Post Job Free
Sign in

Engineer Power Plant

Location:
Obando, Central Luzon, 3021, Philippines
Salary:
5000usd
Posted:
December 06, 2011

Contact this candidate

Resume:

CURRICULUM VITAE

GREGORIO L. DE GUZMAN

*** *******, ******, *******

Tel No. : +632-*******

Cell No.: 091*-*******

Email : ************@*****.***

*.*.********@*****.***

I. PERSONAL INFORMATION

S.S.S. No. : 03-6397550-0

T.I.N. No. : 132-008-273

Civil Status : Married

Spouse Name : RUTH A. DE GUZMAN

Children : Greg A, De Guzman

Genevieve A. De Guzman

II. SPECIAL TRAINING

1980 - Industrial Plant Study/Survey

• Delta Motors Corp. (Toyota Motors)

• Asian Transmission

• Mak-Ban Geothermal Plant

1981 - On the Job Training (OJT)

Manila Electric Co. (MERALCO)

• Electrical Testing and Inspection Section

• Sub-Station Section

1982 - On the Job Training (OJT)

Manila Electric Co. (MERALCO)

• Communication and Control Section

• Automation Development Section

III. PROFESSIONAL CAREER

Company

TRILINK Tech.

LRTA (Light Rail Transit Authority)

DOST-MIRDC

MULTICORE CO.

TELEFONICKA Inc.

TELEFONICKA Inc.

Date Covered

Sept. 2011 to Present

Aug.01, 2008 to Sept. 2010 and Nov. 16, 2010 to August 2011

Sept. 2010 to February 2011

Dec. 01, 2010 to

February 2011

Oct.2007 to 2009

Oct.2007 to June .2010 Duties and Responsibilities

Project Consultant

LRTA

E&M Technical Consultant

OFFICE OF THE ADMINISTRATOR

E&M TECHNICAL CONSULTANT for MONORAIL PROTO-TYPE PROJECT. [Design and Built]

Technical Consultant for Green Energy

Operations and Telecommunication Consultant (SLMC TELECOM and NETWORK Project the Fort; MRT CCTV and FOC Backbone Network Project and LRT1 NEP Telecom.)

Project Manager

St.LUKE’s Hostpital Project Global City, Taguig City

MEPF-Telecommunication/Networks

Chiyoda (CTJV) SANKO Singapore (Pte.) Ltd.

Feb. 2008 to July 2008

DSC / IPS (Train 7) FAT / iFAT of Qatar Gas Plant Project. Instrument and Control Test Engineer

LRTA (Light Rail Transit Authority) Manila, Philippines July 2007 to Feb.2008 E&M Technical Consultant (South Extension Project) TWG

Sumitomo-Itochu

Joint Venture

June 2006 to Dec.2007

LRT 1 Capacity Expansion Project

QA/QC and Construction Engineer for Telecommunication and Control & Electrical.

Philips Technical Consultant, Corp./

Louis Berger Group Phil., Inc.

March 2006 to May 2006

MRT Extension Project (ENT North EDSA)

Electro-Mechanical Engineer

Concept preparation for Light

Rail Transit for Communication

and Mechanical system

Feasibility study

Mitsubishi Heavy

Industries, Ltd. May 2005 to Feb.2006

January 1997

to

July 2000 AES Combined Cycle 400MWe X 4

Mitsibushi and Initec Consortium

Cartagena, Murcia, Spain, E.U.

Control Engineer

Instrument and Control

and Commissioning Engineer

DCS commissioning

Instrument erection Inspector

Gharb Thermal Power Plant

Iran Project (Under Project Mgr. Power Plant Construction Department)

Site Manager and Guarantee Engineer

• System management

• Planning and control of activities

• Material Control and management

• Coordination of engineering works

• Negotiating and contracting

• Cost estimate

Scheduling of work activities for shut down and defect removal

November 1992

to

December 1996 Shahid Rajai and Gharb Thermal Power Plant

Iran Project ( Power Plant Construction Department)

Instrument and Control Engineer

• Commissioning of Sequence Control Section

• Improvement and modification of Control Sequence Logic

• Field equipment commissioning and adjustment

• System designing and QA/QC of control system

December 1991

to

February 1992 Nagasaki Works

Instrument Design Section

Instrument and Control Engineer

• Assist in Control System designing

• Factory testing of Sequence Control

March 1988

to

June 1991 Saudi SCECO 600MW x4units

Quarayyah Thermal Plant

Quarayyah, Saudi Arabia

Instrument Construction Group

Instrument and Control Engineer

• Material control and management

• Instrument erection and construction management

• Supervision of fine tuning adjustment of sequence control

May 1987

to

January 1988 Kuwait MEW 300MW x8 units

Al Azour Thermal Power Plant

Instrument Construction Group

Instrument and Control Engineer

• Supervision of Control system sequence and field instrument adjustment

• Instrument Erection Supervision

Metro Inc.

LRTA Comp. Aurora Blvd., Pasay City

October 1983

to

April 1987 Telecommunication and Electronics Supervisor

• Assistant of the Consultant of Telecomm. and Power system of Tractionel Engineering International, Belgium

Belgian Consortium for LRTA Project October 1983

to

April 1987 Concurrent Assistant Consultant (Tractionel Engineering International)

• Supervision of telecommunication equipment erection and commissioning

• Supervisor for carriageway power and control cable erection

• Commissioning of LRT1 workshop auto/electronic control equipment

• Commissioning and testing of UHF communication transceiver(Bego)

MIESCOR

Meralco Comp., Ortigas Ave., Pasig September 1982

to

October 1983 Automation Development Section

MERALCO

Electronic Engineering Technician

• Fabrication of remote control for power substations

• Debugging and testing of control modules

• Functional and sequence test and quality control of finished product

Maintenance, repair and troubleshooting of control modules

Sgd. GREGORIO L. DE GUZMAN



Contact this candidate