ASHRAF MALK
Revere, MA 02151
***********@*****.***
OBJECTIVE Scheduler Position
March 2007 Planner/Scheduler
Present North East Utilities / PSNH Manchester, NH
115kV Power St. Substation in Hudson, NH
Hudson SS/Power St. Line Cutover, NH
V182 115kV Transmission Line between Garvins/Webster , NH (25Miles)
V182 P+C Modifications @ Webster SS and Garvins SS, NH
K165 P+C Modifications @ Reeds Ferry SS, NH
345 kV Breakers Replacement @ Scobie SS and Berlin SS
CCVTs and LAs Replacment @ different Transmission Substations
I do use Primavera P6 to develop and maintain detailed logic driven schedules (Engineering/Procurement /Constructions/Outages) based on the WBS, with task-definitions, dependencies between activities, deliverables and milestone dates explicitly identified, Interact with suppliers and vendor to collect and collate progress information and status to update the project schedule and report to the project team for the above mentioned transmission projects
Create, maintain, and assign approved baseline schedules for comparison and use total float value equal to or less than zero to identify those activities on the critical path for recovery actions.
January00 Scheduler/Cost Engineer
March 2007 Modern Continental, Central Artery Tunnel project Boston, MA
I-90 Fort Point Channel Crossing, Silver Line Tunnel & I-90/I-93 Tunnel projects
• Utilized Primavera software to support site construction activities with updated construction schedules and analysis, and interface with various project subcontractors to coordinate schedule integration
• Prepare construction estimation, cost planning and claim analysis reports
• Prepare and submit claims for extra work and change orders including labor, material, equipment and sub costs.
• Monitor and assign cost codes for construction activities on foremen daily labor reports
• Prepare and submit contractor quantity estimate for all the project’s pay items
August99 QC Engineer
January00 EnviroServe Inc., Wakefield , Massachusetts
Barracks Rehabilitation Building 15, US Army, Natick, MA
• Prepared and reviewed submittals for construction activities in accordance with the project’s specifications
Ashraf Malk Page 2
Feb. 1996 Engineering Field and Lab Technician
August1999 METRO TESTING LABORATORIES BURNABY, BC
Vancouver International Airport runway & Bayshore Towers projects
• Prepared field and lab test results reports as well as letters of assurance for different projects
• Approved tested and monitored excavation and compaction of soils
• Performed quality control tests on concrete and soils in accordance with ASTM
January 1996 Surveyor
February 1996 WALTER & SCI CONSTRUCTION
West Coast Express Second Narrows Shoreline Improvements
• Layout and grading for the excavation, backfilling, side slopes and the sub-grade of the pre-cast stress wall
July 1995- Grade Checker/Surveyor
October 1995 PETER KIEWIT SONS Co. Ltd. Richmond, B.C.
Vancouver International Airport Parallel Runway project
• Operated the dual plane laser level in slope staking and grading the infields between the Taxiways and the Runway, the glide path and the sub-base of the access road and monitored the paving of the cement soil base of the Apron.
March 1993- Field Engineer and Estimator
April 1995 ABB SUSA Inc./Dillingham Construction N.A., Inc.
• Suez Waste Water treatment plant, Suez-EGYPT
• A $90,000,000 project completed in 30 months
Responsibilities
• Co-ordinated with the sub-contractors, the survey crew, quality control inspectors, geotechnical engineer, and field-testing staff.
• Estimated weekly materials and labour costs for the following earthwork structures:
• 6 P.V.C.lined lagoons: 2 Aerated lagoons 250 x 200 m and 2 Facultative Lagoons
700 x 250 m
November 1990- Site Civil Engineer
EDUCATION B.Sc.Civil Engineering
1986 Assiut University, Assiut, Egypt
1997 Computer Estimating Course
New Westminster, B.C.
1997 Conflict Resolutions Studies
October 99 Construction Quality Management for Contractors Course US Army Corps of Engineers, Concord Massachusetts
November 2000 Planning and Scheduling with P3 Course #601, Cambridge MA
COMPUTER SKILLS AutoCAD , Primavera P6, Autosketch, Word Perfect 5.1, Word, Excel 5, Lotus 1-2-3 V5 for windows 3.11+ 95andQ +