Resume:

MARIO N. PEÑEDA

**** ** ***** *****, *********, CA 92026

(T) 760-***-**** (C) 619-***-**** (E) ********@*****.***

Objective

A challenging Quality Control Manager involving all phases of construction, restoration, and modernization from conceptualization, designing, building, planning, scheduling, cost control, quality control management to project close out where a demonstrated record of timely and cost effective completion of the project is important both to the company and its clients.

SUMMARY OF QUALIFICATIONS

• Over ten years of responsible construction management. • Graduate BSME, BSEE, Phil.

• EIT, CA • CA Registered ACE.

• PEE, PME, Phil. • Responsible Construction Management

• ICC Certified Residential Building Inspector. • Excellent interpersonal, oral and written communication skills.

• Certified Installer of Honeywell hardwired and wireless Fire Alarm and Security systems. • Knowledge of environmental control in compliance to EPA and NAVFAC UFGS guidelines.

• Well organized • Team Player

• Work well with at all levels from client to architects. • Excellent computer skills in MS Word, MS Excel, Power Point 2000, MS Access 2003,

• Successfully completed U.S.A.C.E. Construction Quality Management for Contractors 2011, • Building Inspection and Records Management, spring 2005.

• Project schedule • AutoCAD 2006

• UBC, UMC, UPC, SMACNA, Cal Title 24 • California State Fire Code

• American with Disabilities Act Guidelines • LEED Sustainable Building Workshop.

• Occupational Safety Code • RS Means

EXPERIENCE

Straub Construction, Inc. Construction Quality Control Manager – 01/03/11 to Current

Received an Outstanding Performance Evaluation from the US Army Corps of Engineers in the Design and Construction for renovations to the Long Beach Veterans Administration Research Laboratory ($ 4 mil). The contract included tenant improvements throughout multiple areas of the facility, design and construction phase task to renovate laboratory spaces. The design discipline included Architectural, Mechanical, Plumbing, Electrical and HVAC. Trades included but are limited to demolition, carpentry, painting, plumbing, rigging, pipe fitting, mechanical, electrical and low voltage security. Additionally, the contract included installation of a new security surveillance system with a fiber optic routing plan, condensing unit, and an 80 ton chiller. The work was completed within an active functioning VA Research Lab requiring a high level of infection control measures and protection of all existing building systems and services. Recommended best value engineering design and construction of the 1 Gigabyte Security System Network Communication Infrastructures. Spearheaded successful commissioning of the New Emergency Power System, new Building Automation Control of the new 80 ton Emergency Chillers and chilled water base load connection to Central Plant. Generated substantial energy savings to the owner by connecting the new by-pass chilled water lines to the central plant earlier than scheduled.

Performed constructability and design review of the following projects as to their layouts, design and specifications of the HVAC; water and sewage (plumbing): architect and engineer (A&E) contract and in-house designs to determine mechanical compatibility, maintainability and functionality:

• N62473-09-C-1228, P-908, P-909 AND P-686, Design-Build USMC Bachelor Enlisted Quarters – Package 9, Marine Corps Air Ground Combat Center, Twenty Nine Palms, CA ($92mil).

• W912PL-10-D-0040 Design and Construction of New Boulevard Border Patrol Station, San Diego County, CA ($29.5 mil).

• N62473-08-D-8616 Design and Build Project, P306 Warrior Physical Training Facility, NAS, Fallon, Nevada ($9 mil).

RQ Construction, Inc. Quality Control Manager/Design QC Manager - Mar, 2008 to Nov. 2010.

Completed managing the Quality Control Plan of the Satellite Control Facility, VAFB, CA ($39.0 mil), checked plans, reviewed submittals & inspected delivered materials and worked performed whether conforming to the contract drawings and specifications, codes and standards such as: SCIF, NFPA, UL, IAPMO, UPC, UBC, UMC, UFC SMACNA, ASTM ANSI, AWS,ASHRAE, State, Federal & Military standards. Performed three phases of inspections until the project was fully commissioned. Proactively identified various design deficiencies and corrected leading to a successful completion of the project ahead of time despite the odds with only one window of opportunity to place the new substation to service.

