Better copy of my resume available upon request.
Gary M. Silinsky
League City, Tx 77573
**********@*****.***
________________________________________
Objective…
Seeking a Millwright, Millwright Supervision position.
Background…
17 years Precision Millwright, Millwright Foreman, General Foreman, and Superintendent. I’ve completed H.S.E Leadership Training, Site Supervisory Training, CSIM Careers for success program, as well as several safety programs, 24 hr. Hazwoper training, 30 hours OSHA & 24 hours MSHA. I’ve also completed the ABC program, Wheels of Learning, Served my apprenticeship at Utah State Collage through Utah Carpenters/Millwright Local 184
Highlights and Qualifications…
~Passport for international travel
~N.C.C.E.R PLUS field/written
~T.W.I.C. card
~Current Safety Council
~I have all my tools in excess
~Outstanding Leadership
~Communicate openly and professionally
Firsthand Experience…
Alignments: Indicators/Lasers. Rim and Face, Reverse, A Line, Double Reverse, Lasers, both Optialign Plus and Smart, as well as Rotoalign Plus lasers. I’ve taken a class to run the Rotoalign Ultra. Can run Transit levels as well as Precision levels including K&E ect.
Pumps & Motors: Set bases on layout, elevate, and level base skids, run pipe stress, sell for final alignment, post maintenance, complete overhauls, replace seals, packing, bearings, etc…
Compressors/Blowers: Set compressors on layout, elevate, level, and align all components, run pipe stress, set seals, run oil flush, complete overhauls, Reciprocating, multistage rotary split case, centrifugal, rotary screw, etc…
Turbines: Both big & small, gas/steam, Set bases on layout, elevate, and level base skids, run pipe stress, Align, final alignment, post maintenance, and complete overhauls. I have extensive experience with Westinghouse, Coppus, Elliot, Terry, Skinner, GE, Mitsubishi, etc…
Conveyor: Installed over 13 miles
ID/FD Fans, Fin Fans: Several, plus all related components
Extruder/pelletizer: Set several, installed tracks, aligned, rebuild, overhaul’s, ect…
Work History…
03/10-08/10: S&B Engineers and Constructers, Tyler Tx. Deleck Oil Refinery
Millwright General Foreman
~New Construction: Over the millwright department where we were installing all related equipment for a new unit for Deleck oil refinery, including, setting of equipment, all pipe stress, all alignments, up to startup. Equipment included pumps, cooling tower pumps, exchangers, vessels, towers, and several fin fans. Finished contract to completion.
12/09-03/10: Mundy/Austin, Evalca/Bassill, Both Plastic plants Millwright
~Maintenance: Millwright in both facility’s, where I repaired and overhauled several pieces of equipment including, extruder’s, pelletizers, cutters, compressors, Sun dyne pumps and many other related equipment.
5/09-11/09: Fluor, Pointe-a-Pierre, Trinidad, World GTL, Gas to liquids plant
Superintendent II O&M
~New construction: I was over 8 subcontractors for several crafts including Electrical, Instrumentation, Pipefitting, Millwright, Painters/Insulation and general labor. I was in charge of mechanical Installation, Commissioning and Start Up of various machines including Pumps, Turbines, Compressors, Lube oil, glycol and cooling water systems. I finished my contract to full completion, ahead of schedule to the satisfaction of both my employer and client.
8/08-3/09: Zachary Construction, Baytown, Tx. NRG Cedar Bayou Power plant
Millwright
~New Construction: Co Gen plant, I installed the Seamen’s steam turbine, shot all elevations with the P-Level, got center line with a piano wire, installed bearings, took all measurement of blades, seals, diaphragms, ect. Set rotor, aligned shafts for shaft alignment, Set up for pre steam and commissioning.
2/08-8/08: Aker Solutions, Texas City, Tx. Praxair, Gas Plant
Millwright Foreman
~New Construction: I was in charge of up to 12 millwright at one time, I coordinated my crew on the days tasks, while keeping a safe working environment, I kept Aker and Praxair updated on what and where we where on schedule while maintaining that schedule. I installed two compressors while there, a Man Turbo, split case, ADD motor driven, and a Cameron reciprocating hydrogen compressor, both lube oil systems and various pumps.
