Gee Kuen Chong
****, ********* *******, ***** **** CA • ******@*****.*** • 408-***-****
Summary
Accomplished Electrical Engineer with over ten years broad experience from complex electrical and mechanical system design for semiconductor fabrication tool to PCB design for consumer product. Specializing in R&D, new product development, and manufacturing industries. Also experienced technical and daft lead with solid communication skills, who executes with a proactive attitude and a team player mentality to accomplish the final goal.
Design skills
AC power system distribution design, PCB design, DC power supply
design for capital equipment system, components selection.
Software tools
AutoCAD, OrCad, Allegro, LT Spice, Altera Quartus II, Labview,
Relex reliability tool, GE Fanuc PLC software.
Hardware tools
Oscilloscope, function generator, Logic analyzer, soldering tool, Lecroy
USB protocol analyzer - Advisor
Technologies
Consumer’s touch solution system, complex electrical and mechanical system
Professional Experience
Electrical Engineer
Bentek,
San Jose,CA
2011–Present
• Design, develop PV array re-combiner system for large scale 1000V PV array system.
• Manage drafter generating system assembly drawing from concept design to production release.
• Develop test fixture for subcomponent requirement testing.
• Generating ECO/ECR process on daily basis for product improvement and part obsolescence issue.
Development Engineer
Tyco Electronics – Elo Touch System, Menlo Park, CA 2007 –2011
• Saved $20k per business quarter in production costs by identifying component issue on a pilot run and introduced solution immediately, also preventing the company from losing profit and incurring product recall
• Customized Tyco product for Samsung according to customer specification resulting in a 5 million dollar profit for Samsung over a 3 year period.
• Designed, developed touch solution with STMicro’s cortex CPU for system used in consumer products, medical device, and IDS (Information Digital Signage).
• Generated schematic, product specification, DVT test specification.
• Designed touch system with USB, SPI, I2C communication interface base on market requirement.
• Managed and reviewed PCB board layout for projects with drafter making sure it met the PCB design fundamental rule to prevent EMC problem.
• Performed EMC testing for new product and solved EMC issue during testing and applying new solution. This help the company cut down product recall due to EMC issue and also prevent revenue lost.
• Selected component for new development engineering projects base on design requirement and also selected new components for sustaining projects to keep production line in production.
• Reviewed customer’s schematic base on Tyco’s reference design and made recommendation for component selection.
• Generated documentation, including BOM creation, MCD/AVL creation, and test specification.
Electrical Engineer III
Applied Materials, Sunnyvale, CA 2006 –2007
• Designed, developed electrical control and electrical power system including, I/O design, and performed components selection.
• Developed custom hardware and software data collection program for test fixture, process control system to enhance product reliability. In addition, generate engineering design specification document for test fixture and production units.
• Worked in AutoCAD in daily basis, hands-on experience in PLC and PC distribution I/O control system, extensive in Oracle BOM structure database, and electrical and mechanical assembly drawing.
Electrical Engineer
(Watkins-Johnson/Silicon Valley Group)ASML, Scotts Valley , CA 1999 - 2006
• Co-designed multifunction electrical control and electrical power system including, I/O design, and perform components selection for wafer fabrication system.
• Worked with control systems, AC and DC power distribution system, PCB design, PID loops, temperature control system, safety interlock circuits, VME control system, and server controller system.
• Reverse engineered and re-designed products to improve reliability meet UL and CE standards, reduced cost, and reduced system complexity.
• Managed electrical lab base on safety requirements and managing manufacturing and final test teams to meet production and prototype schedules.
• Managed budget for electrical system builds.
• Directed activities to ensure that manufacturing, installation, and operational testing conformed to functional specifications and customer requirements.
• Reduced system building cost from $300,000 to $200,000 keeping system original specifications in place.
• Interfaced with customer/clients/vendors on a regular basis to report project’s status through presentations, reports.
• Traveled to Germany to perform first production startup and provided technical support to customer. In addition, troubleshot and solved all technical problems on the customer site.
• Familiar with NEC, UL, and CE compliance and participated on EMC testing for production tool prior ship to customer site.
• Accomplished product improvement project from conceptual design to pilot released in tied schedule (3 months) without jeopardized product quality and shipment schedule.
Education
Bachelor of Science in Electrical Engineering
Oklahoma State University, Stillwater, Ok