Promoted to Design QC Manager and reviewed, analyzed, evaluated, identified and provided alternative solutions and corrections to mechanical, electrical & plumbing design drawings and specifications of the following projects prepared by the A&E and subcontractors not in compliance to project contracts, design criteria, conflicts, life safety, mechanical codes, electrical codes, plumbing codes, fire codes, federal & military standards (ETL, Security. Guides, UFGS and NAVFAC) as specified per contract documents:

• W91238-09-C-0012 Command and Control Facility, Division Headquarters, Fort Bliss, Texas.

• W912PL-09-C-0011 New Child Development Center (Bldg. 1322), Fort Irwin, California

• W912PL-09-C-0025 Design Build, Company Operations Facility, Fort Irwin, California.

Cornerstone Building Group – Mar. 2006 to Feb. 2008, Construction Quality Control Manager/Supt.

Received Certificate and Plaque of Appreciation from Cornerstone Building Group in recognition of the valuable contributions to the company in attaining an 8A JOC contractor status from the ROICC office. Comprised project awards of more than forty Facility Management projects ($8.0mil total) in 2007. Facilitated early completion of the projects, improved productivity through proper coordination of all subcontractors in the execution of complex definable feature of works and increased profitability. Performed in-house project designs, pro-actively identified solutions related to work and code conflicts, generated high job acceptance rate by implementing an effective quality control and safety program. Developed an effective Environmental Control Plan to protect endangered species around San Mateo Creek that lead to none occurrence of accidental spillage of construction waste water to the river and effective implementation of various BMPs to control runoff and waste waters. Identified best investment solutions to conflicts in designing and replacing with a horizontal-directionally bored 12” diameter HDPE sewer pipe crossing the San Mateo River and surpassed specified system performance of the projects. Generated substantial savings/profits by performing various in-house MEP designs and development of the project specifications than employing high paying consultants such as the Armory Addition of Building 33068 and Lift Station project in Area 62, MCB Camp Pendleton. Identified appropriate measuring instruments to be used in the Hydrogen Fueling Station pilot project in Camp Pendleton. Resolved conflicts about the installation suitability of the new Fire Detection systems for the Hydrogen Fueling Station and Armory Building Addition in Area 33, Camp Pendleton.

Testing Engineers of San Diego, San Diego, CA, Sept, 2001 – Jan. 2006, Construction Quality Control Manager

Successfully managed and completed managing the Quality Control requirement of the following projects:

- Repair / Improve BEQ 210632 Del Mar, Area 21, Camp Pendleton. ($6.5mil).

- Improvement of water distribution and upgrading the Iron-Manganese Plant, Camp Pendleton ($25.0 mil).

- Improve/ Remodel BEQ (Building 62430 and Building 62431) San Mateo, Camp Pendleton. ($9.0 mil).

- Repair /Improve Building 22101 for MSSG, at Camp Pendleton. ($2.0mil).

- Statewide facility condition assessment of the various military bases in California and Arizona.

W.R. Chavez Construction, Inc. Poway, CA, Nov. 2000 – Sept. 2001

Quality Control Manager / Building Inspector

Completed and managed the quality control for Task Order #005, Simulation Center, at Camp Pendleton. ($2.2 mil). Upgrade Electrical Distribution of MCTSSA, Camp Pendleton, CA ($1.75 mil). Received an outstanding performance rating from the ROICC Officer for providing cost-effective quality control and problem solving. Corrected problems on energy management systems, HVAC, IDS, PDS, fire alarms, underground sewer, domestic water, fire sprinkler system, structural and architectural unforeseen actual conditions. Completed the projects three months ahead of the contractual completion date. Tracked, expedited deliveries of critical materials and provided subcontractors support to the full compliance of the specifications, managed the third party field tests & inspections, and yielded high acceptability of the completed project. Received no OSHA or safety violations.

L & S Construction Company, Inc. Maite, GU, USA May, 1997 - Oct., 2000

Project Manager / Superintendent

- Construction of the Maintenance Complex of Guam Power Authority.- Installation of the Incinerator of US Naval Medical Center in Guam.

- Construction of Jollibee Food Chain Stores.

- Installation of Utility Steam Boiler of Guam Medical Hospital.

- Installation of Air Compressors and distribution lines Aircraft Hanger in Andersen Air Force Base, Guam.

- Construction of various concrete-built residential houses.

