I am an enthusiastic and professional Civil Engineer, who enjoys being part of a successful and productive team. I am quick to grasp new concept, and to develop innovative and creative solution to problems. I am able to work well on my own initiative and can demonstrate the high levels of motivation required to meet the tightest of deadlines. Even under significant pressure, I possess a strong ability to perform effectively.
Name: Sumair Ahmed Solangi
Profession: Civil Engineer
Job Position Target : Site Engineer / Quality control Engineer / Quantity Surveyor
Date of Birth: 14th March, 1983
Nationality: Pakistani
Religion: Islam
Marital Status: Married
Cell Phone. 009***********
Mailing Address: Gullistan-e-sajjad block 3d, house no.38/39
Hyderabad, sindh Pakistan
Work Experience: 5 years in different sectors of engineering departments like
Telecom, Building, Roads, Structures.
Job Status: Full time
Current Country Location: Saudi Arabia.
Current Salary: 2500 US$ / Month
Expected Salary: 3500 US$ / Month
E-mail: ********@*****.*** / **************@*******.***
To build a strong career in Civil Engineering by applying my specialized skills that I possess and to work under a challenging environment with my skills and knowledge and for the betterment of organization.
• B.E (Civil Engineer)
Quaid –e- Awam University of Engineering Science and technology – Pakistan.
• Water Logging & Soil Stalinization
• Proficiency in Using Auto CAD 2000, 2004, 2006
• Good Knowledge of Splicing And Testing
• Operating Windows Software applications ( MS – Office Automation )
• Internet & e – mailing division
July 2010 up to date
PRESENT EMPLOYMENT
Company Name:
Hyundai engineering & construction co. ltd
Clint:
Saudi Aramco Oil Company Saudi Arabia
Project Location:
Khurais Central Processing Facilities Project Gas Contract Package (K G C)
Current Job Titled:
Site Engineer
• Responsibilities:
A). Monitoring of sub-contractor work activities and checking of materials required revised isometric.
B). Ensure all RFI are implemented.
C).Monitoring of work to ensure installation as per the specifications
D).Coordinates to Subcontractor Area Manager to instruct the following isometric modification, latest revision.
E). Detail scheduling of works daily and weekly.
F). Execution of works at the site through area supervisor and foreman.
G). Precast Manholes casting for different department and monitoring as per design and installation.
Present Employment Status:
Full Time
Sep 2008 To March 2010
Company Name:
Sitaf Saudia Co. Ltd.
Current Job Titled:
Asst: Operation Manager and Asst: OSP Manager
• Responsibilities:
A). OSP Designing
B). OSP Engineering implementation
C). Contract Bidding
D). Quantity Estimation
E). Dealing with 90-120 personnel including mechanics.
F). Daily reports to the Executive Manager of Operations
G). Preparing Procurements
Dealing with Different companies like as
1. ELFIT Arabiya.
2. Middle East Fiber Cable Manufactures.
3. Riyadh Cables.
4. T. Nagadi Performed Concrete Factory
1. Project Location:
Madina
• Clint:
Mobily
• Job titled:
Project Manager
• Responsibilities:
Preparation of Binders, Shop drawing, field survey reports, attending client meetings, scheduling / Planning, Quantity estimating, Quality controlling preparing all the documentation as required, Commissioning of FOC with associated civil works.
2. First Project:
Relocating and shifting FOC
• Clint:
Ministry of Air Defense Riyadh
• Job titled:
Trainee Engineer
Locating
OF utility cable (STC, Electric), sewerage line, Water supply line.
Excavation / Trenching.
For laying PVC Ducks According to General Specification
Supply and Installation
PVC Pipe / HDPE Pipe along with Standard spacer
FOC Cable along with standard Warning Tape
Hand Hole /manhole
Concreting
Asphalting (Milling and paving)
January 2007 to May 2008
Company Name:
Saadullah khan & Brothers Engineering Construction
Involved in Projects:
1. Project:
Widening and Improvement of National Highway N – 25, section - 1, ICB – III Quetta.
• Clint:
National Highways Authority, Islamabad Pakistan.
• Job titled:
Structure Engineer/Quality Control Engineer.
• Responsibilities:
Structure Sites
Estimating quantities, Plotting Shop drawings of culverts & bridges, lay outing Bar Bending Schedules and executing the work, scheduling and planning the available site machinery according to work condition, Preparation of sub contractor’s bills, Progress reports weekly and monthly. And monitoring the site activities. Precast Pipe Culverts Installation Box Culverts Installation.
• Quality Control section
According to responsibility of QC he is engage each and every single step of any structure construction. Verifying the material like sand, cement, bricks etc as per standard of client or as per specification, taking samples for laboratory test on the basis of test results approving the materials,
April 2006 to January 2007
Company Name:
Saadullah khan & Brothers Engineering Construction
2. Project:
Widening and Improvement of National Highway N – 25, section – 1, ICB I & III, Quetta.
• Clint:
National Highways Authority, Islamabad Pakistan.
• Job titled:
Jnr. Planning Engineer
• Responsibilities:
Estimating quantities, Preparing Interim payment certificates IPC, Progress Reports monthly and weekly, Plotting X-Section of Roads, Shop drawings of culverts
September 2005 to April 2006
Company Name:
Sardar Muhammad Ashraf D.Baluch Company (Pvt.) Ltd
3. Project:
Nawabshah-Padedan Road Project P-2 (ADB Assisted)
• Clint:
National Highways Authority, Hyderabad Pakistan.
• Job titled:
Asst: Office Engineer.
• Responsibilities:
Plotting of X-Sections and Shop drawings of Culverts with AUTO CAD,
and other type of office work.
Job Location: Anywhere National or International.
Job Category: Civil Engineer
Employment Status: Full Time
Currently include: History Books, Knowledge Based Magazine.
Music, English Movies.