative

Fabrication and Load out of 5 Topside Modules.

Fabrication of Jacket and Bridges + Load out.

Installation of PRP Jacket, Topsides, Tripods and Bridges – Gulf of Thailand

Hook-Up and Commissioning CSR – PRP Topsides

Position: Petrovietnam Project Manager/Client Site Representative

Installation of WHP Ruby “B” Production Facility and installation of an 8” Sub- Sea Pipeline Offshore Viet Nam

Position: Project Engineer

Leak detection program of subsea 94 Km 14” pipeline Balal to Lavan Island - Iran for NOCI

Position: Hook-Up Manager

Installations of Jacket, Float over Topsides 7000 ton, riser - Hook Up, Commissioning i.e. Stag Central Production Facility, located off Dampier, Western Australia for Apache Pty Ltd

Position: CGS Superintendent

Preparation for tow out, set down, ballasting and riser hook – up of concrete gravity structures, Bream “B” and Tuna West. Location Bass Strait for ESSO Australia

Position: Barge/Construction Superintendent (CSR)

Installation of WHP Mono Pod

Installation of Riser

Widuri”H”

Location Java Sea – Indonesia for CNOOC

Other major projects include management of shutdowns on the North Rankin “Alpha”, including total flare lines change out, re-tubing of all well heads-flow lines, installation of flow lines, Hook-up of Wanea-Cossack and Goodwin “A” risers, Caisson installations, repair to fire pump caissons Gas re-injection package and general maintenance work for Woodside Petroleum Australia

Onshore Experience including fabrication for offshore projects

Position: Project Manager

• Transport and Installation of Jacket, WHP Topsides and Sub-Sea pipeline for Nu-Coastal (Thailand) Ltd

• Location - Singapore

Position: Site Manager

• Hydro-Electric Power Plant

Location Dhi Ninh – Viet Nam for EVN

Position: Subcontract Administrator.

• Nam Con Son Project LPG plant and onshore methane, condensate, butane and Propane pipelines.

Long Hai – Viet Nam for BP

Position: Lead Pipeline Commissioning Engineer

• Commissioning of 1200 km LPG Gas Pipeline – Jamnagar to Loni for GAIL

Location: India.

Position: QA- Engineering Manager

• Setting up of ISO 9002 for Petrovietnam subsidiary (PTSC) module fabricator.

• Location: Viet Nam

Position: Project Manager

• Installation of Compressor Pumping stations Dampier to Bunbury main gas pipeline for Woodside Petroleum Australia

• Location: Western Australia

Position: Superintendent.

• Construction of Train 3 for Woodside Petroleum.

• Construction of Liquefying plant including Jetty Head, Loading Arms, underground fire mains, etc.

• Location: Karratha, Western Australia

My experiences within the Oil and Gas industry encompass all aspects and I am familiar with the Budgets, Planning and Time factors that are required.

A full Employment History is available and references can be provided on request.

Education and Training

1964/1965 : Werkspoor NV Amsterdam

• theoretical and practical schooling in machine tool use, fitting and welding

1966/1968 : Apprenticeship- Fitter

1968-1970 : Bemetal Certificate of Proficiency in

• Structural Steel Fitting

• Apparatus Building and Sheet metal Welding

1985 : National Safety Council of Australia

• Occupational Health and Safety

1990 : VOHSC approved workplace First Aid Course

• First Aid course Level 2

1990 : High Pressure Gas and Oil Fire Training

• Fire Training

1990 : Ferntree Computer Corporation

• Profs Course

1992 : Job Safety Analysis Training

1993 : Solas Training

HUET with EBS

SMTC Global – Exp. 14/11/2012

Education and Training Continued:

1995 : Ameron Fiberglas Pipe System

• Fibre class Piping Assembly and Installation

1996 : Selantic

• Selantic Evacuation System SES-2A

1998 : Work Safe

• Dogman’s Ticket: DG

• Scaffolding Tickets: SA

• Ticket No: W 0963098

2008 : HUET with EBS

SMTC Global – Exp. 14/11/2012

Employment History

April 2012 to Present

Position : Offshore Construction Manager

Employer : Momentum Engineering.

