Objective
To secure a long term position with a company that will allow me to use my over 30 years of experience in Heavy Civil Construction to benefit the company fully.
Profile
Results-orientated, hands-on construction and development professional with over 30 years of expertise in Heavy Civil Improvement Projects, and Government Facility Construction. Successful track record for completion of Multi-million dollar projects within defined scope of work through thorough planning, design and execution.
Personal Statement
I am a dedicated individual with ambition to succeed in any given environment. I am always up to a challenge whatever the situation presents. I am seeking a position where I can continue my development and exceed expectations while giving my best to an employer.
Certification Summary
1. OSHA 30 & 10 Certified
2. Trench Shoring Competent Person
3. Quality Control
4. Fall Protection Certified
5. EM-385 Knowledge
6. Building Codes
7. MS Office/Outlook
8. Forklift Safety
9. Scaffold Erection
10. CPR/First Aid
11. Professional Attitude
12. Backhoe/Tractor Safety
13. Confined Space
Recent Experience
superintendent/Safety officer
GREEN JACKET CONTRACTORS – WATERTOWN, NY. (OCT.-2010 – PRESENT)
Trinity River Erosion and Environmental Repairs – Wallisville, Texas
Scope included Clearing and Grubbing, Excavation and Backfill, 1,200LF of Sheet Pile Driving (I.E. -36ft). Pile Drive 225 H-Pile’s (I.E. 98ft), de-watering, welding, epoxy coating, Wire Rope Guardrail, Seeding area of 48,00SF.
1. Create Project Look ahead Schedules.
2. Coordinated work activities with Subcontractors to generate the best effective path to complete.
3. Prepare RFI’s, Submittals and manage same through the approval process.
4. Conduct Daily Safety Meetings with onsite personnel.
5. Schedule all Self Perform activities.
6. Resolve potential concerns before they become schedule impacts.
7. Effective communication with Engineers, Architects, Subcontractors and Government.
8. Prepare and Submit detailed daily production reports.
USACE - Spillway Bypass Pipeline and Valve Civil Engineering Improvement to install a 48 in Overflow Pipeline and construction of a New Valve Vault.
Scope: Rough/Finish Grading, Site Utilities, Site Demolition, De-watering, Structural Steel, Deep Excavation, Backfill and Concrete.
9. Rough / Finish Grading
10. Provide new Site Utilities
11. Site Demolition and De-Watering...
12. Provide new Structural Steel.
13. Deep Excavation and Backfill with Shoring system.
14. Provide new Concrete Outfall and Valve Vault Structures.
15. Submittal Review.
16. Ensure quality control is maintained on projects in accordance with the Plans and Specifications.
17. Effective communication with Engineers, Architects, Subcontractors and Government.
USACE - Gulf Intercostal Waterway, Channel to Victoria in Calhoun and Victoria Counties, TX.
Erosion Control Repairs to Victoria Channel Bank.
Provided and installed Rip Rap Barrier protection
Mass Earthwork - Deep Excavation and Backfill to River Embankment
New Concrete Structures
Finish Grade and Landscape re-vegetation
Provided Safety oversight for project including daily safety meetings, maintain and monitor deficiency log.
Weekly Subcontractors production coordination meetings.
Effective communication with Government representatives and uphold Quality Assurance throughout projects.
general superintendent/sAFETY OFFICER
Posen Construction – Estero, Florida (JUN.2006 – OCT.2010)
Scope included various Pile Driving and Bridge Construction
18. Demolition of Existing Bridge.
19. Layout and construction of Template for Pile Driving.
20. Drilling and placement for Caissons, Cofferdams, H-Piles and Sheet Piling.
21. Forming, Reinforcing and Placement of Pile Caps and foundations.
22. Decking and formwork system of Bridge Deck and Barrier Walls.
23. Coordinated work activities with Subcontractors to generate the best effective path to complete.
24. Conduct Daily Safety Meetings with onsite personnel.
25. Prepare and Submit detailed daily production reports.
PROJECT SUPERINTENDENT
Hubbard Construction – Venice, Florida (JUL.2004 – JUN.2006)
Role – General Superintendent, Bridge and Pile Driver and Substructure Superintendent.
26. Demolition of Existing Bridge.
27. Layout and construction of Template for 24” Pile Driving.
28. Drilling and placement for Caissons, Cofferdams, H-Piles and Sheet Piling.
29. Installation of Precast Concrete Sea Wall Panels. Work completed in (3) Phases.
30. Forming, Reinforcing and Placement of Pile Caps and foundations.
31. Decking and formwork system of Bridge Deck and Barrier Walls.
32. Coordinated work activities with Subcontractors to generate the best effective path to complete.
PROJECT SUPERINTENDENT
MCM Construction – Naples, Florida (JUL.2001 – JUN.2004)
Responsibilities – Pile Driving Forman Promotion (1999) to Pile Driving Forman.
Golden Gate Parkway
33. Construction of (2) new Bridges over Water and (4) Bridge Re-Construction.
34. Constructed (4) Pontoon Barges-serving installation of Coffer Dam.
35. Formwork and pour Foundation Coulombs and Caps.
36. Demolition and Formwork for widening of (2) Bridges over Interstate 75.
37. Forming, Reinforcing and Placement of Pile Caps and foundations.
Golden Gate Flyover
38. Set Up and Drive all Piles
39. Formed and Poured Foundations, Coulombs and Caps.
40. Set Up Girders.
Tech Marine, Inc. – Ft. Lauderdale, FL. (Sept.1994-June.2001) Weldingfabrication and Steel Erection.
Installation galley equipment, piping and structural repair.
Cruise Ship, Yachting Industry and Steel Structured Buildings.
Equipment History
1. Crane Experience – (6) Years.
Crane – Manitowoc 777.
Crane – Manitowoc 555.
Crane – Link Belt 110 Ton.
50-75 Ton RT Cranes
Heavy Equipment – (8) Years.
Excavators, Loaders and Dozers.