Fargo Pacific, Inc., Tamuning, GU, USA, Sept. 1993 – April 1997

Project Engineer / QC Manager

Started as a Project Engineer assisting on revitalization of 75 military housing projects Phase I of Lockwood Terrace in Naval Station up to $5.5 million in size. Re-awarded by another 75 military housing projects Phase II of revitalization ($ 5.1 Million). Other projects included are Multi-trade VI projects in the Navy, 75 projects in the first Option Year ($ 5.6 Million) and 82 projects in the second Year ($ 6.493 Million). Projects involved renovation, repair, retrofit and build-out, rehabilitation, conversion and new construction. Promoted to QC Manager and managed Air Mobility Command Maintenance Control Complex, Andersen Air force Base, Guam, $ 2.75 Million. Built project according to the company’s goal for quality. Minimal reworks and high acceptance rate, higher profit margin, and earlier completion date. Eliminated OSHA citations and job site accidents.

JWP Technical Services, Maite, GU, USA June, 1991 – August, 1993

Supervisor/Estimator

Effective supervision in the construction of the new HVAC system of Hilton Hotel Expansion project and 13 stories Alupang Beach condominium/hotel ($2.5 mil). Performed bid estimates of high-rise, commercial and residential building. Administered subcontract agreement. Improved and developed the in-house Estimating Program. Solicited subcontractor’s proposal and prepared subcontract agreement. Prepared shop drawings, purchased and delivered materials. Supervised the installation of the HVAC Systems for Alupang Beach Tower, Guam (2.5 mil) and of Hilton Hotel Expansion Project (15.0 mil). Provided a pro-active identification of problem areas, implemented various acceptable work and mechanical design changes cost effective solutions to the existing conditions. Commissioned, tested and balanced the systems.

National Steel Corporation, Phil., Oct. 1978 - May, 1991

Engineering Management Trainee – Sr. Systems Engineer.

Started as Engineering Management Trainee and promoted four times to Sr. Engineer in Construction. Performed economic and feasibility studies, method improvements, and energy conservation strategies. Performed project planning, project coordination, engineering review, supervised installation, conceptual design, project development, start-up and commissioning. Provided effective supports to project manager. Identified critical issues either economic, technical feasibility or timely execution of the project. Requested by the manufacturer, Tippins Machinery, Inc. in Pittsburgh, PA and to work closely with the design engineers in upgrading, integration and expansion of a multi-million dollars Steel Manufacturing complex of National Steel Corp as to codes and performance specifications.

Education /Training:

B.S. Degree, Electrical Engineering, CIT, Phil. – 1978

B.S. Degree, Mechanical Engineering, CIT, Phil – 1976

Record Management, San Diego City College, California, spring 2005.

Autocad 2006, San Diego City College, California, spring 2005.

MS Access 2003, San Diego City College, California, spring 2005.

Honeywell Fire Lite Mini Scan Academy (Hardwired Fire and Security Systems), Oakland, CA, Aug 30, 2007.

Honeywell Wireless Fire Alarm Technologies, On Line Training, Nov. – Dec 2007.

SEL Protective Relaying and Fault Location Considerations.

Transformers-Protect, Control and Monitor

Communications and Integration Technology for Network and Interconnection

Secure Engineering Access in Power Substation

Control and Monitoring Using Automation Controller

Power Distribution and Power Coordination

Sensitive Compartmented Information Facility (SCIF)

USACE HMA Airfield Pavement Workshop

Professional Registrations/Certifications:

• U.S.A.C.E. Construction Quality Management for Contractors, March 6-7, 2001

• Construction Quality Control Management for Contractors #784, 2011

• Military EM 385-1-1 40 Hour SAFETY (UCSD9300), 2011

• CAL OSHA Standard, Excavation, Trenches, Earthwork, May 2001.

• Engineers-In-Training, California – 1991.

• ICC Certified Residential Building Inspector.

• California registered Alarm Company Installer CA Reg. ACE #87143.

• 10-Hour CAL OSHA Training Course & 30-Hour CAL OSHA Training Course.

• Certified installer of hardwired and wireless Honeywell fire alarm and security system

• California Contractor’s License “B”.

• Licensed Professional Engineer, ME & EE, Phil.

• Member, International Association of Plumbing and Mechanical Official (IAPMO).

• Member, National Fire Protection Administration (NFPA).

• Member, American Welding Society.

Reference: Available upon request.

End