RESUME OF AL GONZALES
Phone # 210-***-****
SUMMARY:
Bilingual-Spanish and English.
Strong background, extensive experience in cell sites, telephone equipment, central office equipment including installation, modification, preventative maintenance, repair, testing, and all aspects of troubleshooting.
Strong personal motivation with leadership qualities and ability to direct and instruct personnel (on-job-training) of system maintenance (including instruction, guidance, & correction of procedural errors).
People oriented; results minded.
Excellent organizer, planner, and coordinator.
SKILLS:
My educational experience included learning to butt, strip, fan form, and connect.
Studied floor plan drawings, cable rack plan, frame and aisle lighting plan, basic electricity and D.C power.
Read cable tags, tie a slipknot, run, and sew cable and wire wrapping.
Modifying and installing electronic equipment, #1 E.S.S. and 326 power plants in San Francisco & Oakland, CA telephone offices.
Motorola SC 4812 T, Nortel s12000, True Position LMU, Cisco ons15454, 7500, 7609, 3845. Juniper M320, Ciena, K2 Core director, Fujitsu 2400 trib, Flashwave 4500, Nortel Succession MGW 9000, DMS 250, sl100, DTF, VME, pdf, dsx, dsc tear out 600e 8 bays and three rectifiers, OC installed 3, 12, 48, 192 and mastered all iron works.
Installed Ericsson LTE 6101, UMTS 3206 node B
Ericsson certification -Basic Builder RBS Qualified
Installed Ericsson UMTS 3206 node B
Ericsson certification on GSM RBS 2106/2206 installation, optimization, test and integration course.
Motorola sc4812t certification.
Anritsu S251 one day training
2011 AT&T ask yourself course no.51247894
2011 AT&T supplier awareness course no. 60007518
2010 AT&T quality installation course no. 60065363
EXPERIENCE:
SPRINT/APEX
McAllen,tx.AUG 2012 - AUG 2012
recieved 21 crates with bays and equipment for EBSC installation and uncratet all of them
anchored and leveled the eleven bays,ran top support,grounds to the fbe,ran power cables and terminated them.populated the cards.
R&R solutions MAY 2012-JULY 2012
Structured cabling technician, Ran cat-6 in JCpennys stores to upgrade to wi-fi capabilities
SPRINT
LITTLE ROCK, AK. OCT 2011-DEC 2011
installed a LIM and ran some power cables and powered up bay and wire wrap T-1s
AT&T / teksystems
San Antonio, TX SEPT 2011-SEPT 2011
installed and terminated power cables on one bay with 500mcm . Ran cat-6 cable from fourth floor to
third floor.tested cat- 6 cables and soldered some connection.
Cricket Communications
San Antonio, TX July 2011-Aug 2011
Installation Technician
Worked on Hot Slide out in the field moving Nortel and replacing with Huawei
Wire wrapping T-1.
Further Enterprise Solutions
Dothan, AL.April 2011-May 2011
Installed Cisco Routers 2941 grounded, powered and added T-1s
Net Versant
Little Rock, AR.,Feb 2011-Apr 2011
Installed fif in cell site and train some level one personal on the procedures.
Ericsson
Tampa, FL. Oct 2010-Nov 2010
Ericsson second carrier added radios to cell site in Tampa and surrounding area.
Ericsson
Tampa, Fl .June 2010- Aug 2010
Installed Ericsson cabinets LTE RBS 6101 also installed ac power cables, grounding cables, RF jumper cables, fiber cables, and GPS cable and torque all bolts to OEM specifications.
Ericsson
Dallas, Texas Feb 2010-April 2010
Installation Technician
Installed cabinets UMTS 3206 also installed ac power cables, grounding cables, RF jumper cables, fiber cables, and GPS cable and torque all bolts to OEM specifications, and powered up cabinet.
Nortel
Oklahoma. Sept 2009-Nov 2009
. HS1- builder
Worked on Nortel Metro Cell CDMA
Removed old radio, and antenna jumper cables.
Installed new mfrm3 radio, and cabled radio, ran power, fiber, and t-1 connected cable to t-1-cem card and connected cable, ran the other side(hardwire) to DSX panel and Wire wrapped all circuits to their assigned designation.
Installed DOM-A card and CEM card.
Nortel
Laredo, TX . Aug 2009-Aug 2009
RF Technician
RF engineer re-home project, worked with Laredo MTSO, got site assignment went to site called San Antonio, TX. MTSO waited until they gave the ok to re-home the t-1 from old NIU to new NIU.
