1996 - 2009 RIO VERDE UTILITIES Rio Verde, Arizona

Pipe fitter / Welder / Operator

Install aeration systems and headers also install skimmer plate, operate vacuum belt press, cut and weld new flanges on a 4“ - 6“ carbon steel pipe, install and set belt press on all thread bolt and level.

Constructed waste water lift stations, install submersible pumps and install aeration blowers, and piping ventilation system and piping using Victaulic system, also install aluminum hand rails sand filter.

2/2008 - 3/2008 CROWN ENGINEERING CONSTRUCTION Ukiah, CA

Pipefitter / Millwright / Welder

Demolition on Masonry Plant - cut out all boiler tubes, remove all cat walks and hand rails, fabricate pad eye and weld on mud drum to air lifted by 360 ton crane, using grinder and torch set to remove 4” - 8” I-beam.

8/2007 -10/2007 CROWN ENGINEERING CONSTRUCTION El Nido, CA

Pipefitter / Welder

Install 4” to 36” carbon steel, sch 40 and install over fire canister.

11/2007 - 12/2007 ZACHRY CONSTRUCTION Winslow, AZ

Pipefitter

Excavate and locate existing 6” and 8” pipes, cut and remove existing line and install new pipes. Also cut tig weld 4” 90 stainless steel on 4” stainless steel pipes. Weld flanges, fabricate blind flange.

2/2005 - 3/2005 GSI WESTERN, INC. Benicia, CA

Pipefitter

Worked at Conoco Phillips Refinery - Day to day lay out, premeasurement and cutting existing pipes, using bevel cutter and cutting out pipes; Cold cuts.

6/2004 - 7/2004 HUNTER CONTRACTING CO. Phoenix, AZ

Pipefitter

Upgrade the sewage treatment plant and modified old existing plant; install blower, pumps, submersible pumps station, work with ductile iron pipes, steel and galvanized pipes. Operate backhoe and Fork Lift on the project.

3/2003 PREMIER GENERATOR SERVICE, INC. Pittsfield, MA

Turbine - Hand / Pipefitter

Disassemble a 50 mega watt steam turban; loosen all steel bolts on the LP and HP shells, using tornado impact gun, loosen al bolts on upper bearings, carefully lifting the steam rotor, remove lower side bearings, steam cleaning, sand blasting, carefully inspecting for any excessive wear or damages. Also remove lower and upper oil deflectors using micrometer to check the Ids’ inspect for damages, the damage ones were replaced with new ones.

Did piping for residential, set bedding for 6” pipe, pvs, install MJ T fittings for fore hydrants. Check elevation and install fore hydrants.

5/2002 - 8/ 2002 SHAW CONSTRUCTION, INC. Goodyear, AZ

Pipefitter / JBL Operator

Plan out day to day piping off of the blueprints; bevel 6” stainless steel pipes, press fit 2” poly line and did some victual grooving with VE-206FS victual machine, help welders with their socket weld, help set steam turbine HP - shell / LP- shell and motor and install all oil cooler lines.

11/2000 ALDEN CONSTRUCTION CO. Salt Lake City, UT

Pipefitter / Operator

Operated 980 Caterpillar Dump truck: remove dirt from excavation site top grade; also operated a vibrating compactor compacting in three foot lifts, also did grade check.

1999 - 2000 PERC Huntington Beach, CA

Pipefitter / Millwright / Assistant Supervisor

Installed motorized check valves, fiber glass sand filters, install 120 ft. of potable water line; Help construct a roof, setting truss. Install continuous ventilation system, install felt shingles. Construct a pump station, fabricate and weld a manifold. Set pumps on all thread and grout the base of the pump. Rig and set 80,000 gallons three stage tank.

1998 TEMPEST COMPANY Murray, UT

Pipefitter

Operated 436B CAT backhoe, excavating for a six inch steel pipe high pressure gas line; also fit pipes for welders and set all skids.

1996 - 1997 NATIONWIDE CONSTRUCTION Paramount, CA

Pipefitter / Operator / Supervisor

Replace and repair 24” pipe, built a bigger form and poured concrete, replaced

some gate valves, and install several concentric reducer. Did piping on sand filter using vick coupling, weld steel and stainless steel pipes, install boxes, install hand railings, set blowers and manifolds. Install storm drains, sewer manholes, center fuge and sludge conveyors system and also back flow prevention valve. Supervise a crew of six personnel.

1996 - 1997 BECON BECKTEL CONSTRUCTION Marana, AZ

Pipefitter

Silverbel Mine - Fusion welding on 2” pipe to 36” poly pipe, also fabricate stainless steel bracket, also install beams, weld and bolt on, install piping in the tank farm.

EDUCATION__________________________________________________________________

May 1974 Richfield High School Richfield, Utah

1975 - 1977 Kicking Horse Job Corp Ronan, Montana

Heavy Equipment Mechanic & Diesel Mechanic - Certified

REFERENCES_________________________________________________________________

Michael L. Kleminski, Field Engineer 480-***-****

Billy Swofford, Supervisor 480-***-****



Contact this candidate