RESUME
Position : Structure/Piping/Architecture/HVAC
( inspector & supervisor)
Name : Johari Isham bin Ismail
Date of birth : 29 may 1967
Age : 45 years
I/C No : 670***-**-****
Nationality : Malaysian
Sex : Male
Status : Married
Qualification : Sijil Pelajaran Malaysia
Address : No 15, Jalan Bayu 23,
Bandar Seri Alam,
81750 Masai, Johor,
Malaysia
Contact no/ email : +601*-******* (Malaysia ) +849******** ( Vietnam ) /
********@*****.***
Training / Seminar attended
1985 Architecture Engineering at Federal Institute of Technology
1987 ASNT Level 11 for RT,MPI,DPI at Sime Darby Engineering
1987 Corrosion protection conducted by Berger Paint
1988 Welding Inspection course conducted by Sime Darby Eng.
1992 Leadership & human relation skills conducted by
Malaysian Employers Federation
1993 Blasting & Painting conducted by Promet Fabricator
Synopsis
More than 25 years of involvement with oil and gas in construction and inspection.
Working Experience
Oct 2011 – present Bien Dong Petroleum Operation Company ( Petro Vietnam )
( Client )
Position Architecture/Hvac ( inspector/supervisor)
Project involved Biendong POC Project PQP And HT Module
Scope of work HVAC
- Resolving all problems arises due to design changes and coordinate with field design engineers as and when necessary.
-carried out material inspection and HVAC testing.
- Daily monitoring that contractors perform all works in according to specification and requirements.
- Monitor main contractor daily progress.
- Documentation.
Architecture
-Monitor daily activities and work progress as per work planning.
- monitor quality of work and advise any site change.
-Daily Coordination Meeting with main contractor for smooth executing of works progress,quality and safety.
-carried out material inspection.
- carried out architecture inspection.
- Documentation
: Arashins Services (J) Sdn Bhd
Mac 2009-Aug 2011 :Seconded to Malaysia Marine Heavy Engineering
Kiyanly Turkmenistan
Position :Structure/Architecture/HVAC Supervisor
Project Involved :MAGTYMGULY RISER PLATFORM-A (MCR-A)
TURKMENISTAN BLOCK 1
Client :PETRONAS CARIGALI TURKMENISTAN SDN BHD
Scope of work Structure
- Site supervision and documentation works activities
- Supervise with Material Controller for dispatching construction material to site area.
- Resolving all problems arises due to design changes and coordinate with field design engineers as and when necessary.
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
- Daily monitoring that contractors perform all works in according to specification and requirements.
-in charge in skidding of topside for load out activities
-Documentation.
Architecture
-Monitor daily activities and work progress as per work planning.
-Daily Coordination Meeting with Client for smooth executing of works progress, quality and safety.
-carried out material, fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-Estimate and request to purchase any shortage of material.
-Documentation.
HVAC
-Monitor daily activities and work progress to achieve MCD
-liaising with client rep. for any change order or variation
Order
-monitor leak test/ smoke test
-Supervise and carried out inspection for HVAC work.
-Documentation
Sept-nov 2006 :Seconded to Modec international LLC Singapore at
Jurung Shipyard Singapore
Position :Piping Inspector
Project Involved :MODEC LLC FPSO
Scope of work -Witness main con inspection on piping activities.
( fit-up,visual,line check,hydrotest)
-Review of test package prior hydrotest.
-Drafting weld mapping fill in necessary requirement for each ISO drawing prior to specification.
-Drafting and controlling of as built isometric for test
Package as per site condition.
-Supervised and compilation of piping test package according
To test limit.
-Monitor work progress and reporting to Project Manager.
-Documentation control.
May-Sept 2006 :Seconded to Sime Darby Engineering Pasir Gudang
Position :Piping Inspector
Project Involved :MODEC LLC FPSO
Client :Modec International
Scope of work -Carried out material verification,fit-up and visual inspection.
-carried out line check before hydrotest.
-Witness hydrotest and leaktest
-Line check for reinstatement.
-Prepare test package
-Final documentation.
Mac 2005-May 2006 :Seconded to Sime Dardy Engineering
Position :Structure/Architecture Inspector
Project Involved :Bunga Raya ‘E’ Topside/Living Quarter
Client :Talisman Malaysia Limited
Scope of work Structure
-Monitor daily activities
-Monitor welder performance
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Architecture
-Monitor daily activities
-carried out inspection on flooring, Panelling, ceiling and
insulation install as per drawing requirement
-Fit-up and visual inspection on door and window.
