Year of birth ****
________________________________________
Permanent/Home Location/Address
City or Town Jakarta
State Jakarta-selatan
Country Indonesia
________________________________________
Current Location/Address
State Jakarta-selatan
Country Indonesia
________________________________________
Languages
Primary Language Fluency
English Read, write and speak fluently
________________________________________
Nationalities
Main Nationality Indonesian
________________________________________
Experience Classification
Job Function Years Experience
Steel Structure Supervisor 4
Civil Supervisor 10
Civil Superintendent 8
Building Supervisor 4
Civil/structural Steel designer 4
Industry
Oil, Gas refinery 22
Building-Construction 4
Civil/Steel structural Eng. 4
________________________________________
E-Mail ************@*****.***
________________________________________
Home ph +62-21-290*****
Mobile Ph +62-852-********
________________________________________
Qualifications
Highest Qualifications HND/Diploma
Qualification Subject Establishment/Country Year
HND/Diploma Civil Indonesia 1979
________________________________________
Work Locations
Are you willing to move or relocate?
Yes - I will travel internationally
Yes - I will relocate internationally
________________________________________
Availability
Start Immediately? Available Now
Earliest Start Date Given 3 weeks notice
________________________________________
Ideal Next Job
My next employment opportunity would be: onshore Construction Engineer, Supervisor/superintendent, Senior Civil/Steel Structure supervisor, Building Supervisor, or Civil/steel structure Inspector and Field Civil Engineering
________________________________________
Required Salary & Conditions
Salary requirements depend on the job location, conditions such as accommodation, rotation etc. (negotiable) ________________________________________
Employment History
Total Years of Work 30
Experience
Commenced Full Time Work 1980
Name McDermott Inc.
Job Title: Area Construction Superintendent
Duration From: 2010 – To date
________________________________________
Objective
Onshore Experienced Engineering and Construction worker to secure a position within an established company where my skills and experience will be utilized, and opportunity for future advancement
________________________________________
My work experience has been vast over the years. I may not have the college degree that most people insist on but, I can do the job that I am tasked with, bring it in on time. I have a high regard for safety. All the projects I have supervised I have not let a Lost Time Accident occur. I believe in safety and instill this upon all who work under me.
________________________________________
Qualification Summary
Thirty (30) years of extensive experiences variety in Onshore civil/steel structural, piping engineering design and onshore project management, construction Engineer/supervision, planning/scheduling in Oil & Gas refinery, Petrochemical and Infrastructures Project.
________________________________________
Computer Skills and Software Used
Microsoft Office Applications
________________________________________
Training/Courses
HSE, Induction, TSTI/TSTO, Commissioning Transitional, ISSOW Awareness, Rigging Safety, Marine safety, Fire fighting, ISSOW PTW for PA(Performing Authority), Barricade & Fall protection awareness, Grating removal awareness, Fall protection, Confined space entry, Grating removal, Lifting supervisor
________________________________________
Work Experience
CURRICULUM VITAE
Name: Winarno
Current Status: Construction Engineer / Superintendent
May, 2009 – to date, JGC Indonesia Home office, Indonesia
Construction Engineer
Preparing Method of statement of Field procedure such as: Pipe lay, Piling, Concrete Structure, permanent Road, Back filling, Steel structure erection work, lifting and other work procedure related to the Construction method of statement.
Feb, 2005 - May, 2009, Tangguh LNG Project, West Papua - Indonesia
Area Construction superintendent
Seconded from JGC Indonesia to: KJP (KBR, JGC, PFN Consortium)
Responsibilities included all construction execution, scheduling, and quality control, reporting progress and status and chairing meetings. Extensive knowledge in interacting with owner, utility representatives, and subcontractors. Others duties: examining and safety and ensuring that specification were meet, analyzing structures, conferring with supervisory personnel and subcontractors to discuss such as matters as work procedure, complains, and construction problems and contracting workers to perform construction work an accordance with specification. Duties included stringent organizational skill regarding scheduling, paper work, and materials tracking following government guidelines and dealing with multi-national clientele addressing both practical necessities and duties required to sustain a standard of living in a harsh environment under less than ideal conditions while maintaining a high volume of productivity along with high quality product. Other duties: verifying materials loaded unloaded again work order and scheduled time of shipment and mode of transportation, inspecting equipment for wear and completed work for conformance to standards, observing work procedures to ensure quality of work and estimating material and worker to complete job.