Client : Dragon Oil

Location : Dubai - Turkmenistan

Responsibilities : install and commission: 6”, 10”, 12”, 14”, 18” and 20” infield subsea pipelines, spools and risers, subsea valves, topside piping, platform structural modifications, and electrical and instrumentation equipment.

March 2012 to April 2012

Position : Installation Engineer

Employer : Vietnam Glo-coating Engineering Sdn., Bhd.

Location : Phnom Penh, Cambodia

Responsibilities : Floating out and installation of DN1600mm x 58mt Glo-coated river inlet pipe.

Aug 2010 to March 2011

Position : Test/Pre-Com Engineer

Employer : Leighton Asia

Location : Bluewater Jurong – Singapore

Responsibilities : Functional and Hydro Testing and Pre-Commissioning of PLEM and CALM Buoy

May2010 to July 2010

Position : Lead Pipeline Engineer

Employer : PetroVietnam Engineering

Location : Saigon - Vietnam

Responsibilities : Design of Nam Con Son 2 Pipeline

: Design of Block B&52 – O Mon Gas Pipeline

Position : Barge Superintendent (N/S) (“Beau Geste”)

Employer : Leighton Contractors

Client : Brunei Economic Development Board

Location : Brunei

Responsibilities : Installation of 6x Anchor, Chain (Load test 180 ton each) SPM and Pipeline crossings.

March 2009 to Sep 2009

Position : Site Manager

Employer : LAC Construction Company

Location : Song Vang – Viet Nam

Responsibilities : Site Co-ordination and Management

: Song Vang Hydro Electric Project

August 2008 to Feb 2009

Position : Project Manager/Installation Manager/Sub Sea Testing Engineer

Employer : EMAS Offshore Production and Construction

Location : Singapore

Responsibilities : Installation of 2 Jackets and WHP Topsides

: Installation of Guide Frame and Hook-Up of Auruothai FPSO

: Installation of 6x Anchor

: PLEM installation

: CALM Buoy Installation

: 6” interconnecting subsea pipeline

May 2008 to July 2008

Position : Offshore Construction Superintendent

Employer : Roc Oil (Bohai) Company

Location : Zhao Dong Field – Bohai - China

Responsibilities : Piling Template

Piling

Load out

Production Platform Installation 1200 tonne Drilling Platform Installation

Sept 2007 to May 2008

Position : Client Site Representative

Employer : Bechtel International (PMC)

Client : PTT & TTM (Thailand)

Location : Gulf of Thailand – Erawan Field

Responsibilities : PRP Platform (Second Campaign)

Completion of Carry Over Works

Commissioning

Bring First Gas onto Platform

March 2007 to May 2007

Position : Barge Supervisor (Leighton “Stealth”)

Employer : Leighton India

Client : Bharat Petroleum

Location : Cochin - India

Responsibilities : Installation 48” Sub-Sea Pipeline - 19klm – Shore approach.

Nov 2006 to March 2007

Position : Client Site Representative (Seamac 1)

Employer : Bechtel International (PMC)

Client : PTT & TTM (Thailand)

Location : Gulf of Thailand – Erawan Field

Responsibilities : PRP Platform Plem to CKR Platform

Installation 42” Sub-Sea Pipeline - 160klm

Riser Installation

Commissioning

Feb 2006 to Nov 2006

Position : Client Site Representative (“Castoro Otto” & “Support Station 3”)

Employer : Bechtel International (PMC)

Client : PTT (Thailand)

Location : Gulf of Thailand – Erawan Field

Responsibilities : PRP Platform

Installation of 8 leg Jacket (launch and piling)

Topsides 5x Modules total 12.000 tonnes

Tripods – Flare and Pedestrian – 300 ton each

Bridges – 200 ton each

Hook-Up

Commissioning

Fabrication of 5 Topside modules + Load out (SMOE – Singapore)

Fabrication of Jacket + Load out (Batam – Indonesia) McDermott Yard

Jan 2005 to Feb 2006

Position : Project Manager /Client Site Representative (Viet Nam)

Employer : PTSC Production Services (PMC)

Client : Petronas Carigali

Location : Vung Tau City – Viet Nam

Responsibilities : WHP Ruby”B” platform

Installation of 4 leg Jacket (1800 ton – lift)