-witness leak test on door and window.
-final check on equipment installation.
-Final documentation.
Oct 2003-feb 2004 :Seconded to Sime Darby Engineering Pasir Gudang
Position :Structure Inspector/PMT
Project Involved :MODEC BAOBAB Field Development Project.
Client :Modec International
Scope of work -Monitor daily activities
-Monitor daily progress
-Monitor welder performance
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Oct 2002-July 2003 :Seconded to Sime Darby Engineering Pasir Gudang
Position :Structure Inspector
Project Involved :B11 DRA Topside.
Client :Sarawak Shell Berhad
Scope of work -Monitor daily activities
-Monitor welder performance
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation
Dec 2001-Oct 2002 :Seconded to Sime Darby Engineering Pasir Gudang
Position :Structure Inspector
Project Involved :Angsi ‘C’ and ‘E’ Jacket and topside
Client :Petronas Carigali Sdn Bhd
Scope of work -Monitor daily activities
-Monitor welder performance
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation
May 2001-Oct 2001 :Seconded to Sime Darby Engineering Pasir Gudang
Position :Piping Inspector
Project Involved :Angsi ‘B’ topside
Client :Petronas Carigali Sdn Bhd
Scope of work -Monitor daily activities
-Monitor welder performance
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Line check for reinstatement
-Witness and monitor hydrotest
-Prepare test pack
-Final documentation
Apr 2000-Apr 2001 :Seconded to Sime Darby Engineering Teluk Ramunia
Position :Structure Inspector
Project Involved :Angsi ‘A’ and ‘B’ Jacket
Client :Petronas Carigali Sdn Bhd
Scope of work -Monitor daily activities
-Monitor welder performance
-Witness welder procedure and qualification test
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation
Nov 1998-feb 1999 :Seconded to Sime Darby Engineering Teluk Ramunia
Position :Structure PMT/QC
Project Involved :RDP-A and RCPP Jacket
Client :Petronas Carigali Sdn Bhd
Scope of work -Monitor daily activities
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-carried out material inspection,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation
July 1993-Mei 1998 :Promet Fabricator Sdn Bhd
Position :Piping Inspector
Project Involved :Tapis ‘E’ topside
Client :Esso Production Malaysia Inc.
Scope of work -Monitor daily activities
-Monitor welder performance
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Line check for reinstatement
-Witness and monitor hydrotest
-Prepare test pack
-Final documentation
Position :Structure Inspector
Project Involved :Sotong ‘A’ Jacket and Topside
Client :Petronas Carigali Sdn Bhd
Scope of work -Monitor daily activities
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Position :Structure/Piping Inspector
Project Involved :Eastman Chemical Copolymer Plant
Client :Foster Wheeler
Scope of work Structure
-Monitor daily activities
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
-Piping
-Monitor daily activities
-Monitor welder performance
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Line check for reinstatement
-Witness and monitor hydrotest
-Prepare test pack
-Final documentation
Position :Structure Inspector
Project Involved :Fabrication new barge
Client :President Marine
Scope of work -Monitor daily activities
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
Qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Position :Structure Inspector
Project Involved :Semco Gaint III ( fabrication jacket fendering system)
Client :SAIPEM
Scope of work -Monitor daily activities
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Position :Structure/Architecture inspector/PMT
Project Involved :Lawit ‘A’ Topside
Client :Esso Production Malaysia Inc.
Scope of work Structure
-Monitor daily activities
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Architecture
-Monitor daily activities
-carried out inspection on flooring,Panelling, ceiling and
insulation install as per drawing requirement
-Fit-up and visual inspection on door and window.
-witness leak test on door and window.
-final check on equipment installation.
-Witness Commisioning of equipment.
-Final documentation.
Position :Structure Inspector
Project Involved :Calm buoy
Client :Petronas Pernapisan Sdn Bhd
Scope of work -Monitor daily activities
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Position : Piping/Architecture Inspector/PMT
Project Involved :Guntong ‘D’- 168 Man Living Quarter
Client :Esso Production Malaysia Inc
Scope of work Structure
-Monitor daily activities
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Architecture
-Monitor daily activities
-carried out inspection on flooring,Panelling, ceiling and
insulation install as per drawing requirement
-Fit-up and visual inspection on door and window.