Nov, 2000 - Dec, 2004, Palm Oil Mill (2x 60 Ton cap. per hour) Indonesia
Construction superintendent
Working for JGC Indonesia own project
Ensure that contractors comply with all aspects of the Worksite HSE Plan and policy; site regulations, permit to work and Client requirements. Supervise construction effort to ensure project is constructed in accordance with design, budget and schedule; includes interfacing with client representatives, other contractors, etc. detailed planning, coordination and interfacing of construction activities within a continuous operating plant environment. Resolves problems and difficulties encountered or elevates it to the appropriate supervisory personnel. Supervise and coordinate the activities of construction contractors. Ensure by leadership and guidance that contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions. Maintain daily supervisory surveillance checks and records ensuring that contractor’s management and supervision are providing safe working conditions and permitting procedures, all required competent personnel, protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets. Ensure that all quality control checks and tests are instigated, with records maintained and available and area release in accordance with contractors ITP. Ensure practical security and protection of the works and that all contractors’ provisions for temporary plant are fit for purpose. Ensure that a risk assessment has been undertaken and agreed prior to commencement of any new type of work activity. Maintain supervisory attendance at Tool Box talk and pre start meetings. Attend Contractor progress meetings as required. Promote and maintain Client and contractor best practice working relationships.
May, 1998 - Aug, 1999, Polypropylene Plant, Malaysia
Building Engineer / Supervisor
Seconded from JGC Indonesia to JGC Corporation
• Co-ordination with the project consultants on design development and construction details through fortnightly meetings.
• Checked the Reinforcing Bars, conduit pipe, dowel bars arrangement, sewer and drainage system, prior Concrete casting works.
• Co-ordination of an extensive inspection and assessment program using various visual and geotechnical techniques.
• Giving appropriate solutions to Construction problems that may occur.
• Verifying the sub-contractors’ progress claims and carrying out final work measurements.
• Preparing weekly, monthly and master work schedules and monitoring the actual progress against the schedules.
• Reporting the monthly progress of the project to the senior management. Leading a team of supervisors to ensure smooth and efficient running of the construction.
• Developed and implemented environmental performance management policies and programs.
• Participated in environmental audit and risk assessment job.
• Project which consisted of five (5) story high-rise process buildings complete with equipment Concrete foundation on ground, steel structural and its miscellaneous foundation on its stories, Substation and main Control room, steel and concrete pipe rack, equipment foundation, and others miscellaneous work such as concrete and asphalt road.
June, 1994 - June, 1995, polypropylene plant, Indonesia
Building Engineer / Supervisor
Seconded from JGC Indonesia to JGC Corporation
• Planning, monitoring day to day construction activities and supervising the site construction staff.
• Ensuring the construction machineries & equipment are in working condition at site.
• Planning and controlling of materials movement.
• Supervision and directing construction activities according to the technical and commercial criteria.
• Ensuring the effective implementation of Quality Assurance System procedures with regard to the execution of the project in his engineering discipline.
• Ensuring that the Quality of materials and installation of work is in accordance with the acceptance criteria identified for the Project and the company quality system.
• Ensuring that the work is completed in a safe manner and that all necessary Safety Regulations and Statutory Requirements are followed.
• Issuing instructions to the section Engineers, site Engineers and foremen to complete the work in accordance with Project Planning and schedules.
• Supervision of any subcontract work to ensure Quality and Completion of work in accordance with Project Specification.
• Review of Planning and Scheduling for the forthcoming weeks and advising the Project Manager of any discrepancies to allow for changes in workload.
• Completing all necessary documentation to be included in weekly and monthly reports for the Project Manager's review.
Jan, 1992 - Feb, 1995, EXOR-1 (Export Oriented Refinery), Indonesia
Senior civil & steel structure supervisor
Seconded from JGC Indonesia to JGC Corporation
• Ensure site implementation of site works in accordance with Project execution plans, legislation and site standards.
• Ensure contractor comply with all aspects of the work site HSE plan and policy, site regulations, permit to work and client requirements.
• Detailed planning, coordination and interfacing of construction activities within continuous operating plant environment.
• Check and review all contractor scope as detailed in drawing, specification and instruction. Ensuring contractor adhere to the latest approved for construction (AFC) project drawing and specifications.
• Ensure Method Statement, risk assessment and JSEA/ has been undertaken and agreed prior to commencement of any new work activity.
• Monitor progress, ensuring that work quality and technique are of high standard.
• Supervise and coordinate the activities of construction contractor.
• Responsibilities included overseeing the contractor site mobilization activities, checking and commenting contractor submitted construction Method Statement, Job Safety & Environmental Analysis, construction planning, field civil and construction supervision with a goal of “Nobody get hurts on or off the project”.
• In-charge of GRP Pipe construction from sheet piling, excavation, strutting, dewatering system, pipe laying, pipe jointing/lamination to hydro-testing and backfilling works.
• In-charge of trial digs, excavations, piling works, construction of pipe rack foundation & columns/interconnecting pipe racks, equipments foundations and erection of pipe rack structural steel.
• Maintain supervisory attendance at tool box talk and pre start meetings.
• Controls site/monitoring of construction schedule, site job progress and take measure to control delays and reporting.
• Organize/conducted progress meeting with the contractor.
• Participated in Contractor’s weekly construction meeting, as client representative and discussed issues affecting performance and resolve matters of utmost importance.
• Issue Plan Action Memo to contractor if there are a changes or additional requirement for the project.
• Reads and interprets engineering drawings, reviewed project schedule, scope of works and method statement prior for construction works.