Pre-Drilling Template (800 ton)

Topside – Single Module 2000 ton

HUC

Oct 2003 to Dec 2004

Position : Manager (Viet Nam)

Employer : OIS-MOC Joint Venture

Location : Vung Tau City – Viet Nam

August 2003 to Oct 2003

Position : Site Manager

Employer : LAC Ltd

Location : Phu My Power stations - Vietnam

Responsibilities : Site Co-Ordination for Civils and Mechanical

April 2003 to May 2003

Position : Barge/Construction Superintendent (CSR - SS3)

Employer : CNOOC SES Ltd, Jakarta

Location : Java Sea, Widuri Field

Responsibilities : Complement of Barge

Installation and Hook-Up of WHP Mono-Pod Widuri – “H”

Hook-Up of 18” Riser

Sept 2001 to Nov 2002

Position : Subcontract Administrator

Location : BP - Dinh Co Gas Terminal (Nam Con Son)

Responsibilities : Administrating subcontracts

March 2001 to Aug 2001

Position : Project Engineer

Employer : Contract Work

Location : Iran

Responsibilities : Leak Detection project Ball to Lavin Island

Load out Barge and DSV with Heavy Equipment

Operating HP pumps

Leak detection of pipeline

Pigging of complete pipeline

Sept 2000 to Dec 2000

Position : Lead Pipeline Commissioning Engineer

Employer : KOPP Pipeline Services

Client : GAIL - India

Location : Jamnagar – Loin (Indiça)

Responsibilities : Commissioning of 1200km LPG Pipeline

Pre-Commissioning Checks

Pigging of complete pipeline

Line-Up of pumping stations

Scheduling and Planning

Aug 1998 to May 1999

Position : QA – Engineering Manager

Employer : Tramatsuco-Franklin

Location : Vung Tau – Viet Nam

Responsibilities : ISO 9002

Setting up of ISO 9002

Writing/submitting procedures

Training of Staff

Scheduling and Planning

Aug 1997 to May 1998

Position : Hook-Up manager

Employer : Bouygues OffShore Group

Client : Apache

Location : Perth – Dampier

Responsibilities : Installation Jacket, Floatover Topsides (7000 ton) Hook-Up & Commissioning Stag

Platform

Installed 60nm of Dampier coast, Western Australia

Setting up and acceptance of tenders

Liaise with sub contractors

Welding procedures

Employment hire

Setting up equipment

Scheduling and Planning

Off shore coordination of all Installation and Hook-up phases

April 1997 to Aug 1997

Position : Subsea Wireline Supervisor

Employer : Rockwater Div Halliburton

Location : Vung Tau Viet Nam

Responsibilities : Trip one (six weeks)

Maintenance of all sub-sea wire line equipment

Re-certification of all rigging equipment

Re-certification of all pressure equipment such as Bops wire line gate valves, lubricators hydraulic hoses, etc...

Trip Two (Five weeks)

Stack up trial with full crew complement

Feb 1997 – April 1997

Position : Project Manager

Employer : HVAC Process Engineering PTY Ltd

Location : Perth-Gin Gin – Kalbarri Compressor Stations on

Dampier to Bunbury pipe line

Responsibilities : Installation of new compressors stations

Technical support from Perth office

On site liaison with client.

Purchasing

Budgets & Planning

Sept 1996 –Dec 1996

Position : Concrete Gravity Structure Superintendent

Employer : Dawson Rockwater Div Brown & Root

Client : ESSO Australia

Location : Port Kembla-Bass Strait, Bream”B” and West Tuna

Responsibilities : Reporting to Marine Superintendent

CGS Ballasting

Level control and Air Cushion operations.

After disconnection of tow vessels, execution of final CGS Ballasting, grouting, sub-sea and topside completion.