T-Mobil
PHILLADELPHIA,PA. July 2008-Aug 2008
RF engineer for MBI doing the quality auditing, alarm clearing, call testing, node b Ericsson UMTS 3106 cabinet.
AT&T
Midland, TX May 2008-June 2008
Installation Technician
Telecom technician for Inter bay Technologies.
Installed aux bar, cabinets, cable rack, servers and routers, grounded them and powered them in a VHO for AT&T project u-verse.
AT&T
Louisville, KY Sept 2007-Sept 2007
Installation Technician
Telecom technician for bayside solutions, installed seven bays and grounded, powered, ran inter bay cables for Cisco 7609.
AT&T
Houston, TX April 2007-May 2007
Installation Technician
Telecom technician for Ajilon installed Nortel mgw15000.
Grounded and powered equipment, Ran inter bay cables and connected them, and turned up bay.
Sprint PCS
Puerto Rico July 2006-Oct 2006
Installation Technician
Telecom technician for pride telecomm did a power swap-out from 110 volts to 220 volts also swap-out the old 110v Eltek rectifier and installed a 220v new one
Ran switchboard cables, cat-5, ground, and power cables installed tested and turn-up Harris radio at microwave stations throughout the island.
AT&T
Oklahoma City,OK. June 2006-July 2006
Installation Technician
Telecom technician for AFL Networks installed UMC 1000 equipment ran ground cables to mgb, ran power cables to pdu and ran switchboard cables from equipment to blocks at MDF and terminated them at several central office’s, was sent to Waurika, OK. to test and turn-up a Fujitsu Flash wave 4500 and accomplished task.
Cingular
San Antonio, TX . April 06-June 06
RF Technician
Installed rx-ait bay with 3 rx-ait units, 3 diplexers, 3 duplexers and 3 duel-duplexers, ran ground from bay to mgb, ran power cables to power plant to assign breakers.
Ran RF jumpers from rx-ait bay to hatch plate, ran RF jumpers from rx-ait bay to GSM and UMTS cabinets.
Test and turn-up bay at BTS sites.
Nokia
Shreveport, La. Feb 2006-April 2006
Installation Technician
Installed Nokia RBS equipment at BTS sites
Anchored, grounded and powered Nokia bays.
Populated the bay with appropriate trx,s.
Tyco
San Antonio, TX . Jan 2006-Feb 2006
Installed rectifiers and ran 750, 500 MCM cables and stitched them.
Cricket Communications
San Antonio, TX . Dec 2005- Dec 2005
Builder
Installed DMS 100, anchored and leveled bays, ran ground to mgb, and ran switchboard, cat-5 cables and terminated them.
Ran Inter bay cables and connected them.
Ran power cables to the pdu.
Sprint PCS
Biloxi, MS. Sept 2005-Nov 2005
Wireless Technician
Telecom Technician for Pride Telecomm.
After hurricane Katrina passed Mississippi and Louisiana, an empty BTS shelter was brought to Jackson, MS so we could install the telecom equipment for Biloxi, MS.
proceeded to install Ciena, Alcatel,to the fiber optic bay, and misc. equipment.
The power plant was assigned to me for the duration of project at BTS sites for Hurricane Katrina Telecom System Restoration.
Cingular
Oklahoma City, OK. May 2005-Aug 2005
Site Surveyor
Site surveyor for AFL networks services, took about 70 picture’s per BTS site
Transferred pictures to cds and mailed to headquarters for 105 sites.
Verizon
Sacramento, CA. Feb 2005-May 2005
RF Technician
Worked on sc4812t Motorola rollout for bbx re-work and change out to mcc-1x
Replacing and calibrating of specific 3G- bbx-1x cards and changing out mcc24’s to 3G mcc-1x
Took BTS off-air, harvested gli 1, replacing bbx cards and up grading mcc cards
After test and turn-up, placed removed cards on boxes and returned to local market.
Cingular
Oklahoma City, OK. Nov 2004-Dec 2004
Site Auditor
Site auditor for AFL Network Services
Measured length and width of BTS site shelter and noted down on drafting paper
Took measurement of all equipment on site, dmarc was first, LMU, RF cables at hatch, HVAC, batteries, power plant, breaker and destination. At the MGB noted down every wire destination,
Sprint
Port Charlotte, FL Aug 2004-Nov 2004
Telecom Technician
Telecommunication tech for AFL network services.
Did the power restoration after hurricane charley.
Took out all the old batteries from the Nortel OPM.
Installed new batteries and maintained and troubleshoot the outside power modules.
Worked on some of the DSL equipment and installed new cards replaced the bad ones out in the field.
Ran circuit at the mdf and balanced some wire blocks.