|Thomas WooD |
|**** Midwestern Dr . Hixson, TN *7343 |
|Phone 423-***-**** . E-mail ********@*****.*** |
| |
|Technical Skills/Proficiencies |
|Strength in analyzing and improving engineering and administrative methods |
|Ability to interact with the office team and construction team - excellent |
|communication skills, both verbal and written |
|Excellent understanding of relevant office computer software, e.g. Ms Excel,|
|Ms Word, Ms Outlook, and use of AutoCAD |
|In-depth knowledge of Structural, Civil, and Electrical Codes (U.S. |
|Standards) |
|Proven ability to manage both large and small scale projects |
|Effective report and technical specification writing skills requirements and |
|techniques |
| |
|Work experience |
| | |
| |Alfred Benesch & Co Chattanooga,|
| |TN |
| |Project Engineer/Project Manager December 2010 - Present |
| |Design and inspect construction and implementation of Storm Water |
| |Pollution Prevention Plans of TDOT construction sites |
| |Managed contractor and subcontractors during weekly site inspections. |
| |Performed profile grades, roadway alignments, calculation of quantities for|
| |engineering estimates and preparation of technical report for development |
| |of transportation projects |
| |Lead QA/QC team member for site assessments TDOT projects in Region I and |
| |II. |
| | |
| |Worley Parsons |
| |Pipe Support Engineer July 2010- December 2010 Chattanooga, TN |
| |Assessed Nuclear Power Plant pipe routings with regards to stress and |
| |supports |
| |Performed piping engineering including pipe wall thickness calculations, |
| |branch connection reinforcement check, pipe supports check and equipment |
| |nozzle load calculations |
| |Communicated with field engineers to assist in nuclear power plant |
| |walk-downs for structural and electrical supports. |
| | |
| |Signal Wind Energy Chattanooga, |
| |TN |
| |Project Engineer February 2008 - January 2010 |
| |Developed AutoCAD layouts for wind farm and solar panel projects and |
| |assisted with construction implementation |
| |Performed calculations and improved designs of concrete foundations and |
| |road layouts, including storm drainage design for project roads and sites |
| |Consult leaders on how to improve turbine electrical protection and |
| |personal safety |
| |Coordinate work with subcontractors, attend customer meetings, and assist |
| |in finalizing necessary project expenses to ensure that material costs do |
| |not surpass economic constraints. |
| |Reviewed and approved soil analysis and soil boring logs; successfully |
| |collaborated with geotechnical engineer to develop and improve geotechnical|
| |reports |
| |Managed and improved engineering drawing reviews and approvals and |
| |document control system for all aspects/disciplines of wind farm and solar|
| |projects |
| |Assisted with and enhanced project scheduling, tracking & updating project |
| |drawings and specifications, financial analysis, investigation of |
| |non-conformance issues and implementation of quality control plan |
| | |
| |Assisted in engineering documents assembled close out documentations for |
| |Noble Great Plains Wind Park - 114 MW |
| | |
| |Assisting in development of Sheffield Wind farm |
| | |
| |Managed civil engineering and documentation for Flat Ridge Wind Farm - 100 |
| |MW |
| | |
| |Managed civil and electrical engineering and documentation for Valero |
| |Sunray Wind Farm- 49.5 MW |
| | |
| |Managed civil, electrical, mechanical, Operation and Maintenance |
| |engineering and documentation, and served as the engineering liaison for |
| |Chevron Casper Wind Farm - 16.5 MW |
| | |
| |Tennessee Valley Authority Chattanooga, TN|
| | |
| |Contractor, Spring 2005 - December 2007 |
| |Solved metering problems/questions for over 300 commercial customers |
| |Reviewed and maintained and programmed meter settings for all TVA owned |
| |substation meters |
| |Designed meter seal program and strengthened overall security of TVA meters|
| |using Microsoft Excel |
| |Supervised designing of interconnection wiring for newly installed SCADA |
| |RTU cabinets |
| |
|Education |
| |University of Tennessee at Chattanooga Chattanooga, TN-2002-2007 |
| |Bachelors of Science in Civil Engineering |
| |Tau Beta Pi - engineering honor society |
| |
|Relevant Courses |
| |Soil Mechanics, Surveying, Engineering Economics, Foundation Design I and|
| |II, Fluid Mechanics, Structural Analysis I and II, Structural Design, |
| |Water Supply and Waste Management, Engineering Statistics, Engineering |
| |Economy, Digital Electronics, Electrical Circuits I and II, |
| |Thermodynamics, Controls, Physics I, II, and III |
| |
|Computer Skills |
| |Operating Systems: Windows 95/98/XP/7, Unix |
| |Software: Experienced in AutoCAD 2006-1010, AutoCAD Civil 3D 2010, C++, |
| |Maple, Ms Office, Ms Excel, Ms PowerPoint, Ms Project, Ms Word, Primavera,|
| |Risa 2D, Risa 3D |