10/07-2/08: Cajun, Deer Park, Tx. DOW Polyurethane plant
Millwright
~New Construction: I built a Polyurethane plant for DOW chemical. I installed, set tracks, aligned three extruders/pelletizers., installed six air movers plus filters to elevation, set, aligned, and ran pipe stress on all pumps. Shot all elevations in with a transit level.
7/06-7/07: P2S, Texas City, Tx. BP/Amico PS3B Oil Refinery
Millwright General Foreman
~BP turnaround: In charge of all the old equipment and replacing it with new equipment. I coordinated my foreman with the tasks for that day, ordered all needed equipment and material , kept up with all the necessary paperwork, plus stayed in contact with BP’s rep’s to keep them updates and kept everyone on the same page. I completed H.S.E Leadership Training, Site Supervisory Training, plus 30 hours OSHA.
2/06-7/06: L-CON/Shaw, Houston, Tx. Valero Oil Refinery
Millwright Leadman
~New construction: Set up pumps, compressors, and other various equipment
3/05-2/06: Various shutdowns throughout TX/LA Areas, Refinery’s
~Millwright, Maintenance, Millwright Foreman etc.
4/04-3/05: Infinity, Texas City/Clear Lake DOW, Chemical plant
Maintenance Millwright
~Set seals for pumps, repacking pumps, overhaul variety of machinery including: Pumps, turbines, compressors, agitators, atomizers, rotary valves, gear boxes, mixers and general preventative maintenance on machinery
12/03-4/04: Lindi B.O.C., Texas City, Hydrogen Unit, Praxair
Millwright Foreman
~Installed ID/FD fans, set several pumps/pipe stress, set 4 compressors including all seals, oil flush, commissioning, and start up, working directly with clients
9/03-12/03: Certified Technical Services, Deer Park, Clean Harbors, Waste Incinerary
Millwright
~Installed 2 ID fans in a precipitator unit plus all related components. Completed 24 hour Hazwoper training
6/03-9/03: Performance, Free Port, Texas, DOW
Millwright Foreman
~In charge of 26 pumps, dealt directly with client
1/03-3/03: Austin-North of College Station, Texas, Power Plant
Millwright
~Turbine shutdown-tore down, rebuilt & aligned Westinghouse steam turbine
9/02-1/03: Flour Daniels, Texas City, Texas BP Amico, Oil Refinery
Millwright
~Set several pumps, set compressors, set reactors and exchangers
3/02-8/02: Duke Flour, Sandersville, Georgia, Co.Gen
Millwright Foreman
~In charge of 4 G.E. 7E’s simple cycle
10/01-3/02: Flour Daniels, Louisville, Kentucky, LG & E Power Plant
Boilermaker/Millwright
~Demoed existing duct work, reinstalled new duct work, installed new expansion joints, set louvers, laid out and installed air actuators
9/00-10/01: Flour Daniels, Jacksonville, Florida, JEA Power Plant
Millwright
~Extensive work inside lime stone crusher building, built 13 miles of conveyor, built 2 stacker reclaimers, plus 6 ID fans
4/00-9/00: Flour Daniels, Chocolate Bayou, Texas, Solutia Chemical Plant
Millwright
~Set pumps and motors and various other equipment
1/00-4/00: T.I.C., Mithalioneia, Texas T.X.I. Cement Plant
Millwright
~Set up stacker reclimer for product storage
1995-1998
Millwright helper
~Various new construction projects
1993-1995: Utah Carpenters Union, Salt Lake City, Utah
Form Carpenter
~Built 3 projects for Oakland construction, Union apprenticeship program from Utah
State Collage where I was taught Survey, Elevations, and Centerlines, Plumb Level Square, Welding along with many other skills.
1990-1993: Hillside Tire II. Salt Lake City, Utah
Tire buster to Mechanic
~ Worked up from Tire buster to Lead tire buster, to a State Certified vehicle inspector, as well as an auto mechanic.