-witness leak test on door and window.
-final check on equipment installation.
-Witness Commissioning of equipment.
-Final documentation.
Position :Structure/Architecture Inspector/PMT
Project Involved :D35-QA Living Quarter and Module Support Frame
D35 Telecom tower
D35-ra Riser Platform and Bridge
Client :Sarawak Shell Berhad
Scope of work Structure
-Monitor daily activities
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Architecture
-Monitor daily activities
-carried out inspection on flooring,Panelling, ceiling and
insulation install as per drawing requirement
-Fit-up and visual inspection on door and window.
-witness leak test on door and window.
-final check on equipment installation.
-Witness Commissioning of equipment.
-Final documentation.
Dec 1989-Mei 1993 :Malaysia Shipyard And Engineering Sdn Bhd
( Malaysia Marine Heavy Engineering )
Position :Architecture QC/PMT
Project Involved :Bardegg Topside And Living Quarters
Client :Petronas Carigali Sdn Bhd.
Scope of work Architecture
-Monitor daily activities
-Witness Slump and Cube test for grouting
-Equipment and material check and advise vendor any changing
or modification as per site,client or specification requirement
before send it to the yard
-carried out inspection on flooring,Panelling, ceiling and
insulation install as per drawing requirement
-Fit-up and visual inspection on door and window.
-witness leak test on door and window.
-final check on equipment installation.
-liaising with client rep for any change order or variation
Order
-Witness Commissioning of equipment.
Position :Structure Inspector
Project Involved :BDO 6 Megaskid Topside
Client :Petronas Carigali Sdn Bhd
Scope of work -Prepare weld summary and update
-Monitor daily activities
-Monitor PWHT
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Position :Structure Inspector
Project Involved :Baronia I and J Jacket
Client :Petronas Carigali Sdn Bhd
Scope of work -Prepare weld summary and update
-Monitor daily activities
-Monitor PWHT
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-carried out material,fit-up and visual inspection.
-liasing with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Position :Structure Inspector
Project Involved :Dulang ‘D’ Topside
Client :Petronas Carigali Sdn Bhd
Scope of work -Monitor daily activities
-Monitor PWHT
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-Prepare weld summary and update
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
-Final documentation.
Dec 1986-Nov 1989 :Sime Sembawang Engineering Sdn Bhd
( Sime Darby Sdn Bhd )
Position :Structure Inspector
Project Involved :Dulang ‘A’ and ‘B’ Jacket
Client :Petronas Carigali Sdn Bhd
Scope of work -Prepare weld summary and update
-Monitor daily activities
-Monitor PWHT
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Position :Structure/Piping/Vessel Inspector
Project Involved :Palas ‘A’ Gas Injection Module
Client :Petronas Carigali Sdn Bhd
Scope of work Structure
-Prepare weld summary and update
-Monitor daily activities
-Monitor PWHT
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Scope of work Piping
-Prepare weld summary and update
-Prepare of test package prior hydrotest.
-Drafting weld mapping fill in necessary requirement for each
ISO drawing prior to specification.
-Drafting and controlling of as built isometric for test
Package as per site condition.
-Supervised and compilation of piping test package according
To test limit.
-Carried out line check and come out punchlist.
-Documentation control.
Position : Structure Inspector
Project Involved :Seligi ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc
Scope of work -Prepare weld summary and update
-Monitor daily activities
-Monitor PWHT
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Position : Structure Inspector
Project Involved :Guntung ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc
Scope of work -Prepare weld summary and update
-Monitor daily activities
-Monitor PWHT
-Attended progress meeting with client
-Monitor daily progress
-Monitor welder performance
-Conduct welding procedure and welder
qualification test (WPQT&WQT)
-carried out material,fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-monitor NDT
-Final documentation.
Sept 1986-Nov 1986 :Consultant Inspection Testing Services
Position :Assistant QC Inspector
Project Involved :Guntung ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc
Structure -Prepare weld summary and update
-Assisting inspector to witness PWHT
-Assisting inspector to witness welding procedure
and welder qualification test (WQT&WPQT)
-Assisting inspector to carried out material,fit-up and visual
inspection
-Prepare inspection report