Sept 1990-March 1996

Position : Offshore Fields Contracts Supervisor

Employer : Woodside Offshore Petroleum

Location : Karratha North Rankin ‘Alpha’

Responsibilities : Setting up & acceptance of tenders up to $3 mil

Supervision of onshore fabrication and offshore installation

Aug 1989-1990

Position : Offshore Construction Supervisor

Employer : Euro Pacific Technologies Pty Ltd

Location : Bass Strait Oil Platforms

Responsibilities : Supervision of 25 Employees

General project installation

Requisition of equipment and material

Installation of gas turbine ‘Tuna’ platform

Administration

Sept 1988-Aug 1989

Position : Site Manager / Area Supervisor

Employer : Contract Work

Location : Altona Petro-Chemical Complex

Responsibilities : Controlling 8 supervisors and 160 employees

Refurbishment of burnt out crude heater

Workshop fabrication, onsite installation of APC refinery

Major shutdown /revamp

July 1987-Aug 1989

Position : Superintendent

Employer : Contract Work

Location : Karratha-North West Shelf Project

Responsibilities : Control of 6 supervisors and 60 employees

Pipe-rack and pipe-work from operational domgas unit to Power generation units

Installation of structural steel, pipe-work and column internals

Feb 1986-Dec 1986

Position : Area Manager

Employer : Contract Work

Location : Botany-Sydney

Responsibilities : Control of 4 supervisors and 80 employees

Installation of food processing equipment and A/C

Installation of air conditioning duct work

June 1984-Feb1986

Position : Senior Offshore Supervisor

Employer : Contract Work

Location : Bass Strait Oil Platforms

Responsibilities : Control of 4 supervisors and 50 employees

General project work

Installation of open drains caisson, pipe work and mechanical equipment

Administration

Union negotiation with authority to act on specific matters

June 1983-June 1984

Position : Superintendent

Employer : Contract Work

Location : Port Bynthon – Whyalla

Santas Liquefaction Project – Value $250mil

Responsibilities : Control of 12 supervisors and 240 employees

Installation of underground fire mains

Pipe-works to tanks

Pipe-work and load-out facilities as an integral part of the jetty

June 1982-June 1983

Position : Supervisor

Employer : Contract Work

Location : Geraldton WA

North Rankin Alpha Project – Value $33mil

Responsibilities : Control of Thirty employees

Installation of pipe-work in wellhead modules

Install mechanical equipment

Administration

Assuring full trace ability

June 1981-June 1982

Position : Supervisor

Employer : Contract Work

Location : Altona Petro-Chemical Complex

Responsibilities : Control and supervision of thirty five employees

Construction and maintenance

P.R.A

A.P.C

D.O.W Chemicals

Union Carbide Refinery

Rebuilding of fire damaged Shell Refinery at Geelong

June 1980-July 1980

Position : Senior Supervisor

Employer : Wescon Pty Ltd

Location : Singapore

Shell Refinery-Hydro Cracker value $400mil

Responsibilities : Supervision of sub-contractors with 200 employees

Installation of pipe-work and mechanical equipment

Full trace-ability

Aug 1978-May 1980

Position : Supervisor

Location : I.C.I. Laverton Vic, Corvic No 2 Plant

Responsibilities : Control of 50 employees

Installation of pipe-work and equipment

New construction – Reaction plant

Nov 1977-Aug 1978

Position : Junior Supervisor

Employer : John Holland Construction Pty Ltd

Location : Snuggery S.A. Sub Power Station Installation

Responsible for : In conjunction with manager

Twenty employees

Installation of turbines, alternators and auxiliary equipment

Administration

Aug 1976-Nov 1977

Position : Maintenance Fitter

Employer : Inter-Continental Hotels NV Okura Hotel

Location : Amsterdam Holland

Responsible for : General maintenance of all hotel equipment

Air conditioners, boilers, plumbing and kitchen equipment

Dec 1973-Aug 1976

Position : Maintenance Fitter

Employer : Apcel Paper Mills Pty Ltd

Location : Millicent S.A.

Responsible for : General maintenance

Wood yard, chemical plant and Paper convertor areas

Oct 1971-Dec 1973

Position : Argon Arc Welder

Employer : Thomas Walker Pty Ltd

Location : Millicent S.A. Apcel Paper Mill Extension

Responsible for : Installation and welding of stainless steel pipework

May 1988-Aug 1971

Position : Boilermaker

Employer : Werkspoor N.V

Location : Amsterdam – Holland

Responsible for : Fabrication

Turbines, Heat Exchangers, Ships Motors, Sugar Mills and Atomic Reactors



Contact this candidate