• Delegates specific work assignment and allocate each area of responsibilities to foreman’s and sub-contractors.
• Involved in the field inspection with client representative on the acceptance of completed work such as rebar, formworks and concreting works.
Jan, 1990 - Nov, 1991, EXOR-1 (Export Oriented Refinery), Yokohama-Japan
Civil Designer
Seconded from JGC Indonesia to JGC Corporation
• Prepared Basic Engineering design Data (BEDD) for Underground sewage system such as Oily sewer, Oily water, Drip Funnel, Oil contaminated water, including Fire fighting piping line. For the EXOR-1 project.
• Preliminary Calculation work to determined pipe sizing for the above work.
• Preliminary materials take off, before proceeding to engineering stage.
• Prepared basic design drawing of all aspect of Under Ground facilities work.
Sep, 1988 - Dec, 1989, CPX (Paraxillene Project), Indonesia
Civil and steel structure Construction Coordinator
Seconded from JGC Indonesia to JGC Corporation
Member of the site construction team and responsible for the Coordinator, supervision, layout & setting out of structure, quality control of concrete and also Steel structure, conducting laboratory & field test, coordination among the other discipline of works, assisting the steel erecting team, preparation of weekly progress report of civil and Steel structure works, management of local workforce, sourcing of special type of construction materials & procurement in local market, assisting the unloading of imported materials at site, external & internal finishing work etc. of civil/ structural works.- The project involves boiler foundations (4Nos), diverter foundations (2Nos.), Steam turbine building, switch gear building, oil skid foundation, Air cooled condenser foundation, step up transformer & foundation, reducing station & foundation, air fan cooler &foundation, water treatment plant building, workshop building, sanitary waste water treatment plant, filtered water basin, waste water pit, oil separator pit, cooling water pit, switch yard foundation, Pipe rack & foundation, storm water & oily water sewer, cold & hot process sewer, fire water system, flexible rigid pavement, walkway & landscaping, embankment construction Etc.
Aug, 1987 - July, 1988, LPG Extraction Project, Indonesia
Civil and steel structure Supervisor
Seconded from JGC Indonesia to JGC Corporation
• Plan, schedule, execute, supervise & manage contract works.
• Plan, schedule, and perform preventive and corrective maintenance for temporary infrastructures.
• Prepare & coordinate relevant contract shop/as-build drawings and temporary services drawing.
• Prepare and submit materials and method of statements to consultants.
• Prepare and submit works progress reports.
• Chair progress & coordination meeting with subcontractors,
Attend and arrange progress & technical meeting with clients and consultants.
• Attend to complaints and coordinate with users during defect liability periods.
• Propose and implement costing saving for temporary infrastructures and construction methods.
• Schedule and arrange for inspection and handing over to clients.
• Practical coaching and emphasis safety work procedure to workers.
• Prepare quotation and progress claim to clients and consultants.
• Prepare and attend for auditing.
• Keep record of all site inspection according to updated drawing.
• Continuous updating of latest issue drawing.
• Prepare or report site progress & issue site memo when progress is delay
• Attending consultants meetings & technical meetings.
• Check the Equipment & material used according to specification or approval.
• Issue site memo if the contractor can't take verbal instruction.
• Keep accurate records of variations from contract.
• Identify drawing discrepancy.
• Assist the engineer or architect with suggestion in construction detail or other problems.
• Carry out all witness testing as specified or requested by engineer.
• Identify defects & keep proper records.
Feb, 1985 - Aug, 1986, MUSI REFINERY PHASE-I, Indonesia
Civil and Steel Structure Supervisor
Seconded from JGC Indonesia to JGC Corporation
• To Coordinate Sub-contractor progress to follow schedule of construction progress, since fabrication up to the erection of steel structure construction.
• To check and studying of steel structure materials codes, standards, and specifications, establishing proper work scheme and procedure.
• Supervised and inspection through all stages of Steel structure construction in accordance with Specification and drawing.
• To control and measured the characteristic of an item, the degree of satisfaction of work or performance in view of the requirement.
• Assist Test and Inspection to be performed by the Field Inspection at the each stage of the Steel structure Erection.
• Provide Test and Inspection reports with detailed data for Final Record or performance evidence
June, 1983 - Nov, 1984, Crude oil Terminal, 180.000 BBL Crude oil
Storage and Utility Facility Project), Indonesia
Piping Designer/ Draftsman
Seconded from JGC Indonesia to JGC Corporation
• General, responsible of Design and drafting work related to Piping work as requested by Engineer.
• Prepared, design and drafting for: pipe support, Pipe shoe, standard drawing, Materials take off, etc.
• Prepared Field change sheet.
July, 1980 - March, 1982, P.T. Mc Dermott Inc. Indonesia
Steel structure Draftsman
• General, responsible of Design and drafting work related to steel structures as requested by Engineer.
• Prepared design and drafting for: equipment Structure, pipe support, Steel walkway, vertical ladder, prepared steel Structure standard drawing, Materials take off, etc.
• Prepared Field change sheet.